Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹39.4 LAccepted-AOC ALIGARH | UTTAR PRADESH | 202001 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹42.6 L+₹3.2 L (8.00%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹45.9 L+₹6.5 L (16.4%)Rejected-Finance ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | L-3 | Rejected-Finance L-3 |
Tender Value
₹49.8 L
EMD Value
₹99,500
Closing Date
27 Dec 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Drainage circle Aligarh
SE Drainage circle Aligarh
Reconstruction of old Damaged V.R.B at Km. 1.610, 5.700, 9.100 and 12.386 and 05 No. Repair work of old Damaged V.R.B. at Teor Dy.
2022_UPIDC_752973_8
09/SE/2022-23
Open Tender
Civil Works
Item Wise
60 days
SE DRAINAGE CIRCLE ALIGARH
TENDER FEE
2 documents required · 2 mandatory
₹2,354
₹99,500
13 Feb 2023
22 Dec 2022
27 Dec 2022
22 Dec 2022
27 Dec 2022
22 Dec 2022
Amount
(Part -A) Earthwork in making and Removing bunds, ramps,Backfilling and making channel section U/S and D/S of V.R.B
Dismentling bricks or stone masonry in lime or cement including stacking of material within 60 metre.
Dismentling R.B. or R.C.C. work including stacking of material within 60 metre.
Laying of hume pipe NP -3 type 900 mm dia in position (Labour oly) including labour and T and P etc. required for completion of the work.
Earthwork in excavation of foundation in wet ordinary soil including lift up to 1.50 mtr. And lead up to 30.00 mtr.
C.C 1:3:6 in foundation and floor including cost of material, labour and TandP etc. complete.
Ist. Class brickwork in 1:4 C.M including all cost of material labour and TandP etc complete
Centering and shuttering of of R.C.C. work including all cost of material,labour and T and P etc. complete.
Steel reonforcement including bending , Binding , Cutting , Placing of reinforcement Material , Labour and T and P etc. complete.
R.C.C 1: 1.5 :3 in slab and abutment including all material , Labour and TandP etc. complete.
C. C 1:1.5:3 in wearing coat and floor including all material , Labour and T and P etc. complete.
Struck Deep cement pointing in 1:2 C.M. including all cost of material labour and TandP etc complete
Providing and laying 75 mm P.V.C. Pipe for Slab and Abutment
Finishing walls with weather coat by premium acrylic exterior paint applied @ 1.67 ltr/10 sqm. ( Asian or Burger brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufactureer exterior primer applied @ 2.20 kg/10 sqm. after throughly brushing the surface free from mortor dropping and other foreign matters and sand papered smooth including supply of all materials, labour TandP etc required for proper completion of the work.
Supply and fixing of information board including writing , material ,Labour etc completion of work
(Part - B) C.C 1:3:6 in foundation and floor including cost of material, labour and TandP etc. complete.
Ist. Class brickwork in 1:4 C.M including all cost of material labour and TandP etc complete
Centering and shuttering of of R.C.C. work including all cost of material,labour and TandP etc. complete.
Steel reonforcement including bending , Binding , Cutting , Placing of reinforcement Material , Labour and TandP etc. complete.
R.C.C 1: 1.5 :3 in slab and abutment including all material , Labour and TandP etc. complete.
C. C 1:1.5:3 in wearing coat and floor including all material , Labour and TandP etc. complete.
Struck Deep cement pointing in 1:2 C.M. including all cost of material labour and TandP etc complete
Providing and laying 75 mm P.V.C. Pipe for Slab and Abutment
Finishing walls with weather coat by premium acrylic exterior paint applied @ 1.67 ltr/10 sqm. ( Asian or Burger brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufactureer exterior primer applied @ 2.20 kg/10 sqm. after throughly brushing the surface free from mortor dropping and other foreign matters and sand papered smooth including supply of all materials, labour TandP etc required for proper completion of the work.
Supply and fixing of information board including writing , material ,Labour etc completion of work
SAKSHAM INFRA VENTURES PRIVATE LIMITED
M/S SANJAY KUMAR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .