SE
pallavpuram
REGARDING REPAIRING and CONSTRUCTION WORK OF OLD and NEW LINE UNDER FULL DEPOSIT WORK SCHEME/ SANSAD/ VIDHAYAK NIDHI AND BY GETTING APPLICATION THROUGH JHATPAT PORTAL IN THE AREA OF EDD-II, MEERUT UNDER EDC-2, PALLAVPURAM, MEERUT
2022_PVVNL_672575_3
124/EDC-2/MT/2021-22
Open Tender
Electrical Works
Lump-sum
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC-2
₹10,000
25 Feb 2022
25 Jan 2022
18 Feb 2022
25 Jan 2022
18 Feb 2022
25 Jan 2022
Amount
Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :–
A) PCC Pole 8.5 mrt long/ST pole 11 mtr long.
Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. (15 Qtl.)
Cartage of 10 KVA / 25 KVA/ 63 KVA/100 KVA Transformer from store centre to site of work including loading & unloading at both site
Cartage of following material from JE Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :– A) PCC Pole 8.5 mrt long/ST pole 11 mtr long.
Safe Cartage of CT/PT of diffrent ratio from store centre meerut to site of work including loading and unloading at both ends.
Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories .
Earting of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire.
Erection of PCC pole 8.5 mtr long/STP Pole 11 mrt long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work.
Fabrication and fixing of all 11 KV H.T/L.T. line accessories.
Erection of Double pole on PCC pole 8.5 mtr after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators and making connection properly.
Fabrication and fixing of Top Channel,Dropper channel Transformer base angle -Fuse set, TPMO Etc.
Mounting of 10 KVA / 25 KVA/ 63 KVA/100 KVA with proper jumping of HT side and fixing of cable on LT. side of T/F making connection properly.
Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories.
Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming.
Laying lifting stringing of proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
Laying lifting stringing of proper sagging of ABC Bunch conductor.
Laying lifting & sagging of LT line with A.C.S.R. Weaseal/Rabbit Conductor including proper binding & jumpring:- a) 3 phase 4 wire line.
b) 2 phase 3 wire line.
c) 1 phase 2 wire line
Guarding of line with G.I. wire having 2 no horizontal wire& 3 Mtr distance odf laces of ten SWG G.I wire after fabrication of guard cross arms of & fixing the same in supports.
Grouting of PCC/ST poles with Dust, Cement & Stone blast concreting.
Cutting & chopping tree branches near side of line for making the clearance between line and tree.
Fixing of LT distribution box along with providing clamp Nut & Bolts
Providing and fixing stay clamps .
Providing and fixing Holding clamps .
Providing and fixing F clamps .
Providing and fixing LT clamps .
Providing and fixing LT Insulator.
Providing and fixing Bolt and Nuts .
Suspension clamp with J hook
Dead & clamp with J hook
Installation of CT/PT & making connection properly
Fixing of 11 KV heat shrinkable cable jointing kits
M/S DHARAM DASS & BUDH PRAKASH & CO.
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .