| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹5.2 LRejected-Finance | ₹5.2 L | L3 | Rejected-Finance 3rd Lowest |
| 4 | L4₹5.3 LRejected-Finance | ₹5.3 L | L4 | Rejected-Finance 4th Lowest |
Tender Value
₹5.5 L
EMD Value
₹11,008
Closing Date
1 Jun 2026, 10:00 amClosed
EE-I/LDCD
O/O EE-I/LDCD Fuleswar Uluberia Howrah 711316
Protection work of right embankment of Lower Rampur Khal near Satpota RCC bridge a length of 45.0 M in G.P.-Jhamtia in Block-Amta-II, P.S.-Joypur, District - Howrah.
2026_IWD_1024379_19
WBIW/EE-I/LDCD/e-NIT-01/26-27
Open Tender
CIVIL WORKS
Percentage
45 days
Amta
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,008
13 Aug 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | - | Sqm | 5.96 | - |
| 2 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(i) 15.00 cm av. Diameter | 546 | Mtr. | 258.62 | ₹1,41,206.52 |
| 3 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
(i) 15.00 cm av. Diameter
For driving done by pile engine set (without taging)under specific instruction of Engineer-in-charge, the rates will be enhanced by Rs.4.00 per meter. | 473.2 | Mtr. | 129.91 | ₹61,473.41 |
| 4 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
((a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus. | 90 | Mtr. | 123.95 | ₹11,155.5 |
| 5 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 90 | Each | 139.44 | ₹12,549.6 |
| 6 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3.
Size of Nylon crate is 1metre x 1metre x1metre. | 90 | Each | 899.87 | ₹80,988.3 |
| 7 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incidental charges etc. all complete(capacity 50 Kg). | 4,081 | Each | 7.15 | ₹29,179.15 |
| 8 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
Note: Volume of earth /sand filled bags should not be less than 0.028 cum./bag | - | Each bag | 8.34 | - |
| 9 | Dumping in position earth/ sand filled gunny/ poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts | - | Each bag | 3.58 | - |
| 10 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, leveling as per direction of the Engineer-in-charge within a lead of.
NB :- Measurement to be taken on the basis of stack measurement/pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.(For compensation for earth for land owned and arranged by conductor add Rs. 25.00 per m3 extra over rate of E/W for land owned/arranged by the department. Royalty charge on earth @ 29.00 per m3 & Cesses charges @Rs. 5.30 per m3(i.e. Rs. 15.00 per 100 cft) as per govt notification which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses.)
a) Beyond 4.00 km and upto 5.00 km | - | Cum | 371 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Form2911.pdf
Tender Documents • 0.56 MB
19.pdf
Additional Documents • 0.19 MB
BOQ_2517781.xls
BOQ • 0.27 MB
Sl19.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].