| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹6.5 L+₹1,496 (0.23%)Rejected-AOC | L2 | Rejected-AOC Quoted high rate as compared to L1 | |
| 3 | L3₹6.7 L+₹24,689 (3.81%)Rejected-AOC | L3 | Rejected-AOC Quoted high rate as compared to L1 | |
| 4 | L4₹6.7 L+₹24,942 (3.85%)Rejected-AOC | L4 | Rejected-AOC Quoted high rate as compared to L1 | |
| 5 | L5₹7.1 L+₹57,640 (8.89%)Rejected-AOC | L5 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹7.6 L
Closing Date
29 Aug 2022, 2:00 pmClosed
Executive Engineer
rural engineering wing leh
Construction of culvert over the main irrigation canal at IFD Stakna
2022_RDD_7358_13
NIT NO 23 - UTL - REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer
Exempted
27 Jan 2023
20 Aug 2022
31 Aug 2022
20 Aug 2022
29 Aug 2022
20 Aug 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Providing and fixing of dry stone solling in horizontal layer including cost of Stone complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) Crushed
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars.
Centnng and shuttering including strutting~ propping etc and removal of form work for Columns, piers, abutments, pillars, posts and struts.
Centnng and shuttering including strutting~ propping etc and removal of form work for Suspended floors, roofs, landings, balco nies and access platform.
Centnng and shuttering including strutting~ propping etc and removal of form work for Edges of slabs and breaks in floors and walls. above 20cms wide
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Providing and laying damp-proof course 50rnm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size crushed.
Carriage of Stone avy. Lead of 15 Km by MT
Carriage of cement and Steel avg. Lead of 20 Km by MT
Carriage of sand and C. aggregate avg, lead of 15 KM by MT
M/STSERING TASHI
M/S SONAM NORBOO
JOHAR ALI
M/S ALI AHMAD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .