Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC BAHULA ANDAL BARDHAMAN 713322 WEST BENGAL INDIA | BAHULA | BARDHAMAN | WEST BENGAL | 713322 | ₹9.8 L | 1 | Accepted-AOC Eligible L-1 bidder. |
| 2 | 2₹9.9 LRejected-Finance VILL P O CHINCHURIA DIST BURDWAN WB PIN 713378 | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | ₹9.9 L | 2 | Rejected-Finance Quoted more Eligible L-1 bidder. |
| 3 | 3₹10.1 LRejected-Finance HARIPUR COLLIERY P O HARIPUR DIST PASCHIM BARDHAMAN PIN 713378 W B | HARIPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹10.1 L | 3 | Rejected-Finance Quoted more Eligible L-1 bidder. |
| Sl No | Description | Qty | Unit | KOYEL ENTERPRISE L1 | JAY MAA DAL DALI KALI L2 | SANJAY YADAV L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01Material Cost | ||||||
| 1.02 | Supply of DA gas & Oxygen | 16 | set | 2,364.31 ₹37,828.96 | 2,376 ₹38,016 | 2,421 ₹38,736 |
| 1.03 | Supply of cutting/gauging electrodes | 16 | kg | 234.53 ₹3,752.48 | 236 ₹3,776 | 241 ₹3,856 |
| 1.04 | Supply of Metal chips | 24 | kg | 56.26 ₹1,350.24 | 57 ₹1,368 | 58 ₹1,392 |
| 1.05Labour Cost: | ||||||
| 1.06 | (i) Alignment of pump-motor sets at E&M workshop on base frame using suitable tools & tackles with required metal chips. (ii) Alignment of pump-motor sets at E&M workshop on pontoons in mine using suitable tools & tackles with required metal chips. (iii) Day to day checking of alignment of pump-motor sets | 180 | Days | 3,574.94 ₹6.4 L | 3,592 ₹6.5 L | 3,660 ₹6.6 L |
| 1.07 | Add OH & contractor profit @ 10% | 1 | LS | 68,642.09 ₹68,642.09 | 68,972 ₹68,972 | 70,278.4 ₹70,278.40 |
| 1.08 | P. F. amount for labour cost | 1 | no. | 79,535.27 ₹79,535.27 | 79,914.82 ₹79,914.82 | 81,427.68 ₹81,427.68 |
| 1.09 | Total impact of GST for the purpose of CTC | 1 | Nos | 1,50,227.68 ₹1.5 L | 1,50,949.23 ₹1.5 L | 1,53,808.21 ₹1.5 L |
Tender Value
₹9.4 L
EMD Value
₹11,800
Closing Date
24 Jan 2026, 5:00 pmClosed
AE EnM
S.B.AREA
Day to day alignment of pump-motor sets at E and amp M workshop and pump-motor set running within the mine under S. B. Project for a period of 180 days.
2026_ECL_351016_1
GM/SBA/EnM/Tender/25-26/90
Open Tender
Electrical and Maintenance Works
180 days
S.B.Project
Please refer tender document.
4 documents required · 4 mandatory
₹11,800
9 Apr 2026
13 Jan 2026
27 Jan 2026
14 Jan 2026
24 Jan 2026
14 Jan 2026
14 Jan 2026 - 17 Jan 2026
Item Description/ Heading
Supply of DA gas & Oxygen
Supply of cutting/gauging electrodes
Supply of Metal chips
Labour Cost:
(i) Alignment of pump-motor sets at E&M workshop on base frame using suitable tools & tackles with required metal chips. (ii) Alignment of pump-motor sets at E&M workshop on pontoons in mine using suitable tools & tackles with required metal chips. (iii) Day to day checking of alignment of pump-motor sets
Add OH & contractor profit @ 10%
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_363881.pdf
techsummary_363881.pdf
finance_363881.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.68 MB
Tendernotice_3.pdf
PDF • 1.25 MB
BOQ_363881.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid