| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC | ₹1.1 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹1.1 Cr+₹2.4 L (2.18%)Rejected-Finance | ₹1.1 Cr+₹2.4 L (2.18%) | 2 | Rejected-Finance 2 |
| 3 | 3₹1.2 Cr+₹5.9 L (5.26%)Rejected-Finance GRAM SOHANANG PO PACHPEDWA JANPAD GORAKHPUR | ₹1.2 Cr+₹5.9 L (5.26%) | 3 | Rejected-Finance 3 |
| 4 | 4₹1.2 Cr+₹8.7 L (7.76%)Rejected-Finance 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.2 Cr+₹8.7 L (7.76%) | 4 | Rejected-Finance 4 |
| 5 | 5₹1.2 Cr+₹11.9 L (10.7%)Rejected-Finance GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹1.2 Cr+₹11.9 L (10.7%) | 5 | Rejected-Finance 5 |
Tender Value
₹1.5 Cr
EMD Value
₹9.7 L
Closing Date
5 Dec 2025, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of 5 cell box culvert of 5x5 meter on Ghonghi nala near Gerui in District Gorakhpur in FY 2025-26 LOT No 1 of 2
2025_CEGKP_1093366_1
7653/135C-Gkp Circle/2025 dated 13-11-2025
Open Tender
Civil Works
Percentage
365 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹9.7 L
9 Apr 2026
25 Nov 2025
5 Dec 2025
25 Nov 2025
5 Dec 2025
25 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 75 | Cum | 500 | ₹37,500 |
| 2 | Excavation of foundation in ordinary soil (Ioam clay or sand) including lift upto 1.50 meter and lead up to 30meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30 meters from the foundation trenches.as per S.I. No. 251 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 530 | Cum | 200 | ₹1,06,000 |
| 3 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per clause 401. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 350 | Cum | 4,600 | ₹16,10,000 |
| 4 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. MORTH specification no.2100- (9.4) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 49.5 | Cum | 9,250 | ₹4,57,875 |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M30 using batching plant transit mixer & manual placing MORTH specification no. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 203 | Cum | 11,700 | ₹23,75,100 |
| 6 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M30 using batching plant transit mixer & manual placing, MORTH specification no. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 242 | Cum | 13,000 | ₹31,46,000 |
| 7 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M35 using batching plant transit mixer & manual placing. using batching plant transit mixer & manual placing, MORTH specification no. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 17.3 | Cum | 11,900 | ₹2,05,870 |
| 8 | Supplying, fitting and placing MS bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1600 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 45.4 | Mt | 78,000 | ₹35,41,200 |
| 9 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 80 | Cum | 4,500 | ₹3,60,000 |
| 10 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). | 80 | Nos | 400 | ₹32,000 |
stage.html
html • 0.06 MB
techsummary_2009550.pdf
BOQ Comparative Chart
xlsx
finsummary_2009550.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_2009550.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .