Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.2 LAccepted-AOC DANGALPARA P O P S SURI BIRBHUM PIN 731101 | SURI | BIRBHUM | WEST BENGAL | 731101 | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹39.2 L+₹2,964 (0.08%)Rejected-AOC 107 FCI GODOWN ROAD PO PS SAINTHIA BIRBHUM WEST BENGAL 731234 | SAINTHIA | BIRBHUM | WEST BENGAL | 731234 | L2 | Rejected-AOC Being L2 Bidder | |
| 3 | L3₹39.2 L+₹4,668 (0.12%)Rejected-Finance INDIRA HATIA BIRBHUM | BIRBHUM | BIRBHUM | WEST BENGAL | L3 | Rejected-Finance Being L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹64,604
Closing Date
30 Aug 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,PWD Electrical
Laldighipara, P.O. Suri Dist. Birbhum. Pin. 731101 Near Suri Sadar Hospital
Annual Maintenance work related with Lighting System installed at Junior Engineer I under Rampurhat Electrical Sub Division, P.W.D, during the period for 365 days, including Holidays.
2022_WBPWD_393514_1
BIRED/14/e-NIQ (1st call) of 2022-2023
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Rampurhat
Please refer Tender documents.
8 documents required · 8 mandatory
₹64,604
O/O the Executive Engineer,Birbhum Electrical Divn
23 Sept 2022
4 Aug 2022
2 Sept 2022
4 Aug 2022
30 Aug 2022
8 Aug 2022
8 Aug 2022
Amount
Annual EI Maintenance work related with Lighting System (including Sub Station & Panel System) installed at Junior Engineer- I, Rampurhat Electrical Sub Division under Birbhum Electrical Division, PWD. During the period for -365 days.. including Holidays. The Agency has to depute : i) 01 (One) no Highly Skilled Electrician (Grade-I), 01 (One) no Eletrician (Skilled), and 02 (Two) nos Helper (unskilled) or as per direction of EIC.(1st Shift). ii) 03 (Three) nos Eletrician (skilled), and 03 (Three) nos Helper (unskilled) or as per direction of EIC. (2nd Shift). iii) 01 (One) no Eletrician (Skilled), and 01 (One) no Helper (unskilled) or as per direction of EIC.(3rd Shift)
Charges for Comprehensive Maintenance work related with Fire Detection Scheme installed under Junior Engineer- I, Rampurhat Electrical Sub Division under Birbhum Electrical Division, PWD. During the period for -365 days.. including Holidays. (Rampurhat Govt. Medical College & Hospital and CMOH office etc.). Agency should be deputed 01 (one) no experienced workman(Unskilled) for Three shift. Maintenance comprises : Integrated Control Panel, smoke cum heat detector, heat detector, LASER detector, Manual call point, Fault Isolator module, control module and all accessories related to Fire detection scheme on preventive or scheduled mantenance as well as on call within 24 hrs by expert workmen having at least three year experience in relevant fire detection company incl. charges of fault parts as per direction of EIC.
STANDARD OF WORKMANSHIP: - Highly Skilled Electrician having:- I (a), I (b), II, III, IV, V. and Skilled Electrician having:- I (a), I (b), IV, V. valid workman permit issued from West Bengal Licensing Board.
SCOPE OF WORKS: - 1.The Scope of maintenance of electrical installation includes main LT/MV distribution lines etc. to each block/floor, Switch board, Panels, all electrical lighting & power points, fittings, fixtures, etc. within the block/floor including compound lighting as well as electrical Installation up to switch Board within the complex of Rampurhat Govt. Medical College and Hospital, CMOH Office & Nalhati Section office of PWD(Civil), Office of the Assistant Engineer, PWD(Civil), PWD Road's office etc which are being maintained under Rampurhat Electrical Sub-division, P.W.D, under Birbhum Electrical Division , P.W.D(Electrical). 2. Scope of works does not cover operation of lift, window/split type Air-conditioner machines and other sophisticated electrical & electronic machineries like computers, UPS etc installed in the buildings.
TERM & CONDITIONS:- 1. Maintenance & up-keeping of the above electrical installation in safe and proper working condition. 2. All the fitting, fixture, panel board, PBDB, SPNDB, Main-switches & other Electrical Installation inside all the block/floor/bldgs. as well as for compound lighting installation must be kept in a tiptop condition by cleaning of all the said electrical equipments, dusting off accumulated dirt, cobweb etc. and all the cleaning materials like detergent etc. are to be supplied by the agency free of cost. 3. Checking & maintenance of Modular switch/ tumbler switch/piano key switch, fans, light fittings etc. complete for their safe and proper functioning. Maintenance work in respect of the above-said electrical installation requires free supply of pretty materials like fuse wire, insulating tapes, screw, washers, small nuts & bolts etc. to ensure the smooth running of the installation as per instruction of concerned Executive Engineer, Assistant Engineer, Junior Engineer. 4. The head electrician will supervise maintenance of the whole Electrical installation incl. maintaining proper Log book. 5. Separate Log book is to be maintained for L.T. installation & H.V. installation. The daily record of the Log book is to be signed by the head electrician of the contractor and verified & signed by concerned Junior Engineer, P.W.D (Electrical) & Assistant Engineer, P.W.D (Electrical) and the same should be sent to the Executive Engineer concerned through proper channel at the time of submission of bills.
6. Recording of various electrical parameters of different L.T. panel board, BDBs, Main switches etc, recording of different parameters of 11KV H.T. Sub-station(2 nos.) equipments, testing of Insulation Resistance, Earth Resistance etc. are to be put-up in Log book in regular manner and the necessary working report in this respect to be submitted to the concerned Assistant Engineer, (Electrical) & Junior Engineer, (Electrical) everyday. Infrared Thermometer should be used in measuring temperature of electrical equipments like Transformer, H.T. VCBs, BDBs, L.T. panel boards etc. regularly to find out any abnormalities and that measurements are to be recorded in Log book compulsorily in proper way everyday. 7. In case, any abnormal reading is noticed, then the same should be rectified/set right immediately by taking prompt, appropriate & effective measures/actions by proper recording & reporting to the concerned Assistant Engineer, (Electrical) & Junior Engineer, (Electrical). 8. To keep close watch on overall condition of the E.I. and performance of different accessories & submission of periodical report to the Junior Engineer concerned. 9. Maintenance materials viz. Incandescent/LED lamps, Main switches , Power DB, SPN BDB, Main & Sub-main cables, fluorescent tubes, Chokes, Ignitors, Condensers etc. will be supplied by the Department and the dismantled unserviceable materials are to be deposited to the concerned Junior Engineer, against which fresh materials are supplied by the Department. 10. The agency has to depute sufficient nos Highly/skilled electrician, and unskilled electrician helper (having sufficient experience in the said job) for call received from respective authority over 24 hours distributing each shift as directed by the E.I.C for carrying out the maintenance work smoothly round the clock including holidays with due regard to the safety of the maintenance staff. Each and every maintenance staff duty should not over 8(Eight) hours per day. 11. All type of maintenance & operation tasks incl. proper testing, checking etc. with necessary action of preventive & corrective/rectifying measure in case of any fault/abnormality for . 11KV/415V Sub-station are to be accomplished with proper care, safety & precaution measure and all these tasks are to be recorded in separate Log book which are to be signed by highly skilled Electrician deployed by the contractor with duly verification & signed by concerned Assistant Engineer(Electrical) & Junior Engineer(Electrical) in regular manner.
12. The agency will have to immediately replace any or all members of the electrical maintenance staff, who has been reported against. 13. The agency shall provide photo identity cards to all the maintenance staff employed, including substitutes. 14. . In case of power failure or development of any unfavourable situation, the agency will have to communicate with concerned WBSEDCL authority and extend co-operation to concerned WBSEDCL authority in restoration of power supply. Meanwhile the agency will have to operate the switching mechanisms of interconnections among available sources at suitable locations to maintain power supply at important locations by monitoring electrical loads in consultation with concerned Junior Engineer/Assistant Engineer. 15. The On-duty Maintenance Staff must wear specially designated fluorescent coated outfit denoting P.W.D ( Elect) clearly provided by the agency. 16. The Agency should depute his Supervisor to supervise the whole electrical components in the whole campus as per scope of the works. 17. The agency will take care to prepare the requisition of materials required for the maintenance within his jurisdiction well in advance and submit the same to the concerned Junior Engineer so that no delay in repair / replacement cause trouble in the system & hampering of the Hospital service thereof. 18. The agency will also have to attend immediately emergency calls at the site with staff, tools etc. on demand.
19. Any major shut down or fault should be brought to the notice of EIC immediately in writing and over telephone for further course of action. 20. The Agency must have a routine check-up of the entire system to prevent any damage / fire hazard due to loose contact in the Elecl. Installation. 21. Insulation test with the help of Megger for the entire Electrical Installation as well as earth resistance of the earthing installation are to be carried out in the presence of concerned Assistant Engineer/Junior Engineer and the result thereof is to be furnished by the Engineer-In-Charge. 22. Failing of compliance of any of the above-mentioned points, this Department possesses the right to deduct the cost from the bills of the agency on prorate basis determined by the Engineer –in-charge. 23. Space for accommodation of staff of the agency will be provided by the competent authority. 24. The Agency is required to submit a copy of Challan for permission of the Junior Engineer before taking any material out of the premises. 25. The agency must have their office & Telephone contact with Mobile no. in Suri/Rampurhat /Bolpur and the same should be intimated to this Department in writing. The telephone call should be responded without delay. 26. The agency shall maintain one attendance register at site, to be signed regularly by the staff on duty and the same should be authenticated/verified by the concerned Junior Engineer.
27. If any kind of incapability & negligence are noticed in observing all the above-said terms & conditions, this Department posses the right to deduct the cost from the bills of the contractor on pro-rate basis as determined by the Engineer –In-Charge. In that case, the above-said contract may be terminated without issuing any notice and Stringent & punishable action may be taken against the contractor. 28. Valid workman permits, electrical license, Identity proof etc. are to be furnished for each electrician/workman, helper engaged by the agency alongwith the name & contract mobile no. of the persons and all these information with supporting documents are to be submitted in written to the concerned Junior Engineer(Electrical), Assistant Engineer(Electrical) & Executive Engineer(Electrical) 29. The agency should be responsible for any damage in the installation due to mishandling / mal-operation done by his staff and shall be liable for the compensation for the same which would be recovered from the bill as per direction of E.I.C. and the accused staff should be replaced immediately. 30. The agency must maintain a Log Book for recording therein the nature of work done, materials replaced etc. as per direction of the Engineer –in charge. The Log Book must be signed by the concerned Junior Engineer on each day. The log book should be sent to the Executive Engineer concerned through proper channel at the time of submission of bills.
31. Valid workman permits to be furnished for the workman engaged by the agency along with the name & contact phone no. of the persons. 32. Required tools and takles (Such as Thermal Imager, insulation(1 KV & 5 KV) and Earther Megger, differnt size cable crimping machine, misc. tools like screw driver, Allen key, wrench, piller set etc. should be supplied by the concern agency to the staff & worker for smothly maintenance work . 33.The contract may be terminated with one month’s notice from either side. 34.Total Safty & Security of the Staffs' concerned liable to the agency. 35. The rates should be quoted both in words and figures on monthly basis. No. quotation with price variation clause will be accepted. Rates offered should be stable for the entire period of maintenance 36. Bills should be submitted at the end of every three months with the certification of concerned Engineers on satisfactory completion. 37. The Agency should must have PF & ESI registration and produce Documentary evidence in support of latest 3 months payment of ESI (ESIC challan) & PF (ECR challan) challan of the respective staffs and labours during the preparation of bill. Bonus should be paid annually to each employee as per approved Govt. rate, & agency have to obey the labour department rules strictly.
M/S. S. D. CHATTERJEE AND CO.
B M ELECTRIC
technical_771335.pdf
PDF • 0.21 MB
techsummary_771335.pdf
PDF • 0.25 MB
finance_771335.pdf
PDF • 0.21 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_771335.pdf
PDF • 0.49 MB
20220923124128977.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .