Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
22 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex Engineer
Office of the Ex Engineer IFC Div Handwara
Renovation/upgradation of Gang sar Qaziabad Haril
2022_IFC_192720_2
NIET/14/IFCD/HND/2022-23
Open Tender
Civil Works
Item Rate
15 days
Handwara
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Ex Engineer
₹10,000
25 Oct 2022
17 Oct 2022
25 Oct 2022
17 Oct 2022
22 Oct 2022
17 Oct 2022
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Hand-packing stones in wire-crates; excluding cost of crates and stones
Supply of Nallah Stones/boulders
Supply of wire crates 16x16 size 4mm thick wire incl. all carriages cmplete job
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Carriage of materials from different sources to road site of work by Mechnical transport
Stones Avg. 15 Kms
Extra carriage of materials from road Site to actual site of work by Head load Avg 150 Mtrs
Stones
Carriage of excavated material from cutting site to dumping site by avg. 01 Km by mechnical transport
ZUBAIR AHMAD KHAN
stage.html
html • 0.02 MB
finance_504798.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .