| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | ₹1.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.8 L+₹1,800 (1.00%)Rejected-Finance | ₹1.8 L+₹1,800 (1.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.8 L+₹3,600 (2.00%)Rejected-Finance | ₹1.8 L+₹3,600 (2.00%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
28 May 2026, 6:00 pmClosed
OFFICE OF THE PRADHAN PUBONG RAMPURIA GRAM PANCHYA
OFFICE OF THE PRADHAN PUBONG RAMPURIA GRAM PANCHYAT
CONSTRUCTION BOX DRAIN AT LOWER MUNSI DHURA SANSAD NO V
2025_GTA_847112_2
01/PRGP/15THFC/2025-26 20/05/2026
Open Tender
CIVIL WORKS
Percentage
60 days
PUBONG RAMPURIA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹3,600
19 Jun 2026
20 May 2026
2 Jun 2026
21 May 2026
28 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches Or drains,in all sorts of soil (including mixed soil but excluding laterite or sandy soil ) including removing spreading or stacking the spoils within a lead of 75m as directed.The iteincluding necessary trimming the sides of trenches,leveling dressing and ramming the bottom bailing out water etc as required complete | 1 | cum | 119.27 | ₹119.27 |
| 2 | Earth work in filling in foundation trenches or Plinth with good earth in layers not exceeding 150mm including watering and ramming etc .Layer by layer complete. | 1 | cum | 77.54 | ₹77.46 |
| 3 | Labour for laying 150mm to 200mm boulder soling including rough hand packing and ramming down small pieces in the interstices including rolling and preparing the bed to proper level and filling up all the joints with sandy clay or earth without rolling. | 1 | Sqm | 50 | ₹49.95 |
| 4 | Cost of Boulder | 1 | cum | 1,272 | ₹1,271.87 |
| 5 | Cement concrete with 40 mm down graded Singles excluding shuttering in ground floor ( 1 : 3 : 6 ). | 1 | cum | 5,971.2 | ₹5,965.23 |
| 6 | Plum concrete work with cement concrete with 30mm down graded stone metal 40% and stone 150mm and above placed in position as directed excluding shuttering if any | - | cum | 3,964.8 | - |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4m. using approved stouts props and thick hard wood planks of approved thickness with required bracing for concrete slabs,beams,lintels etc. including fitting fixing and striking out after completion of work. | 1 | Sqm | 334 | ₹334 |
| 8 | Plaster(to wall,floor,ceiling etc.)with sand and cement mortar,including rounding off comers or chamfering corners as directed and raking out joints including throating,nosing and drip course,scaffo,ding/staging where necessary(ground floor). | - | Sqm | 211.2 | - |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, window, sills, floor, drain etc. | - | Sqm | 40.8 | - |
| 10 | Display Board | - | l/s | 2,315 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1891216.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .