| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.7 LAccepted-AOC M S SIVA CONSTRUCTIONS 5A 79F H 3 N2 RAJA THEATRE SOUTH SIDE ELAMBALUR ROAD PERAMBALUR 621 212 | PERAMBALUR | TAMIL NADU | 621212 | ₹89.7 L Quoted ₹93.3 L | L1 | Accepted-AOC Agreement Accepted |
| 2 | L2₹94.6 LRejected-Finance | ₹94.6 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹96.0 LRejected-Finance | ₹96.0 L | L3 | Rejected-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | SHIVA CONSTRUCTIONS L1 | VRM Contractor L3 | AJANTHA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 295 | M3 | 267 ₹78,765 | 275 ₹81,125 | 271 ₹79,945 |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 39 | M3 | 114 ₹4,446 | 118 ₹4,602 | 116 ₹4,524 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 24.8 | M3 | 1,848 ₹45,830.40 | 1,901 ₹47,144.80 | 1,875 ₹46,500 |
| 4.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 119.3 | M3 | 502 ₹59,888.60 | 517 ₹61,678.10 | 510 ₹60,843 |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 23.3 | M3 | 5,665 ₹1.3 L | 5,828 ₹1.4 L | 5,747 ₹1.3 L |
| 6.00 | Brick work In Cement Mortar 1:3 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. For Foundation and Basement | 9 | M3 | 8,166 ₹73,494 | 8,402 ₹75,618 | 8,284 ₹74,556 |
| 7.00Brick work In Cement Mortar 1:5 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 7.01 | For Foundation and Basement | 46.35 | M3 | 7,866 ₹3.6 L | 8,092 ₹3.8 L | 7,979 ₹3.7 L |
| 8.00Brick work In Cement Mortar 1:6 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 8.01 | Superstructure in Ground floor | 70.41 | M3 | 7,887 ₹5.6 L | 8,115 ₹5.7 L | 8,001 ₹5.6 L |
Tender Value
₹89.7 L
EMD Value
₹54,900
Closing Date
7 Oct 2025, 3:00 pmClosed
The Superintending Engineer, P.W.D., Trichy
Office of the Superintending Engineer, P.W.D., Buildings (C and M), Circle, Trichy-1
Construction of 3 Classroom, Boys Toilet -1 No , Girls Toilet -1 No, in GHS at Vadakkumadevi in Perambalur District.
2025_PWD_610277_1
Tn.No.27/2025-2026/12.09.2025
Open Tender
Civil Works - Buildings
150 days
Vadakkumadevi
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹54,900
16 Mar 2026
30 Sept 2025
8 Oct 2025
30 Sept 2025
7 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid