GEMC-511687730132679
Awarded to TESLA FREQUENCY
₹3.5 Cr
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Botanfundi, Tq Bhamragad as per given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kudkeli, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 4 UNIT | 285,968.7 | 1,143,874.8 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Vateli s, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Vengnur, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Dudepalli, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kedmarras, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Mokela, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Halwer, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 3 UNIT | 285,968.7 | 857,906.1 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Mirgurwancha, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Nargunda M, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 3 UNIT | 285,968.7 | 857,906.1 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Padhur s, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Pidmili, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kodape, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kosfundi m, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kucher m, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kumarguda, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Pokur, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Tekala, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Tirkameta, Tq Bhamragad as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Abanpalli M, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Fundi M, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Markal M, Tq Etapalli as pert given specification | - | HSN not specified by seller | 4 UNIT | 285,968.7 | 1,143,874.8 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Markal Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Paima s, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Deopadi, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gardewada, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gardewada Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Hachbodi, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Mardkuhi s, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Murwada, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Murwada Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gosetola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Rekabhatal, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Rekameta, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Rekameta Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Tadguda, Tq Etapalli as pert given specification | - | HSN not specified by seller | 4 UNIT | 285,968.7 | 1,143,874.8 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Besewada, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gatta Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gilanguda, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Dudhepalli, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gorgatta m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gundjur, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Jajawandi, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Jajawandi Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kesaritola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kunjemarka m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Mohandi, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Wateli, Tq Etapalli as pert given specification | - | HSN not specified by seller | 3 UNIT | 285,968.7 | 857,906.1 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Naralhur, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Tadpalli Alias Rengawahi, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Tadpalli Alias Naranur Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Tambada m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Hichami Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Tambada s, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Dumme s, Tq Etapalli as pert given specification | - | HSN not specified by seller | 4 UNIT | 285,968.7 | 1,143,874.8 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Jaweli m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Bater m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Dewada M, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at GATTEPALLI TOLA, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Gattepalli s, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kachler Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kachler Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kornar m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Kothi m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Mohgaon Tola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Mavelim, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Petha s, Tq Etapalli as pert given specification | - | HSN not specified by seller | 4 UNIT | 285,968.7 | 1,143,874.8 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Pethatola, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at WATTEGATTA TOLA, Tq Etapalli as pert given specification | - | HSN not specified by seller | 1 UNIT | 285,968.7 | 285,968.7 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Wattegattam, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Adange m, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Modaske, Tq Etapalli as pert given specification | - | HSN not specified by seller | 2 UNIT | 285,968.7 | 571,937.4 |
| Turnkey contract for Automatic smart monitoring and controlling system with water meter at Zarewada, Tq Etapalli as pert given specification | - | HSN not specified by seller | 6 UNIT | 285,968.7 | 1,715,812.2 |
| ollvin 01 0.5 Black Plain copper Type D | ollvin / OLLVIN 0.5 SQ.MM TWO CORE COPPER CABLE TT | HSN not specified by seller | 24 meter | 1,200 | 28,800 |
| ollvin 4 Core, PVC Insulated Copper Cable with Conductor Area 4 sq. mm. | ollvin / 4 SQ MM X 4 CORE COPPER FLEXIBLE CABLE | HSN not specified by seller | 24 meter | 2,500 | 60,000 |
| ollvin 3 Core XLPE Cable, Conductor Area - 1.5 sq mm | ollvin / 1.5 SQ.MM X 3 CORE CO UNARMOURED CABLE | HSN not specified by seller | 24 meter | 1,688.77 | 40,530.48 |
| ollvin 2 Core XLPE Cable, Conductor Area - 10 sq mm | ollvin / 10 SQ.MM X 2 CORE AL ARMOURED CABLE | HSN not specified by seller | 24 meter | 1,688.77 | 40,530.48 |
| ollvin 2 Core 1.5 sq. mm PVC Copper Circular Sheathed Cable with Rigid Conductor | ollvin / 1.5 X 2 CORE COPPER FLEXIBLE CABLE | HSN not specified by seller | 25 meter | 2,500 | 62,500 |