| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 CrRejected-Finance BHAGATPUR SHIVPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | ₹1.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 CrRejected-Finance | ₹1.4 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 CrRejected-Finance | ₹1.4 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.5 CrRejected-Finance | ₹1.5 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S NAND ENTERPRISES L3 | AMAR NATH PANDEY L5 | M/s PRATIK ENTERPRISES L4 | M/S SHYAM ASSOCIATE L1 | M/s Shrinet Traders L6 | M/S SINGH TRADERS L2 | M/S JEET CONSTRUCTION L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in cutting of slope pitching etc. including its disposal and lead upto 30m & lift upto 1.5m complete in all respect | 878.82 | cum | 20 ₹17,576.40 | 41 ₹36,031.62 | 35.36 ₹31,075.08 | 30 ₹26,364.60 | 46.89 ₹41,207.87 | 52 ₹45,698.64 | 38.83 ₹34,124.58 |
| 2.00 | Earthwork in filling for recoupement of slope etc. including manual compaction, dressing etc. to profiles with required lead & lift complete in all respect | 2,533.21 | cum | 110 ₹2.8 L | 195 ₹4.9 L | 152.32 ₹3.9 L | 99 ₹2.5 L | 198.98 ₹5.0 L | 250 ₹6.3 L | 167.3 ₹4.2 L |
| 3.00 | Supply & laying of nylon crate of size 1 m x 1 m x 1 m filled with local available earth (preferable sandy soil) in E. C. bag including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 3,021 | Nos | 660 ₹19.9 L | 715 ₹21.6 L | 695.05 ₹21.0 L | 470 ₹14.2 L | 668 ₹20.2 L | 400 ₹12.1 L | 763.7 ₹23.1 L |
| 4.00 | Supply and laying of gabion of size 1.80 m x 1.80 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.125 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 1,589 | Nos | 3,300 ₹52.4 L | 3,943 ₹62.7 L | 3,472.62 ₹55.2 L | 3,150 ₹50.1 L | 3,495 ₹55.5 L | 3,000 ₹47.7 L | 3,814.25 ₹60.6 L |
| 5.00 | Supply and laying of gabion of size 1.80 m x 1.20 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.091 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 755 | Nos | 2,300 ₹17.4 L | 709 ₹5.4 L | 2,426.16 ₹18.3 L | 2,290 ₹17.3 L | 2,498 ₹18.9 L | 2,500 ₹18.9 L | 2,664.84 ₹20.1 L |
| 6.00 | Supply and laying Geo Textile bags of size 1 m x 0.75 m filled with local available earth (preferable sandy soil) in slope pitching including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 3,106 | sqm | 598 ₹18.6 L | 698 ₹21.7 L | 620.5 ₹19.3 L | 592 ₹18.4 L | 709.8 ₹22.0 L | 650 ₹20.2 L | 681.56 ₹21.2 L |
| 7.00 | Supply & fixing R. C. C. porcupine in proper position including cost of all material, labour, T & P etc. complete in all respect | 348 | Set | 7,000 ₹24.4 L | 8,800 ₹30.6 L | 7,494.52 ₹26.1 L | 7,000 ₹24.4 L | 7,348 ₹25.6 L | 7,000 ₹24.4 L | 8,231.83 ₹28.6 L |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
13 Mar 2026, 2:30 pmClosed
Superintending Engineer
Superintending Engineer, Gandak Flood Circle, Basti
Anti Erosion Work of Kunhra-Ghoghi Bund Between Km. 20.040 to 20.290 in Village Masjidiya on Left Bank of Burhi Rapti River in Distt.-Siddharthnagar.
2026_UPIDC_1122380_26
04/SE/2025-26
Open Tender
Civil Works
90 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,474
₹4.2 L
Yes
Superintending Engineer, Gandak Flood Circle, Bast
21 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Earthwork in cutting of slope pitching etc. including its disposal and lead upto 30m & lift upto 1.5m complete in all respect
Earthwork in filling for recoupement of slope etc. including manual compaction, dressing etc. to profiles with required lead & lift complete in all respect
Supply & laying of nylon crate of size 1 m x 1 m x 1 m filled with local available earth (preferable sandy soil) in E. C. bag including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect
Supply and laying of gabion of size 1.80 m x 1.80 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.125 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect
Supply and laying of gabion of size 1.80 m x 1.20 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.091 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect
Supply and laying Geo Textile bags of size 1 m x 0.75 m filled with local available earth (preferable sandy soil) in slope pitching including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect
Supply & fixing R. C. C. porcupine in proper position including cost of all material, labour, T & P etc. complete in all respect
stage.html
html • 0.06 MB
technical_2090067.pdf
techsummary_2090067.pdf
finance_2090067.pdf
BOQ Comparative Chart
xlsx
finsummary_2090067.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
BOQ_2090067.xls
BOQ • 0.25 MB
26.pdf
Tender Documents • 2.02 MB
Download all tender documents and submit your bid