Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹3.6 L
Closing Date
29 Jun 2026, 12:00 pm
SM(Engg-Civil)
Office of SM(Engg-Civil), Airports Authority of India, Dibrugarh Airport
Construction of new boundary wall at DVOR site rising of boundary wall as per BCAS standard and renovation of 2 Nos Watch Towers at Dibrugarh Airport. SH Construction of new boundary wall at DVOR site and Hanger Site and renovation of 2 Nos. Watch T
2026_AAI_280147_1
AAI/DIB/E-C/e-NIT/Boundary wall/26-27
Open Tender
Civil Works
270 days
Dibrugarh Airport
As per Tender Document
13 documents required · 13 mandatory
₹1,180
₹3.6 L
8 Jun 2026
8 Jun 2026
30 Jun 2026
8 Jun 2026
29 Jun 2026
8 Jun 2026
8 Jun 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil. | 1,517 | Cum | 100 | ₹1,51,700 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for lift. | 505 | Cum | 10 | ₹5,050 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 49 | Cum | 10 | ₹490 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete. | 337 | sqm | 10 | ₹3,370 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :
Suspended floors, roofs, landings, balconies and access platform | 35 | sqm | 10 | ₹350 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 324 | sqm | 10 | ₹3,240 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :
Columns, Pillars, Piers, Abutments, Posts and Struts | 282 | sqm | 10 | ₹2,820 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 13,174 | Kg | 10 | ₹1,31,740 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. :
Thermo-Mechanically Treated bars of grade Fe-500D or more | 5,241 | Kg | 10 | ₹52,410 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum | 152 | Cum | 10 | ₹1,520 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
TD.pdf
Tender Documents • 23.92 MB
BOQ_327019.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid