Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 CrAccepted-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹7.2 Cr Quoted ₹6.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 Cr+₹75.0 L (11.7%)Rejected-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹7.1 Cr+₹75.0 L (11.7%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.8 Cr+₹1.4 Cr (22.1%)Rejected-AOC | ₹7.8 Cr+₹1.4 Cr (22.1%) | L3 | Rejected-AOC L3 |
Tender Value
₹9.9 Cr
EMD Value
₹19.7 L
Closing Date
8 Apr 2022, 3:00 pmClosed
Superintending Engineer Drainage Circle meerut
Victoria park colony Meerut
CONT. OF ANTI-EROSION WORKS BETWEEN 25.350 TO KM. 25.900 AND REPAIRING OF EXISTING DAMAGED STONE STUD BETWEEN KM 25.950 TO KM. 28.350 OF HINDON-YAMUNA DOAB BUND ON THE LEFT BANK OF YAMUNA RIVER NEAR VILLAGE GULAVALI AND YAKUTPUR IN DITT G.B. NAGAR
2022_UPIDC_683724_1
01/SE/2022-23
Open Tender
Civil Works
Item Rate
45 days
Gautambudhnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹19.7 L
Yes
24 May 2022
2 Apr 2022
8 Apr 2022
2 Apr 2022
8 Apr 2022
2 Apr 2022
Amount
Earth work in excavation for making slope on dry ordinary soil i/c lift upto 1.50m and lead upto 30.00m distance, ramming, dressing of surface to be required level, making slope, labour, T&P and all other taxes, disposal of surplus earth upto 30.0 m distance, etc complete. As per direction of Engineer in charge.
Supply of HDPE woven bags confirming to BIS no. 11652-2014 of cement bag size at site including cost of material, carriage, loading, unloading stacking, T&P and taxes etc. required for completion of work. as per direction of Engineer in charge.
Supply of HDPEGEO bags made of 240 gsm woven fabric confirming to 15351(2015) of size 1.09m x 0.69m. at site including cost of material ,carriage ,loading ,unloading, stacking ,T&P and taxes etc. required for completion of work. as per direction of Engineer in charge.
Filling of HDPE woven bags confirming to bis no. 11652-2014 of cement bag size with filling local earth, sewing & placing in position within 60 m distance beyond 1.00 km including all cost of labour, T&P, nylone rope create and all other taxes etc. required for completion of work but excluding cost of new bags.as per direction of Engineer in charge.
Filling of HDPEGEO bags made of 240 gsm woven fabric confirming to 15351(2015) of size 1.09m x 0.69m with local earth sewing with machine and placing in position beyond 1.00 km. distance over cement size bags filled in nylone rope creates including cost of labour, T&P and excluding cost cost of geo bags but including all other taxes .etc. required for complete of work as per direction of Engineer in charge.
Supplying & fixing of percupine constructed with 1:2:4 r.c.c. having 6 nos membrane of size 3.00 x0.10x0.10m jointed with specified bolt & washers i/c all cost of material, labour, T&P, and taxes etc. required for completion of work as per direction of Engineer in charge.
Supplying & fixing of bamboo bracing 50 to 80 mm dia i/c all cost of material, labour, T&P, and taxes etc.required for completion of work as per direction of Engineer in charge
Supplying and filling jhankar or jhau and placing in position involving carriage upto 5.0 k.m. i/c all cost of material, labour, T&P and taxes etc. required for completion of work.as per direction of Engineer in charge.
Spreading excavated earth in 30 cm. thick layers over G.E.O. bags with all cost of labour T&P etc complete. as per direction of Engineer in charge.
Supplying of dry split stone (20 kg. to 40 kg. wt.) at worksite including loading, unloading, stacking, cost of stone, cost of labour, T&P, royalty and all other taxes but excluding G.S.T. etc. complete. As per direction of Engineer in charge.
Laying and placing of split stone in launching apron of stud i/c cost of labour, T&P, and all other taxes but excluding cost of split stone etc. complete. As per direction of Engineer in charge.
Supplying and filling ordinary sand in stud’s stem i/c cost of sand, labour, and T&P etc. complete As per direction of Engineer in charge.
Laying split stone pitching in stud i/c labour, T&P and all other taxes etc. complete but excluding cost of split stone etc. complete As per direction of Engineer in charge.
M/S AJAY KUMAR
UNITE ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .