| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.3 LAccepted-AOC PASUMALAITHANGAL GINGEE VILUPPURAM | L1 | Accepted-AOC ACCEPT | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | R SELVARAJ L1 |
|---|---|---|---|---|
| 1.00 | Cleaning the Channel Using Poclain on either Sides of the bridge including dismantling the old Structure and Providing Temorary Odai | 32 | Hrs | 2,500 ₹80,000 Lowest |
| 2.00Foundation | ||||
| 2.01Earthwork excavation in all classes of soil except soft disintegrated rock not requiring blasting and hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS & RETURN WALL. as per section 300 of MORT&H Specifications (Fifth Revision -2013) | ||||
| 2.02 | Depth 0m to 2.0m | 207 | M3 | 270 ₹55,890 Lowest |
| 2.03Earthwork excavation in Soft Disintegrated Rock not requiring blasting except medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND RETURN WALL. as per section 300 of MORT&H Specifications (Fifth Revision -2013) | ||||
| 2.04 | Depth 2.0m to 3.0m | 207 | M3 | 270 ₹55,890 Lowest |
| 3.00Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for LEVELLING COURSE.Under footing as per 2100 of MORT&H Specficaton (Fifth Revision-2013) | ||||
| 3.01 | Depth 2.0m to 3.0m | 16 | M3 | 7,340 ₹1,17,440 Lowest |
| 4.00Supplying and erection shuttering,including necessary supports for plain in all floors using mild steel sheets of size 90x 60 cms and BG 10 stiffed with surfacewelded mild steel angles for boarding supported by casuarina props at suitable intervals etc. completecomplying with standard specifications as directed. | ||||
| 4.01 | For Vertical Wall for Bridge Footing | 172 | M2 | 1,190 ₹2,04,680 Lowest |
Tender Value
₹44 L
EMD Value
₹44,000
Closing Date
21 May 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Bridge across the Channel (Rajavaikkal) Connecting Meenakshi Nagar, Amarjothi Nagar and Viswanathapuram in Ward no.14, North zone
2025_MAWS_558620_13
e23/2025- Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹44,000
9 Aug 2025
16 May 2025
22 May 2025
16 May 2025
21 May 2025
16 May 2025
Amount
Cleaning the Channel Using Poclain on either Sides of the bridge including dismantling the old Structure and Providing Temorary Odai
Foundation
Earthwork excavation in all classes of soil except soft disintegrated rock not requiring blasting and hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS & RETURN WALL. as per section 300 of MORT&H Specifications (Fifth Revision -2013)
Depth 0m to 2.0m
Earthwork excavation in Soft Disintegrated Rock not requiring blasting except medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND RETURN WALL. as per section 300 of MORT&H Specifications (Fifth Revision -2013)
Depth 2.0m to 3.0m
Plain Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for LEVELLING COURSE.Under footing as per 2100 of MORT&H Specficaton (Fifth Revision-2013)
Depth 2.0m to 3.0m
Supplying and erection shuttering,including necessary supports for plain in all floors using mild steel sheets of size 90x 60 cms and BG 10 stiffed with surfacewelded mild steel angles for boarding supported by casuarina props at suitable intervals etc. completecomplying with standard specifications as directed.
For Vertical Wall for Bridge Footing
For Slope Centring Abutment & Pier
For Beam Slab
Vibrated Cement Concrete of Grade M-20, Nomional Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF ABUTMENT AND RETURN WALLS. as per Section 1500,1700 & 2100 of MORT&H Specficaton (Fifth Revision-2013)
Sub Structure
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, RETURN WALL AND PIERS ABOVE SILL LEVEL. as per Section 1500,1700 & 2200 of MORT&H Specficaton (Fifth Revision-2013)
Vibrated Reinforced Cement Concrete of grade M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.as per Section 1500,1700 & 2200 of MORT&H Specficaton (Fifth Revision-2013)
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.
Vibrated Reinforced Cement Concrete of grade M30 Design Mix using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB and Safety Kerb. as per Section 1500,1700 & 2300 of MORT&H Specficaton (Fifth Revision-2013)
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc.,, complete for RCC Hand Rail. as per Section 811,1700 & 2703.3 of MORT&H Specficaton (Fifth Revision-2013)
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013)
Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. FOR WEARING COAT as Mesh Reinforcement. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013)
Protection Work
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab. as per Section 2702.2 of MORT&H Specficaton (Fifth Revision-2013)
Supplying and fixing GI DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc., complete as per cl 2705 of MORT&H specification. (V Revision)
Providing FILTER MEDIA behind Abutment and Returns for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT&H-Rev.5 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite including labour charges and all other incidental charges, etc complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete(In Deck slab)
Filling behind Abutments and return wall with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014
Providing and fixing class1 PVC seepage pipes of 100 mm dia of required lengths for retaining walls including costs and conveyance of all materials to work site and labour charges for fixing, including backing aggregate for draining seepage water etc., (Weep hole)
Painting two coats with Ready mix plastic enamel paint and approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts over cement surface
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .