| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | ₹3.8 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among two. |
| 2 | L2₹3.9 LRejected-Finance | ₹3.9 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | NANDINI ENTERPRISES L1 | JAGDESH PRASAD L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5m. & lead up to 30m and including back filling, watering & ramming of excavated earth into the plinth with removal & disposal of surplus earth as direction by the engineer-in-charge. | 190.56 | cum | 100 ₹19,056.2 Lowest | 132 ₹25,154.18 |
| 2.00 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | 12.54 | cum | 5,200 ₹65,205.4 Lowest | 5,600 ₹70,221.2 |
| 3.00 | Laying C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 29.68 | cum | 5,800 ₹1,72,167.2 | 5,750 ₹1,70,683 Lowest |
| 4.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 1.17 | cum | 7,500 ₹8,782.5 Lowest | 7,802.5 ₹9,136.73 |
| 5.00 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | 130.75 | sqm | 460 ₹60,145.46 | 450 ₹58,837.95 Lowest |
| 6.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 2.32 | cum | 4,500 ₹10,449 Lowest | 5,246.1 ₹12,181.44 |
| 7.00 | Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete. | 0.18 | MT | 65,000 ₹11,738.93 Lowest | 72,805.2 ₹13,148.54 |
| 8.00 | Providing struck deep pointing in 1:2 cement mortar including cost of all material ,labour ,T&P ,all lifts and leads etc complete. | 189.12 | sqm | 100 ₹18,912.25 Lowest | 116.1 ₹21,957.13 |
| 9.00 | Providing 75 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | 8 | NO. | 1,100 ₹8,800 Lowest | 1,220.3 ₹9,762.4 |
| 10.00 | S/F 75MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | 1.5 | NO. | 150 ₹225 Lowest | 154 ₹231 |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
27 Jul 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINER, MADHYA GANGA CANAL CONSTRUCTION DIVISION-9, SAMBHAL
CONSTRUCTION OF FALL AT KM. 2.800 OF FATEHPUR MINOR
2026_UPIDC_1167900_2
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
FATTEHPUR SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹16,000
Yes
21 Aug 2026
22 Jul 2026
27 Jul 2026
22 Jul 2026
27 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry soil including lift up to 1.5m. & lead up to 30m and including back filling, watering & ramming of excavated earth into the plinth with removal & disposal of surplus earth as direction by the engineer-in-charge. | 190.56 | cum | - | - |
| 2 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | 12.54 | cum | - | - |
| 3 | Laying C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 29.68 | cum | - | - |
| 4 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 1.17 | cum | - | - |
| 5 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | 130.75 | sqm | - | - |
| 6 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 2.32 | cum | - | - |
| 7 | Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete. | 0.18 | MT | - | - |
| 8 | Providing struck deep pointing in 1:2 cement mortar including cost of all material ,labour ,T&P ,all lifts and leads etc complete. | 189.12 | sqm | - | - |
| 9 | Providing 75 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | 8 | NO. | - | - |
| 10 | S/F 75MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | 1.5 | NO. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.56 MB
Tendernotice_2.pdf
PDF • 3.39 MB
BOQ_2199005.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].