Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1Accepted-AOC NEAR GAURAV ICE FACTORY LOHARU ROAD CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹1 | 1 | Accepted-AOC Accept |
| 2 | 2₹2+₹1 (100.0%)Rejected-AOC 1804 SECTOR 2 HUDA 124001 | ROHTAK | HARYANA | 124001 | ₹2+₹1 (100.0%) | 2 | Rejected-AOC Reject |
| 3 | 3₹3+₹2 (200.0%)Rejected-AOC 1 VILLAGE JYOTISAR DISTT KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | ₹3+₹2 (200.0%) | 3 | Rejected-AOC Reject |
| 4 | 4₹4+₹3 (300.0%)Rejected-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹4+₹3 (300.0%) | 4 | Rejected-AOC Reject |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
30 Dec 2021, 5:00 pmClosed
Sudhir Ransiwal
PHED Gurugram
Augmentation of existing water supply scheme Iqbalpur Group of 5 No. villages and 4 No. Dhanies , Tehsil and District Gurugram ,Construction of 1 No. SS Tank, 1 No. R.C.C. High Level Tank, 1 Nos. R.C.C. Filter Bed, 1 No. R.C.C. Clear Water Tank, Pump
2021_HRY_199408_1
l/81010/2021 dated 09/12/2021
Open Tender
Civil Works
Works
365 days
Iqbalpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹7.4 L
Yes
7 Mar 2022
10 Dec 2021
31 Dec 2021
10 Dec 2021
30 Dec 2021
10 Dec 2021
Amount
Supply & Erection of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No. II complete in all respect with priming arrangement with complete base frame. B) Raw water pump set 4500 LPM 12.50 mtrs head with squirrel cage induction motor 1440 RPM, 3 phase 50 Hz of suitable rating.(22.50 BHP)
Providing & fixing aluminium ladder 1’ wide With 1’ center to center aluminum rod of 20 mm i/d complete in all respect. (15’ Long)
Operation and Maintenance for the complete scope of work mention in the DNIT (Disinfection material supplied by the PHED) as per schedule-IV for a period of 5 year after 12 months during Defect Libility Period 3 Months Trial run (will be charged to the A/mtc.estimate. Operation and Maintenance During the defect liability period (Operation only)
i) Operation & maintenance during 1st year after defect liability period.
ii) Operation & maintenance 2nd year
iii) Operation & maintenance 3rd year
iv) Operation & maintenance 4th year
v) Operation & maintenance 5th year
Bidder Name
Amount
Narender Singh Contractor(GSTN-06AXBPS0272N1Z8)
suresh kumar(GSTN-06AIPPK4333B1ZJ)
VIKASH BADESRA CONT(GSTN-NA)
Rajesh Kumar(GSTN-NA)
Narender Singh Contractor
Rajesh Kumar
suresh kumar
suresh kumar
Narender Singh Contractor
VIKASH BADESRA CONT
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .