Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹2.9 L (2.29%)Rejected-Finance BHAGATPUR SHIVPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | ₹1.3 Cr+₹2.9 L (2.29%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 Cr+₹8.6 L (6.75%)Rejected-Finance | ₹1.4 Cr+₹8.6 L (6.75%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 Cr+₹17.0 L (13.3%)Rejected-Finance | ₹1.4 Cr+₹17.0 L (13.3%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.5 Cr+₹20.2 L (15.9%)Rejected-Finance | ₹1.5 Cr+₹20.2 L (15.9%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S NAND ENTERPRISES L3 | AMAR NATH PANDEY L5 | M/s PRATIK ENTERPRISES L4 | M/S SHYAM ASSOCIATE L1 | M/s Shrinet Traders L6 | M/S SINGH TRADERS L2 | M/S JEET CONSTRUCTION L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in cutting of slope pitching etc. including its disposal and lead upto 30m & lift upto 1.5m complete in all respect | 878.82 | cum | 20 ₹17,576.4 Lowest | 41 ₹36,031.62 | 35.36 ₹31,075.08 | 30 ₹26,364.6 | 46.89 ₹41,207.87 | 52 ₹45,698.64 | 38.83 ₹34,124.58 |
| 2.00 | Earthwork in filling for recoupement of slope etc. including manual compaction, dressing etc. to profiles with required lead & lift complete in all respect | 2,533.21 | cum | 110 ₹2,78,653.1 | 195 ₹4,93,975.95 | 152.32 ₹3,85,858.55 | 99 ₹2,50,787.79 Lowest | 198.98 ₹5,04,058.13 | 250 ₹6,33,302.5 | 167.3 ₹4,23,806.03 |
| 3.00 | Supply & laying of nylon crate of size 1 m x 1 m x 1 m filled with local available earth (preferable sandy soil) in E. C. bag including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 3,021 | Nos | 660 ₹19,93,860 | 715 ₹21,60,015 | 695.05 ₹20,99,746.05 | 470 ₹14,19,870 | 668 ₹20,18,028 | 400 ₹12,08,400 Lowest | 763.7 ₹23,07,137.7 |
| 4.00 | Supply and laying of gabion of size 1.80 m x 1.80 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.125 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 1,589 | Nos | 3,300 ₹52,43,700 | 3,943 ₹62,65,427 | 3,472.62 ₹55,17,993.18 | 3,150 ₹50,05,350 | 3,495 ₹55,53,555 | 3,000 ₹47,67,000 Lowest | 3,814.25 ₹60,60,843.25 |
| 5.00 | Supply and laying of gabion of size 1.80 m x 1.20 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.091 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 755 | Nos | 2,300 ₹17,36,500 | 709 ₹5,35,295 Lowest | 2,426.16 ₹18,31,750.8 | 2,290 ₹17,28,950 | 2,498 ₹18,85,990 | 2,500 ₹18,87,500 | 2,664.84 ₹20,11,954.2 |
| 6.00 | Supply and laying Geo Textile bags of size 1 m x 0.75 m filled with local available earth (preferable sandy soil) in slope pitching including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 3,106 | sqm | 598 ₹18,57,388 | 698 ₹21,67,988 | 620.5 ₹19,27,273 | 592 ₹18,38,752 Lowest | 709.8 ₹22,04,638.8 | 650 ₹20,18,900 | 681.56 ₹21,16,925.36 |
| 7.00 | Supply & fixing R. C. C. porcupine in proper position including cost of all material, labour, T & P etc. complete in all respect | 348 | Set | 7,000 ₹24,36,000 Lowest | 8,800 ₹30,62,400 | 7,494.52 ₹26,08,092.96 | 7,000 ₹24,36,000 Lowest | 7,348 ₹25,57,104 | 7,000 ₹24,36,000 Lowest | 8,231.83 ₹28,64,676.84 |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
13 Mar 2026, 2:30 pmClosed
Superintending Engineer
Superintending Engineer, Gandak Flood Circle, Basti
Anti Erosion Work of Kunhra-Ghoghi Bund Between Km. 20.040 to 20.290 in Village Masjidiya on Left Bank of Burhi Rapti River in Distt.-Siddharthnagar.
2026_UPIDC_1122380_26
04/SE/2025-26
Open Tender
Civil Works
Item Wise
90 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,474
₹4.2 L
Yes
Superintending Engineer, Gandak Flood Circle, Bast
21 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting of slope pitching etc. including its disposal and lead upto 30m & lift upto 1.5m complete in all respect | 878.82 | cum | - | - |
| 2 | Earthwork in filling for recoupement of slope etc. including manual compaction, dressing etc. to profiles with required lead & lift complete in all respect | 2,533.21 | cum | - | - |
| 3 | Supply & laying of nylon crate of size 1 m x 1 m x 1 m filled with local available earth (preferable sandy soil) in E. C. bag including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 3,021 | Nos | - | - |
| 4 | Supply and laying of gabion of size 1.80 m x 1.80 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.125 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 1,589 | Nos | - | - |
| 5 | Supply and laying of gabion of size 1.80 m x 1.20 m x 0.50 m filled with local available earth (preferably sandy soil) in Geo bags of size 1 m x 0.75 m (after filling volume 0.091 cum) including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 755 | Nos | - | - |
| 6 | Supply and laying Geo Textile bags of size 1 m x 0.75 m filled with local available earth (preferable sandy soil) in slope pitching including tying/stitching with sutali and placing in proper position including cost of all material, labour, T & P etc. complete in all respect | 3,106 | sqm | - | - |
| 7 | Supply & fixing R. C. C. porcupine in proper position including cost of all material, labour, T & P etc. complete in all respect | 348 | Set | - | - |
stage.html
html • 0.06 MB
technical_2090067.pdf
techsummary_2090067.pdf
finance_2090067.pdf
BOQ Comparative Chart
xlsx
finsummary_2090067.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
BOQ_2090067.xls
BOQ • 0.25 MB
26.pdf
Tender Documents • 2.02 MB
Sudhipatra2.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .