Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.4 L+₹93,015 (16.9%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.8 L+₹1.3 L (23.9%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹7.6 L+₹2.1 L (37.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹7.7 L+₹2.2 L (40.5%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | jktender L2 | Romesh Chander L4 | Narinder singh contractor L3 | Anju Devi L5 | M/S PAWAN KUMAR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Slip clearance in soils mixed with moorum / kankar /shingle / boulders, disposal of earth, including all leads and lift. | 324 | Cum | 150 ₹48,600 | 125 ₹40,500 | 100 ₹32,400 | 250 ₹81,000 | 80 ₹25,920 Lowest |
| 2.00 | Earthwork in excavation by mechanical means (Hydraulic excavator) in trenches for foundation, drains, pipes etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on Plan, including dressing of sides and ramming of bottoms, including getting out the excavated earth and disposal of surplus excavated earth as directed, including all leads and lift.
a) All Kind of soil. | 142 | Cum | 75 ₹10,650 | 140 ₹19,880 | 66 ₹9,372 Lowest | 200 ₹28,400 | 80 ₹11,360 |
| 3.00 | Earthwork in bulk excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth as directed by Engineer-in-charge, including all leads and lift.
a) All Kind of soil. | 131 | Cum | 75 ₹9,825 | 90 ₹11,790 | 69 ₹9,039 Lowest | 150 ₹19,650 | 80 ₹10,480 |
| 4.00 | Providing and laying cement concrete of specified grade indluding curing but excluding the cost of centring and shuttering. All work upto plinth level with: a) 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate 40mm nominal size) (including all leads and lifts carriages of material by MT/HL) | 8 | Cum | 2,050 ₹16,400 | 2,000 ₹16,000 | 1,750 ₹14,000 | 3,500 ₹28,000 | 1,500 ₹12,000 Lowest |
| 5.00 | Providing and laying cement concrete of specified grade indluding curing but excluding the cost of centring and shuttering. All work upto plinth level with:
a) 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size).
(including all leads and lifts carriages of material by MT/HL) | 21 | Cum | 3,800 ₹79,800 | 4,500 ₹94,500 | 4,350 ₹91,350 | 4,500 ₹94,500 | 3,000 ₹63,000 Lowest |
| 6.00 | Providing and laying damp proof course 40mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) and curing complete (including all leads and lifts carriages of material by MT/HL) | 25 | Sqm | 250 ₹6,250 | 200 ₹5,000 | 150 ₹3,750 Lowest | 250 ₹6,250 | 250 ₹6,250 |
| 7.00 | Dry rubble masonry with hard stone in foundation and plinth with bond stones (including all leads and lifts carriages of material by MT/HL) | 25 | Cum | 2,050 ₹51,250 | 2,200 ₹55,000 | 2,000 ₹50,000 | 2,000 ₹50,000 | 1,500 ₹37,500 Lowest |
| 8.00 | Centring and shuttering including strutting, propping etc.and removal of form work for : a) Foundation, footings, bases of columns etc. for mass concrete. | 86 | Sqm | 75 ₹6,450 | 150 ₹12,900 | 70 ₹6,020 | 200 ₹17,200 | 50 ₹4,300 Lowest |
| 9.00 | Hand packing stones in wire crates, including cost of stones and crates (including all leads and lifts carriages of material by MT/HL) | 346 | Cum | 1,200 ₹4,15,200 | 1,450 ₹5,01,700 | 1,350 ₹4,67,100 | 1,300 ₹4,49,800 | 1,100 ₹3,80,600 Lowest |
| 10.00Carriage of the following materials by Mechanical Transport from source to site of work incl. loading, unloading and stacking complete :- a) Sand from Billawar crusher for an average lead of 47.00 Km. by M.T. b) Stone aggregate 40mm nominal size & above from Billawar crusher for an average lead of 47.00 Km. by M.T. c) Stone aggregate (Crusher bajree) below 20mm nominal size from Billawar crusher for an average lead of 47.00 Km. by M.T. d) Stones / boulders for an av. lead of 10.00 km. by M.T. from Lohai nallah. e) Disposal of earth for an av. lead of 1.00 km. | ||||||||
Tender Value
Refer Docs
Closing Date
2 Feb 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er. Rajesh Sumbria
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2021_PWDJK_114230_2
e-NIT No.60 of 2020-21 dated 21-01-2021
Open Tender
Civil Works
Item Rate
90 days
Basohli
Please refer in SBD
5 documents required · 5 mandatory
₹600
Yes
e-NIT No. name of contr and work. on Try Challan
Exempted
Executive Engineer PWD R and B Division Basohli
10 Feb 2021
21 Jan 2021
3 Feb 2021
22 Jan 2021
2 Feb 2021
24 Jan 2021
23 Jan 2021
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Slip clearance in soils mixed with moorum / kankar /shingle / boulders, disposal of earth, including all leads and lift. | 324 | Cum | - | - |
| 2 | Earthwork in excavation by mechanical means (Hydraulic excavator) in trenches for foundation, drains, pipes etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on Plan, including dressing of sides and ramming of bottoms, including getting out the excavated earth and disposal of surplus excavated earth as directed, including all leads and lift.
a) All Kind of soil. | 142 | Cum | - | - |
| 3 | Earthwork in bulk excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth as directed by Engineer-in-charge, including all leads and lift.
a) All Kind of soil. | 131 | Cum | - | - |
| 4 | Providing and laying cement concrete of specified grade indluding curing but excluding the cost of centring and shuttering. All work upto plinth level with: a) 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate 40mm nominal size) (including all leads and lifts carriages of material by MT/HL) | 8 | Cum | - | - |
| 5 | Providing and laying cement concrete of specified grade indluding curing but excluding the cost of centring and shuttering. All work upto plinth level with:
a) 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size).
(including all leads and lifts carriages of material by MT/HL) | 21 | Cum | - | - |
| 6 | Providing and laying damp proof course 40mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) and curing complete (including all leads and lifts carriages of material by MT/HL) | 25 | Sqm | - | - |
| 7 | Dry rubble masonry with hard stone in foundation and plinth with bond stones (including all leads and lifts carriages of material by MT/HL) | 25 | Cum | - | - |
| 8 | Centring and shuttering including strutting, propping etc.and removal of form work for : a) Foundation, footings, bases of columns etc. for mass concrete. | 86 | Sqm | - | - |
| 9 | Hand packing stones in wire crates, including cost of stones and crates (including all leads and lifts carriages of material by MT/HL) | 346 | Cum | - | - |
| 10 | Carriage of the following materials by Mechanical Transport from source to site of work incl. loading, unloading and stacking complete :-
a) Sand from Billawar crusher for an average lead of 47.00 Km. by M.T.
b) Stone aggregate 40mm nominal size & above from Billawar crusher for an average lead of 47.00 Km. by M.T.
c) Stone aggregate (Crusher bajree) below 20mm nominal size from Billawar crusher for an average lead of 47.00 Km. by M.T.
d) Stones / boulders for an av. lead of 10.00 km. by M.T. from Lohai nallah.
e) Disposal of earth for an av. lead of 1.00 km. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
SBD2.pdf
Tender Document • 0.39 MB
Tendernotice_1.pdf
Tender Document • 0.38 MB
Corrigendum60on27-1-21.pdf
Tender Document • 0.19 MB
BOQ_218493.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .