Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Non responsive, as firm has not submitted completion certificate, test report and and MOU between road building material and firm no work with admixture as per IRC SP 89 Part II 2018 |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
9 Dec 2020, 12:00 pmClosed
HQ CE (P) ARUNANK GREF,
HQ CE (P) ARUNANK GREF, DAM SITE NAHARLAGUN,AP
DESIGN, PRVDG LAYING OF SURF WRK INCL CTB COVER SAMI OVER MECH CHISEL CLEAN CTB PRIME COAT AND BC 40 MM IN RELE CLAUS IRC37 2018 IRC SP 89 PT II 2018 AT KM 53.00 KM 64.250 PT A KM 64.250 KM 71.300 PART B HURI AXIS RD HSH 85 RCC 756 TF P ANK A P
2020_BRO_597234_1
ANK/NIT-11/2020-21
Open Tender
Civil Works
365 days
AT KM 53-KM 64.250, KM 64.250-71.300 ON HSH RD
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹15 L
Yes
HQ CE (P) ARUNANK GREF, DAM SITE NAHARLAGUN,AP
22 Mar 2021
16 Nov 2020
10 Dec 2020
16 Nov 2020
9 Dec 2020
18 Nov 2020
18 Nov 2020 - 21 Nov 2020
23 Nov 2020
Amount
Part A (BETWEEN KM 53.00 T0 KM 64.250 ON ROAD HAPOLI-SARLI-HURI CSG ROAD (HURI AXIS) Job No.119/38 Ark (RE-RAE)
Provision & laying Base Course incorporating chemical admixture in combination with OPC Gde-43, 270 mm thick Cementitious Base (CTB) including preparation of soil Bed for the surfacing works in accordance with Relevant Clause of IRC-37 : 2018 and IRC-SP-89:2018.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 7.50 Kg per 10 sqm. (using BPD with manual labour)
Providing and laying of SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB layer by means of Synchronous Chip Sealer integrated computer controlled machinery. SAMI layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately covered with stone chips as per relevant clauses of IRC 37:2012, IRC 10:2005 & IRC-SP-34:1989.
Providing and laying 40 mm thick BC on SAMI layer with precoated stone chips grading confirming to Table:500-17 and mix satisfying the requirement of table 500-16 of MORT&H specns, mixed with 5% binder asphalt VG-10 penetration grade by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoSRT&H data book.
Earth work in embankment by filling with earth free from roots etc.Spreding in layer not exceeding 30 Cm including watering and finishing to required slop & level not exceeding 1.5 m hight above the base in ordinary soil in hill road where cut & fill method is adopted.
Part B (BETWEEN KM 64.250 T0 KM 71.300 ON ROAD HAPOLI-SARLI-HURI CSG ROAD (HURI AXIS) Job No.119/41 Ark
Provision & laying Base Course incorporating chemical admixture in combination with OPC Gde-43, 270 mm thick Cementitious Base (CTB) including preparation of soil Bed for the surfacing works in accordance with Relevant Clause of IRC-37 : 2018 and IRC-SP-89:2018.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 7.50 Kg per 10 sqm. (using BPD with manual labour)
Providing and laying of SAMI (Stress Absorbing Membrane Interlayer) Layer over CTB layer by means of Synchronous Chip Sealer integrated computer controlled machinery. SAMI layer shall comprise of application of Elastomeric Bitumen Emulsion and immediately covered with stone chips as per relevant clauses of IRC 37:2012, IRC 10:2005 & IRC-SP-34:1989.
Providing and laying 40 mm thick BC on SAMI layer with precoated stone chips grading confirming to Table:500-17 and mix satisfying the requirement of table 500-16 of MORT&H specns, mixed with 5% binder asphalt VG-10 penetration grade by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoSRT&H data book.
Earth work in embankment by filling with earth free from roots etc.Spreding in layer not exceeding 30 Cm including watering and finishing to required slop & level not exceeding 1.5 m hight above the base in ordinary soil in hill road where cut & fill method is adopted.
ZEOCRETE TECHNOLOGIES INDIA LLP
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid