Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | -0.02% | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹2,537.27 (0.01%)Admitted-Finance | -0.01% | ₹2.5 Cr+₹2,537.27 (0.01%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
Refer Docs
EMD Value
₹6.0 L
Closing Date
1 Jul 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Loktipora road at Arwani.
2026_PWDJK_312159_1
NIT 30 of RnB/Ang/2026-27/2553-62 Dt 11/06/26
Open Tender
Civil Works
Percentage
90 days
Bijbehara
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,500
Executiver Engineer rnB Division Anantnag
₹6.0 L
Office of The SE RnB Circle Anantnag
8 Jul 2026
11 Jun 2026
2 Jul 2026
11 Jun 2026
1 Jul 2026
13 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. (in all kinds of soils). | 3,195 | Cum | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking
excavated or stacked material : | 2,556 | Cum | - | - |
| 3 | P/L Stone solling of Specified size duely hand packed incl. all carriages and loading/unloading. | 114.75 | Cum | - | - |
| 4 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level in 1:4:8 mix.incld all carriages | 67.5 | Cum | - | - |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded crushed stone aggregate, 20mm nominal size) excluding cost of centering and shuttering but including carriage of all materials from approved sources up to site of work complete. | 297 | Cum | - | - |
| 6 | Supply and filling of quarry stones in wire crates iincluding knitting of crates and cost of crates ( of 4mm swg wire) | 3,474.9 | Cum | - | - |
| 7 | P/L in position cemnet concrete in Retaning walls, return walls, walls of any thickness of spacefied grade excldd . The cost of centering and shuttering (1:2:4) corase sand 20mm Niominal size crushed stone agg) (Coping) incl all carriages | 180 | Sqm | - | - |
| 8 | Centering and shuttering incld strutting , proping etc and removal of form work for base | 139.5 | Sqm | - | - |
| 9 | P/L Backfilling Nalla boulders handpacked of specified grade and size including ramming spreading and compacting and all carriages & loading/unloading complete incld all carriages | 4,856.63 | Cum | - | - |
| 10 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). Depth exceeding 3 m but not exceeding 4.50 m | 135 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tendernotice_2.pdf
PDF • 1.06 MB
BOQ_1010493.xls
BOQ • 0.28 MB
CORRIGENDUMDATENIT30.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .