Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹109.1 CrAccepted-AOC SECTOR 15 PART 1 GURGAON GURGAON HARYANA | GURGAON | GURGAON | HARYANA | 122001 | L1 | Accepted-AOC Award Of Contract, Bidder is L1 | |
| 2 | L2₹111.5 Cr+₹2.9 Cr (2.65%)Rejected-AOC 289 SUNDAR NAGAR BEHIND CSEB OFFICE NEAR MOTHER S PRIDE SCHOOL AAROHI TANKER STREET RAIPUR CHATTISGARH 492013 | RAIPUR | RAIPUR | CHHATTISGARH | 492013 | L2 | Rejected-AOC Bidder is L2 | |
| 3 | L3₹113.4 Cr+₹4.8 Cr (4.38%)Rejected-AOC | L3 | Rejected-AOC Bidder is L3 | |
| 4 | Rejected-Technical 4 DI 4 D2 COURT CHAMBERS V T MARG 35 NEW MARINE LINES MUMBAI 400020 | MUMBAI | MUMBAI | MAHARASHTRA | 400020 | - | Rejected-Technical Technically Not Qualified | |
| 5 | Rejected-Technical PLOT NO 16 OPP METRO PILLAR NO 190 PASCHIM VIHAR EXTENSION ROHTAK ROAD DELHI 110 063 | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹125.0 Cr
EMD Value
₹62.5 L
Closing Date
7 Feb 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE NIT Nagpur
Superintending Engineer (HQ), Station road, NIT Head Office, Sadar, Nagpur
Construction of 300 beds Multispecialty Hospital at Kh. No. 157 at Mouza - Wathoda, Nagpur.
2024_UDDMH_978738_1
e-Tender Notice No. 19/2023-24
Open Tender
Civil Works - Buildings
Item Rate
730 days
Nagpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹50,000
₹62.5 L
Nagpur
15 Mar 2024
4 Jan 2024
8 Feb 2024
4 Jan 2024
7 Feb 2024
4 Jan 2024
15 Jan 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means
Basement Floor 1 .& 2. | 0.6 | Cum | - | - |
| 2 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means
Basement Floor 1 .& 2. | 0.2 | Cum | - | - |
| 3 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By MechanicalMeans
Basement Floor 1 .& 2. | 0.2 | Cum | - | - |
| 4 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 3.0m To 4.5 m.) By MechanicalMeans
Basement Floor 1 .& 2. | 0.2 | Cum | - | - |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 4.5m To 6.0 m.) By MechanicalMeans
Basement Floor 1 .& 2. | 0.2 | Cum | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 6.0m To 7.5 m.) By MechanicalMeans
Basement Floor 1 .& 2. | 0.4 | Cum | - | - |
| 7 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 1.5m To 3.0 m) By Mechanical Means
Basement Floor 1 .& 2. | 0.4 | Cum | - | - |
| 8 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 3.0 m To 4.5 m) By Mechanical Means
Basement Floor 1 .& 2. | 0.2 | Cum | - | - |
| 9 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 4.5 m To 6.0 m) By Mechanical Means
Basement Floor 1 .& 2. | 0.2 | Cum | - | - |
| 10 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 6.0 m To 7.5 m) By Mechanical Means
Basement Floor 1 .& 2. | 0.4 | Cum | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
recovered-award.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1709649.xls
BOQ • 1.53 MB
136628857.pdf
Tender Documents • 0.32 MB
136628862.html
Tender Documents • 0.03 MB
HOSPITAL_WATHODA_ALL_DRAWINGS.pdf
Tender Documents • 34.33 MB
ScheduleC.pdf
Tender Documents • 0.83 MB
TenderDocument.pdf
Tender Documents • 1.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .