| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 CrAccepted-AOC | ₹13.7 Cr Quoted ₹14.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹14.4 CrRejected-Finance | ₹14.4 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY ASSOCIATES L1 | Aryan Constrution and Associates L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1Km i/c removal & disposal of top organic soil not exceeding 150 mm in thickness.i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 16,000 | Sqm. | 9.6 ₹1.5 L | 10 ₹1.6 L |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MoRT&H specification clause No. 301i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 12,127 | Cum. | 60.3 ₹7.3 L | 61 ₹7.4 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per MoRT&H specification clause No. 305i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 12,156 | Cum. | 169.4 ₹20.6 L | 170 ₹20.7 L |
| 4.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per MoRT&H specification clause No.305i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 12,127 | Cum. | 61.2 ₹7.4 L | 65 ₹7.9 L |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 4,935 | Cum. | 3,071.1 ₹1.5 Cr | 3,100 ₹1.5 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H specification clause No. 406Bi/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 3,884 | Cum. | 3,499.1 ₹1.4 Cr | 3,500 ₹1.4 Cr |
| 7.00 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per MoRT&H specification clause No. 502 I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen emulsion, Contractor Profit but excluding GST. | 25,898 | sqm. | 38.3 ₹9.9 L | 39 ₹10.1 L |
| 8.00 | Providing and applying tack coat with bitumen using bitumenn VG-10 pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRT&H specification clause No. 503 I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 1,55,537 | sqm | 13.8 ₹21.5 L | 14 ₹21.8 L |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects. I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 2,420 | cum | 8,770.9 ₹2.1 Cr | 8,800 ₹2.1 Cr |
| 10.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects. I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 3,934 | cum | 9,332.2 ₹3.7 Cr | 9,400 ₹3.7 Cr |
Tender Value
₹14.6 Cr
EMD Value
₹29.2 L
Closing Date
15 Dec 2025, 2:00 pmClosed
se pwd saharanpur
se pwd saharanpur
Widening and strengthening of Widening and strengthening of Saharanpur Nakud Gangoh Thanabhawan Road in Dictrict shamli in Dictrict shamli
2025_CEMRT_1097483_1
6892/25MS-S/2025 Date 04-10-2025
Open Tender
Civil Works
365 days
shamli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹29.2 L
7 Feb 2026
9 Dec 2025
15 Dec 2025
9 Dec 2025
15 Dec 2025
9 Dec 2025
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1Km i/c removal & disposal of top organic soil not exceeding 150 mm in thickness.i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MoRT&H specification clause No. 301i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per MoRT&H specification clause No. 305i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per MoRT&H specification clause No.305i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H specification clause No. 406Bi/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per MoRT&H specification clause No. 502 I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen emulsion, Contractor Profit but excluding GST.
Providing and applying tack coat with bitumen using bitumenn VG-10 pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRT&H specification clause No. 503 I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects. I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505 complete in all respects. I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with mechanical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 I/c all cess, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MoRT&H specification clause No. 304, 9.01B(i)i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Plain cement concrete (PCC 1:3:6 in Foundation) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MoRT&H specification clause No. 12.04, 2100i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications clause No. 12.05, 1300i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Plain/Reinforced cement concreten (PCC Grade M20 using batching plant transit mixer & Concrete pump) in sub-structure complete as per drawing and Technical Specifications as per MoRT&H specification clause No 1500, 1700 & 2200, 13.05 B (p)i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications clause No 13.03, 1300 & 2200i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Plain/Reinforced cement concreten (RCC Grade M20 using batching plant transit mixer & Concrete pump) in sub-structure complete as per drawing and Technical Specifications as per MoRT&H specification clause No 1500, 1700 & 2200, 13.05 E(p)i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications No. 12.42, 1600i/c all labour, material, cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.88 MB
BOQ_2020859.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid