Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | L1 | Accepted-AOC L1 BID | |
| 2 | L2₹13.5 L+₹1.6 L (13.4%)Rejected-AOC | L2 | Rejected-AOC NOT L1 | |
| 3 | L3₹14.2 L+₹2.3 L (19.6%)Rejected-Finance | L3 | Rejected-Finance THE BID IS NOT L1 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
30 Oct 2020, 5:00 pmClosed
COMMISSIONER
DURGAPUR MUNICIPAL CORPORATION, CITY CENTRE DURGAPUR-16
Supply , Erection and Commissioning of 1 Number 5MT Capacity chain pulley block 6mtr lift chain with 18 Mtr long manual push pull Travelling Trolley (5MT) is required for lifting of Motor- pump set at Clear Water Pump House, Angadpur 15MGD Water Tre
2020_MAD_299515_1
WBDMC/COMM/WS/NIT-127/20-21
Open Tender
Miscellaneous Works
Percentage
120 days
DURGAPUR MUNICIPAL CORPORATION
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
21 Jan 2021
3 Oct 2020
2 Nov 2020
3 Oct 2020
30 Oct 2020
3 Oct 2020
Amount
Supply ,delivery of steel Structural Frame of monorail beam (Min ISMB 300mm) 18M length with 2 Nos. structural travelling trolley and monorail tool (600mm) and girder with all necessary arrangements for above High Lift Pump House including complete fitting, fabricating and welding of guard plate along with Painting the monorail beam (two coat red lead oxide primer and two coat yellow synthetic enamel finish paint) as per direction of EIC. A detailed sketch drawing may be prepared before the delivery of the materials.
Supply, delivery of 5 MT chain pulley block with 5 MT manual push-pull geared travelling trolley. TC/GC required at the time of delivery
Installation of the monorail beam by derrick or scaffolding or other arrangement and chain pulley block hoisting of both side for lifting the monorail beam from pump house floor to required height for lifting the motor & pump. The monorail beam fixing into the top plate and levelling the beam including welding and erection of the gear travelling trolley on the monorail beam and fixing of the chain pulley block of the gear travelling trolley after lifting the gear travelling trolley from the pump house floor to top beam as per direction of EIC.
Grouting of the top plate of cantilever beam(civil) and levelling the same and cutting of the existing wall at one end and cement concrete and cement plastering of the wall (if necessary) and other related civil work as per direction of EIC
Commissioning and testing the entire installation up to the entire satisfaction of E.I.C.
BIJOY CONSTRUCTION
PAUL BROTHERS AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .