| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹25.9 L+₹53.10 (<0.01%)Accepted-AOC | ₹25.9 L+₹53.10 (<0.01%) Quoted ₹2.0 Cr | L2 | Accepted-AOC Awarded |
| 2 | L2₹36.0 L+₹53.10 (<0.01%)Accepted-AOC VILL GARBHANGA BIKASH NAGAR P O BASISTHA P S BASISTHA DIST KAMRUP M ASSAM | KAMRUP | ASSAM | 781030 | ₹36.0 L+₹53.10 (<0.01%) Quoted ₹2.0 Cr | L2 | Accepted-AOC Awarded |
| 3 | L2₹37.1 L+₹53.10 (<0.01%)Accepted-AOC 3RD FLOOR KRISHNA RICE MILL BUILDING PAGLASTHAN BONGAIGAON 783380 | BONGAIGAON | ASSAM | 783380 | ₹37.1 L+₹53.10 (<0.01%) Quoted ₹2.0 Cr | L2 | Accepted-AOC Awarded |
| 4 | L2₹97.0 L+₹53.10 (<0.01%)Accepted-AOC VILL MOLIGAON P O BOITAMARI P S ABHAYAPURI DIST BONGAIGAON ASSAM | DHUBRI | ASSAM | 783371 | ₹97.0 L+₹53.10 (<0.01%) Quoted ₹2.0 Cr | L2 | Accepted-AOC Awarded |
| 5 | L1₹2.0 CrRejected-Finance C O SRI HANUMAN PRASAD BAJAJ WARD NO 02 U T ROAD P O DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹2.0 Cr | L1 | Rejected-Finance Not Admitted |
| Sl No | Description | Qty | Unit | PADMAVATI CONSTRUCTION L2 | ASHOK KUMAR BAJAJ L1 | ANUPAM RAY L2 | SHRI DHANESH MEDHI L2 | LIZA KALITA L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Dhordhorijhora & Khagarpur Mini Diversion weir Construction of Diversion Channel | ||||||||
| 1.01 | Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain waternecessary complete as directed with a lead upto 30 M and lift upto 1.50 M. | 270 | cum | 281.91 ₹76,115.7 | 281.91 ₹76,115.7 | 271.91 ₹73,415.7 Lowest | 281.91 ₹76,115.7 | 281.91 ₹76,115.7 |
| 2.00Construction of Head weir | ||||||||
| 2.01 | Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). | 353.54 | cum | 335.95 ₹1,18,771.76 Lowest | 335.95 ₹1,18,771.76 Lowest | 335.95 ₹1,18,771.76 Lowest | 335.95 ₹1,18,771.76 Lowest | 335.95 ₹1,18,771.76 Lowest |
| 2.02 | CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately). | 0.28 | cum | 8,814.1 ₹2,467.95 Lowest | 8,814.1 ₹2,467.95 Lowest | 8,814.1 ₹2,467.95 Lowest | 8,814.1 ₹2,467.95 Lowest | 8,814.1 ₹2,467.95 Lowest |
| 2.03 | CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately). | 128.3 | cum | 8,841.72 ₹11,34,392.68 Lowest | 8,841.72 ₹11,34,392.68 Lowest | 8,841.72 ₹11,34,392.68 Lowest | 8,841.72 ₹11,34,392.68 Lowest | 8,841.72 ₹11,34,392.68 Lowest |
| 2.04 | Dewatering of CC works considering 1 no. 10 HP and 1no. of 5 HP pump including POL, carriage and operator's pay etc. Say RL 47.20 M | 38.08 | cum | 362.93 ₹13,820.37 | 362.93 ₹13,820.37 | 362.93 ₹13,820.37 | 362.93 ₹13,820.37 | 362.93 ₹13,820.18 Lowest |
| 2.05 | CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessarycomplete as directed. (Shuttering, scaffolding cost willbe paid separately). | 5.52 | cum | 8,254.2 ₹45,563.18 Lowest | 8,254.2 ₹45,563.18 Lowest | 8,254.2 ₹45,563.18 Lowest | 8,254.2 ₹45,563.18 Lowest | 8,254.2 ₹45,563.18 Lowest |
| 2.06 | Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) | 133.82 | sqm | 1,569.78 ₹2,10,067.96 Lowest | 1,569.78 ₹2,10,067.96 Lowest | 1,569.78 ₹2,10,067.96 Lowest | 1,569.78 ₹2,10,067.96 Lowest | 1,569.78 ₹2,10,067.96 Lowest |
| 2.07 | Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. | 11.15 | qtl | 12,295.78 ₹1,37,097.95 Lowest | 12,295.78 ₹1,37,097.95 Lowest | 12,295.78 ₹1,37,097.95 Lowest | 12,295.78 ₹1,37,097.95 Lowest | 12,295.78 ₹1,37,097.95 Lowest |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
7 Apr 2025, 2:00 pmClosed
Chief Engineer Minor Irrigation Assam
O-O the Chief Engineer Irrigation Assam Chandmari Ghy-03
Construction of Mini Diversion weir on natural springs at Nine locations at Abhayapuri LAC under SOPD (Innovation _Consultation _ Pilot Project) for the year 2024-25 under Abhayapuri South Bilasipara East Division (Irrigation), Abhayapuri
2025_ID_43498_1
11_SOPD_Innovation_2024-25 Date_13_03_2025
Open Tender
Civil Works
Item Rate
180 days
Abyapuri
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,500
₹4.4 L
Yes
O-O the CEMI Assam Chandmari Ghy-003
15 Oct 2025
14 Mar 2025
7 Apr 2025
14 Mar 2025
7 Apr 2025
14 Mar 2025
24 Mar 2025
Amount
Dhordhorijhora & Khagarpur Mini Diversion weir Construction of Diversion Channel
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain waternecessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Head weir
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
Dewatering of CC works considering 1 no. 10 HP and 1no. of 5 HP pump including POL, carriage and operator's pay etc. Say RL 47.20 M
CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessarycomplete as directed. (Shuttering, scaffolding cost willbe paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at afixed distance from the edge, and MS channel of size100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mmfor shutter frame, Horizontal girders and verticalstiffeners , fitting fixing of C.I. Guide Roller of size 75mm x 67 mm x 100 mm x 20 mm having 25 mm dia holewith pin Guide roller M.S. bracket of size 90 mm x 90mm x 250 mm made of 12 mm thick and 90 mm wideM.S. Flat with guide roller pin fitted on the shutterframe, having required slots and holes and supply,fitting and fixing of ‘J’ type rubber seal, of size 125 mm ,‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thickhaving 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed A] C/Regulator
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Supply, Fabrication, Installation and Commissioning corrgated polycarbonate sheet at site including labour charge
Construction of Guide Bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Installation of Sign Board
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
Dimajhora & Majejhora Mini Diversion weir Construction of Diversion Channel
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain waternecessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Head weir
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
Dewatering of CC works considering 1 no. 10 HP and 1no. of 5 HP pump including POL, carriage and operator's pay etc. Say RL 47.20 M
CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessarycomplete as directed. (Shuttering, scaffolding cost willbe paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at afixed distance from the edge, and MS channel of size100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mmfor shutter frame, Horizontal girders and verticalstiffeners , fitting fixing of C.I. Guide Roller of size 75mm x 67 mm x 100 mm x 20 mm having 25 mm dia holewith pin Guide roller M.S. bracket of size 90 mm x 90mm x 250 mm made of 12 mm thick and 90 mm wideM.S. Flat with guide roller pin fitted on the shutterframe, having required slots and holes and supply,fitting and fixing of ‘J’ type rubber seal, of size 125 mm ,‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thickhaving 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed A] C/Regulator
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Supply, Fabrication, Installation and Commissioning corrgated polycarbonate sheet at site including labour charge
Construction of Guide Bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Installation of Sign Board
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
Naldubi Dong & 2nd Stream at Barkhata pt-II Mini Diversion weir Construction of Diversion Channel
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain waternecessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Head weir
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
Dewatering of CC works considering 1 no. 10 HP and 1no. of 5 HP pump including POL, carriage and operator's pay etc. Say RL 47.20 M
CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessarycomplete as directed. (Shuttering, scaffolding cost willbe paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at afixed distance from the edge, and MS channel of size100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mmfor shutter frame, Horizontal girders and verticalstiffeners , fitting fixing of C.I. Guide Roller of size 75mm x 67 mm x 100 mm x 20 mm having 25 mm dia holewith pin Guide roller M.S. bracket of size 90 mm x 90mm x 250 mm made of 12 mm thick and 90 mm wideM.S. Flat with guide roller pin fitted on the shutterframe, having required slots and holes and supply,fitting and fixing of ‘J’ type rubber seal, of size 125 mm ,‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thickhaving 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed A] C/Regulator
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Supply, Fabrication, Installation and Commissioning corrgated polycarbonate sheet at site including labour charge
Construction of Guide Bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Installation of Sign Board
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
Gupunijhora Mini Diversion weir Construction of Diversion Channel
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain waternecessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Head weir
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
Dewatering of CC works considering 1 no. 10 HP and 1no. of 5 HP pump including POL, carriage and operator's pay etc. Say RL 47.20 M
CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessarycomplete as directed. (Shuttering, scaffolding cost willbe paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at afixed distance from the edge, and MS channel of size100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mmfor shutter frame, Horizontal girders and verticalstiffeners , fitting fixing of C.I. Guide Roller of size 75mm x 67 mm x 100 mm x 20 mm having 25 mm dia holewith pin Guide roller M.S. bracket of size 90 mm x 90mm x 250 mm made of 12 mm thick and 90 mm wideM.S. Flat with guide roller pin fitted on the shutterframe, having required slots and holes and supply,fitting and fixing of ‘J’ type rubber seal, of size 125 mm ,‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thickhaving 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed A] C/Regulator
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Supply, Fabrication, Installation and Commissioning corrgated polycarbonate sheet at site including labour charge
Construction of Guide Bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Construction of Super Passage
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Installation of Sign Board
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
Borjhora (Ghilaguri) Diversion weir Construction of Diversion Channel
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain waternecessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Head weir
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
Dewatering of CC works considering 1 no. 10 HP and 1no. of 5 HP pump including POL, carriage and operator's pay etc. Say RL 47.20 M
CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessarycomplete as directed. (Shuttering, scaffolding cost willbe paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at afixed distance from the edge, and MS channel of size100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mmfor shutter frame, Horizontal girders and verticalstiffeners , fitting fixing of C.I. Guide Roller of size 75mm x 67 mm x 100 mm x 20 mm having 25 mm dia holewith pin Guide roller M.S. bracket of size 90 mm x 90mm x 250 mm made of 12 mm thick and 90 mm wideM.S. Flat with guide roller pin fitted on the shutterframe, having required slots and holes and supply,fitting and fixing of ‘J’ type rubber seal, of size 125 mm ,‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thickhaving 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed A] C/Regulator
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Supply, Fabrication, Installation and Commissioning corrgated polycarbonate sheet at site including labour charge
Construction of Guide Bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Installation of Sign Board
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
Barkhata Diversion weir Mini Diversion weir Construction of Diversion Channel
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain waternecessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Head weir
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
CC Work in proportion 1:4:8 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
CC Work in proportion 1:3:6 in foundation /abutment/ pier/wing walls etc. with hard broken stone aggregate of size 13 to 38 mm including curing with necessary shuttering , Scafolding etc. where necessary, complete as directed. (shuttering where necessary shall be measured and paid separately).
Dewatering of CC works considering 1 no. 10 HP and 1no. of 5 HP pump including POL, carriage and operator's pay etc. Say RL 47.20 M
CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessarycomplete as directed. (Shuttering, scaffolding cost willbe paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at afixed distance from the edge, and MS channel of size100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mmfor shutter frame, Horizontal girders and verticalstiffeners , fitting fixing of C.I. Guide Roller of size 75mm x 67 mm x 100 mm x 20 mm having 25 mm dia holewith pin Guide roller M.S. bracket of size 90 mm x 90mm x 250 mm made of 12 mm thick and 90 mm wideM.S. Flat with guide roller pin fitted on the shutterframe, having required slots and holes and supply,fitting and fixing of ‘J’ type rubber seal, of size 125 mm ,‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thickhaving 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed A] C/Regulator
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Supply, Fabrication, Installation and Commissioning corrgated polycarbonate sheet at site including labour charge
Construction of Guide Bund
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Collection of blasted boulder of size 25 cm to 30 cm including stacking at quarry site, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete asdirected.
Installation of Sign Board
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
ANUPAM RAY (BID ID -265238)
SHRI DHANESH MEDHI (BID ID -263871)
PADMAVATI CONSTRUCTION (BID ID -264910)
LIZA KALITA (BID ID -265254)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .