| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance 53 19 BRINDABON MULLICK LANE KADAMTALA HOWRAH WEST BENGAL 711101 UDYAM WB 08 0004810 19AEBPC0017L2ZW R M MII STATUS AS VERIFIED | HOWRAH | WEST BENGAL | 711101 | ₹6.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹6.7 LRejected-Finance 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | ₹6.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | V.JANARTHANAN L2 | PHOENIX & CO L1 |
|---|---|---|---|---|---|
| 1.00 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply Pipes. The Rate inclusive of all charges such as Earth work and remove the same 2Km away from the site etc, complete as per standard specifications. | 96 | m3 | 135 ₹12,960 | 130 ₹12,480 |
| 1.10 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 72 | m3 | 2,250 ₹1.6 L | 2,237 ₹1.6 L |
| 1.20 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 480 | m2 | 80 ₹38,400 | 79 ₹37,920 |
| 1.30 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 480 | m2 | 18 ₹8,640 | 17 ₹8,160 |
| 1.40 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 24 | m3 | 9,325 ₹2.2 L | 9,312 ₹2.2 L |
| 1.50 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 14.5 | m3 | 9,325 ₹1.4 L | 9,307 ₹1.3 L |
| 1.60 | Painting center line, edge line road marking 100 width with Thermoplastic Paint (hot application) in such way that painting length will be 3.00m with a gap of 3.00m with a gap of 3.00 m curved portion and in straight portion painting length will be 3.00m | 95 | m2 | 900 ₹85,500 | 890 ₹84,550 |
Tender Value
₹8.0 L
EMD Value
₹7,950
Closing Date
20 Nov 2025, 3:00 pmClosed
THE COMMISSIONER
Salem city municipal corporation, Fort main road, Salem.
Restoration of BT Road at Pechiamman Koil East I Cross and I Cross to III Cross Street in Division No. 43 of Ammapet Ward Office
2025_MAWS_623579_1
E8-Est No-69-R-2025-2026
Open Tender
Civil Works
30 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,950
26 Feb 2026
14 Nov 2025
20 Nov 2025
14 Nov 2025
20 Nov 2025
14 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_745610.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid