Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.9 LAccepted-Finance 233 SECTOR 19 A CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹9.9 L | 1 | Accepted-Finance Due to L-1 agency. |
| 2 | 2₹10.3 L+₹42,163.25 (4.28%)Rejected-Finance 1627 SECTOR 26 PANCHKULA | ₹10.3 L+₹42,163.25 (4.28%) | 2 | Rejected-Finance rate on higher side. |
| 3 | Rejected-Technical 86 CHARAN SINGH COLONY MAULI JAGRAN CHANDIGARH | - | - | Rejected-Technical Annexure-1 not attached. |
Tender Value
₹13.0 L
EMD Value
₹26,027
Closing Date
23 Jun 2026, 11:00 amClosed
XEN CP3 SEC 16 CHD
XEN CP3 SEC 16 CHD
AR AND SR ESTIMATE FOR RESIDENTIAL BUILDINGS OF GOVT. MUSEUM AND ART GALLERY, SCIENCE MUSEUM, AUDITORIUM AND EXHIBITION HALL, SECTOR 10 CHANDIGARH FOR THE YEAR 2026-27, (UNDER THE CONTROL OF SECTT. MTC. SUB DIVISION, CHANDIGARH).
2026_CHD_93354_1
CP3/2026/2885676
Open Tender
Civil Works
Percentage
SECTOR 10 CHANDIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹26,027
26 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing golden champ wood chowkhat (kiln seasoned) 4 1/2" x 2 1/4" including cost of corner straps, iron hold fasts, hinges, screws,nails, fevicol etc. and painting two coats of wood preserver to sides of chowkhats. Rate includes the cost of dismantling of all damaged chowkhats and making good the damage to walls plaster and floors as required including, refixing of grills, disposal of rubbish to the dumping ground the rate further includes the cost of painting two coats synthetic enamel paint over one coat of wood primer complete in all respect and to the entire satisfaction of Engineer-in-Charge. | 10.25 | rmt | 809.6 | ₹8,298.4 |
| 2 | Distempering with 1st quality acrylic distempe. (ready mixed) having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and of required said and colour complete to give and even said.
One or more coats on old work | 2,825.5 | sqm | 61.01 | ₹1,72,383.76 |
| 3 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour.
One coat | 1,825.15 | sqm | 89.52 | ₹1,63,387.43 |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
One or more coats on old work | 980.5 | sqm | 100.02 | ₹98,069.61 |
| 5 | Painting with aluminium paint of approved brand and manufacture to give an even shade:
One or more coats on old work | 140.38 | sqm | 93.41 | ₹13,112.9 |
| 6 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 930.13 | sqm | 24.47 | ₹22,760.28 |
| 7 | Preparation of plaster or concrete surface for oil bound distemper or emulsion or apex paint including sand papering the surface or scraping by patti applying filling with cement based putty (Birla, JK or equivalent) to required finish complete in all satisfaction of Engineer in Charge. | 930.13 | sqm | 27.8 | ₹25,857.61 |
| 8 | Finishing walls with Acrylic Smooth exterior paint of required shade :
Old work (One or more coat applied @ 0.90 ltr/10 sqm). | 1,850.75 | sqm | 78.47 | ₹1,45,228.35 |
| 9 | Providing and fixing barbed wire on existing picket with binding wire complete in all respect and to the entire satisfaction of Engineer-in-charge. | 450.25 | rmt | 81.04 | ₹36,488.26 |
| 10 | Providing and fixing 35mm thick phenol bounded factory manufactured solid flush door shutter ISI marked with both side commercial face in the existing chowkhat. The rate includes the cost of Alum hinges, all necessary Alum fittings and painting two coats over one coat of primer after preparation of surface (special quality) complete in all respect to the entire satisfaction of Engineer-in-charge. | 6.28 | sqm | 3,636.6 | ₹22,837.85 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_114294.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .