| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance SANTOKHGARH DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | +4.99% | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹7.5 LAdmitted-Finance CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | +8.00% | ₹7.5 L | L2 | Admitted-Finance |
| 3 | L2₹7.5 LAdmitted-Finance BILASPUR | +8.00% | ₹7.5 L | L2 | Admitted-Finance |
Tender Value
₹7.0 L
EMD Value
₹6,963
Closing Date
8 Jan 2026, 11:00 amClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for providing 3Ph LT Line , HT Line alongwith augmentation of 11/0.4kv,250 kva Sub-Station to 11/0.4kv,400 kva Sub-Station and re-earthing of various transformer at various villages Bid No- UED/204/2025-26 under ESD HPSEBL Santokhgarh.
2026_HPSEB_124890_1
BID NO- UED/204/2025-26
Open Tender
Electrical Works
90 days
AREA OF ESD SANTOKHGARH
AS PER SBD ATTACHED
5 documents required · 5 mandatory
₹590
₹6,963
27 Jan 2026
2 Jan 2026
9 Jan 2026
2 Jan 2026
8 Jan 2026
2 Jan 2026
A) Erection Part
ERECTION PART 3Ph LT Line TS NO-116/2025-26 WBS NO-32100261-001-UNA-LT-766
Erection of LT line. Digging of pit, erection of PCC pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART 3Ph LT Line TS NO-117/2025-26 WBS NO-32100261-001-UNA-LT-767
Erection of LT line. Digging of pit, erection of PCC pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART 11kV HT Line TS. No-192/2025-26 wbs no- 32100261-001-una-HT-147
Erection of S.T Single Pole Str. 10 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect.
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART 11kV HT Line TS. No-118/2025-26 wbs no- 32100261-001-una-HT-139
Erection of PCC Single Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , and ramming & painting of poles complete in all respect.
Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART Aug. of 11/0.4kv,250 kva Sub-Station to 11/0.4kV,400 KVA Sub-Station TS. N0-85/2025-26 WBS NO- 32100261-001-UNA-DTR-291 at vill. Sanouli
Erection of 400 kVA Sub-Station :-Erection, Testing and Commissioning of 01 No. 400 kVA, 11/0.4 kV Distribution Transformer on proposed plinth by augmentation of the existing 11/0.4 kV, 250 kVA Sub-Station to 11/0.4 kV, 400 kVA Sub-Station on plinth, including unloading, shifting and proper placement of the transformer, provision and termination of HT and LT connections/LT Distribution Box, installation of all associated accessories, carrying out post-commissioning tests, and successful energisation, complete in all respects, under the jurisdiction of the concerned Electrical Sub-Division, i.e. ESD Santokhgarh.
Providing and Fixing wooven mesh fencing along with Gate & locking arrangement (for more detail check attached drawing and measurement detail)
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. wherever required, all complete In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge Made of G.I. wire of dia 4 mm
Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. complete 100x58x1.90 mm
Providing and fixing ISI markedoxidisedM.S. sliding door bolts with nuts and screws etc. complete : 250x16 mm
Construction of R.C.C foundation for 400 KVA Transformer (for more detail check attached drawing and measurement detail)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc. for mass concrete.
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
ERECTION PART 3Ph LT Line TS NO-208/2025-26 WBS NO-32100261-001-UNA-LT-801
Erection of LT line. Digging of pit, erection of PCC pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect.
Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect.,
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART replacement of damaged/brunted 11KV AB Cable (HT 95mm2) with new XLPE Cable 95 mm2 TS. N0-266/2025-26 WBS NO- 32100261-001-UNA-HT-
Laying of AB Cable,Installation of Suspension and Tension assembly etc.,Sagging of AB Cable ,Heat Shrinkable Cable ,Jointing/Termination/joint (1 No. Straight Through+2 No. Cable termination & 1 No T Jointing)
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
11 Nos. complete re-earthing for various distribution transformers i.e. existing 11/0.4 kV, 100 kVA 58 Pekhubela; 100 kVA 40 Abada Barana; 100 kVA 95 Jhorowal; 100 kVA 45 Sunehra ;250 kVA 124Poona (Ajouli); 250 kVA 112 Ajouli; 100 kVA 141 Majara (Ajouli); 100 kVA 168 Sanouli (Ajouli); 250 kVA 110 Fatepur (Nangran);250 kva 145 Nangran and 250 kva 06 Santokhgarh TS NO-226/2025-26 WBS NO-32100261-001-DTR-UNA-DTR-318
3 Nos. complete earthing sets for per transformer installation, each consisting of 40 mm dia × 3.0 m long G.I. pipe (medium class) electrode, buried vertically in ground and surrounded by alternate layers of charcoal/coke and common salt to achieve the desired earth resistance. Each electrode shall be connected to the equipment with G.I. wire of 8 SWG, securely fastened using suitable clamps, bolts, and nuts. The top of each electrode shall be provided with a G.I. reducer, watering funnel with mesh, and inspection pipe for regular watering and maintenance. Each earth pit shall be provided with a C.I. earth chamber with removable cover, and a test link / earth resistance test point shall be provided for measurement. The work includes all materials, labour, excavation, refilling, and restoration of the surface, complete in all respects as per IS:3043 / REC Construction Standards and as directed by the Engineer-in-Charge.
Pipe Earthing Set (MS Plate earthing) (GI pipe 40 mm, GI Socket ,MS Plate 300X300X6 mm) (3 Nos for Each)
6 SWG GI wire For Earthing (25 kg for Each)
Providing Charcoal and Salt for the earthing (1 Nos for Each)
Erection of Earthing of Sub-Station
SUPPLY PART
L.T.Line 3Ph LT Line3Ph LT Line TS NO-116/2025-26 WBS NO-32100261-001-UNA-LT-766
PCC Pole 8 mtr. Long. Provided by HPSEBL
Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr]
Half Clamp for Cross Arm
Nut and Bolts
Shackle Insulator with D-Iron
Earth Hook/Eye Hook Bolt
Earthing Set Complete (preferbly coil earthing)
L.T.Line 3Ph LT Line3Ph LT Line TS NO-117/2025-26 WBS NO-32100261-001-UNA-LT-767
PCC Pole 8 mtr. Long. Provided by HPSEBL
Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr]
Half Clamp for Cross Arm
Nut and Bolts
Shackle Insulator with D-Iron
Earth Hook/Eye Hook Bolt
Earthing Set Complete (preferbly coil earthing)
11kV HT Line TS. No-192/2025-26 wbs no- 32100261-001-una-HT-147
Prov. Steel Tublar 10 mtr long with cap. (Provided By HPSEBL)
Prov. RCC Muff
Prov.AAAC 7/4.26 mm Conductor (Provided By HPSEBL)
Prov.G.I.Wire No. 8 SWG in mtr. (Provided By HPSEBL)
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx2
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp (Provided By HPSEBL)
Prov.MS Full Clamp
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov.11kv Pin Insulator with pin complete in all respect
Prov.11kv Stay Set
Prov. Stay Wire (7/3.15 mm) (10 kg. per Stay Set) Provided by HPSEBL
Prov.11kv Earthing set complete in all respect.
Prov.Red Oxide (1.5 Ltr. Per Pole)
Prov.Alluminum Paint
Prov.11kv Danger Plate (250x200x1.6 mm)
11kV HT Line TS. No-118/2025-26 wbs no- 32100261-001-una-HT-139
Prov. PCC Pole 9 mtr long with cap. (Provided By HPSEBL)
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx2
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov.11kv Pin Insulator with pin complete in all respect
Prov.11kv Earthing set complete in all respect.
Prov.11kv Danger Plate (250x200x1.6 mm)
Aug. of 11/0.4kv,250 kva Sub-Station to 11/0.4kV,400 KVA Sub-Station TS. N0-85/2025-26 WBS NO- 32100261-001-UNA-DTR-291 at vill. Sanouli
Prov. 11/0.4kv,400 kva Sub-Station Provided by HPSEBL
Prov. Panel (Distribution Box LT 400 kVA DTR Fitted with Bakelite sheet ,500 Amp Copper thimble MCCB 630 amp 3P 50kA -1 No., Make L&T,Schneider Havalles,ABB or equivalant, MCCB 250 Amp 36 kA 3P of L&T,Havalle, Schneider ,ABB or equivalent make -3 Nos Provided by HPSEBL
Prov. LT Cable 3-1/2 core 400 mm2 incoming
Prov. LT Cable 3-1/2 core 300 mm2 outgoing Provided by HPSEBL
L.T.Line 3Ph LT Line3Ph LT Line TS NO-208/2025-26 WBS NO-32100261-001-UNA-LT-801
PCC Pole 8 mtr. Long. Provided by HPSEBL
AAAC 7/3.15 mm2 Conductor Provided by HPSEBL
GI Wire Provided by HPSEBL
Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr]
Full Clamp
Half Clamp for Cross Arm
Nut and Bolts
Shackle Insulator with D-Iron
Earth Hook/Eye Hook Bolt
Stay Set Complete (i/c stay clamp) Provided by HPSEBL
Stay Wire (7/3.15mm) (6.0 kg per stay set) Provided by HPSEBL
Earthing Set Complete (preferbly coil earthing)
Replacement of damaged/brunted 11KV AB Cable (HT 95mm2) with new XLPE Cable 95 mm2 TS. N0-266/2025-26 WBS NO- 32100261-001-UNA-HT-
Prov. 11kv,XLPE Cable (95 mm2) Provided by HPSEBL
G.I.Wire No. 8 SWG in mtr. Provided by HPSEBL
Increase of existing LT Pole with X-Arm MS Channel Iron: 100x50x6 Length 2340mmx2
X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.
Cable Termination kit
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp
Prov.MS Full Clamp
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.14 MB
Tendernotice_2.pdf
PDF • 0.38 MB
BOQ_183797.xls
BOQ • 0.39 MB
PLINTHDETAIL.pdf
Additional Documents • 0.76 MB
MESUREMENT.pdf
Additional Documents • 0.74 MB