| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 149 PASUMAI NAGAR GUJILIYAMPARAI TK DINDIGUL 624 703 | DINDIGUL | TAMIL NADU | 624703 | ₹1.5 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | E SURESH CONTRACTOR L1 | VIHAAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Part 1: Periodic Renewal of the PMGSY road from D - K road to Trichy District limit ( via ) K.Anaipatty in Karungal panchayat Km 0/0 - 3/240 in Guziliamparai block Estimate amount : Rs. 58.29 Lakhs | |||||
| 2.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 3.00 | Km 0/0-1/0 | 13.2 | Cum | 3,949 ₹52,126.80 | 3,962 ₹52,298.40 |
| 4.00 | Km 1/0-2/0 | 14.32 | Cum | 3,959 ₹56,692.88 | 3,978 ₹56,964.96 |
| 5.00 | Km 2/0-3/0 | 18.04 | Cum | 3,969 ₹71,600.76 | 3,999 ₹72,141.96 |
| 6.00 | Km3/0-3/240 | 3.3 | Cum | 3,979 ₹13,130.70 | 3,999 ₹13,196.70 |
| 7.00Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2 to 2.50 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503. | |||||
| 8.00 | Km 0/0-1/0 | 3,653.75 | Sqm | 18.25 ₹66,680.94 | 29.1 ₹1.1 L |
| 9.00 | Km 1/0-2/0 | 3,750 | Sqm | 18.25 ₹68,437.50 | 29.1 ₹1.1 L |
| 10.00 | Km 2/0-3/0 | 3,750 | Sqm | 18.25 ₹68,437.50 | 29.1 ₹1.1 L |
Tender Value
Refer Docs
EMD Value
₹3.0 L
Closing Date
30 May 2025, 3:00 pmClosed
The Project Director,DRDA,Dindigul
The Project Director,DRDA,Dindigul
Periodic Renewal of PMGSY roads under PMGSY PERFORMANCE INCENTIVE GRANT 2024-25 including Maintenance TN05-01 Guziliamparai block of - 3 nos Dindigul District
2025_RDTN_141408_1
DPIR NO.2253-Tender-2025
Open Tender
Civil Works - Roads
120 days
DRDA
Periodic Renewal of PMGSY roads under PMGSY PERFORMANCE INCENTIVE GRANT 2024-25 including Maintenance TN05-01 Guziliamparai block of - 3 nos Dindigul District
2 documents required · 2 mandatory
₹0
₹3.0 L
DRDA,DINDIGUL
17 Dec 2025
17 May 2025
30 May 2025
17 May 2025
30 May 2025
17 May 2025
26 May 2025
Amount
Part 1: Periodic Renewal of the PMGSY road from D - K road to Trichy District limit ( via ) K.Anaipatty in Karungal panchayat Km 0/0 - 3/240 in Guziliamparai block Estimate amount : Rs. 58.29 Lakhs
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2 to 2.50 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous and PMB Cubes @ 5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Provision for KM stone
Provision for HM stone
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Repainting and Refixing the Logo board including all materials and all labour charges etc complete
Repainting and Refixing the Name board including all materials and all labour charges etc complete
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction for road works & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Part 2: Periodic Renewal of the PMGSY road from D - K road Puliyampatty to M.Kalathur in Vadugambady panchayat Km 0/0 - 2/990 in Guziliamparai block Estimate amount : Rs. 53.20 Lakhs
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2 to 2.50 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous and PMB Cubes @ 5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Provision for KM stone
Provision for HM stone
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Repainting and Refixing the Logo board including all materials and all labour charges etc complete
Repainting and Refixing the Name board including all materials and all labour charges etc complete
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction for road works & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Part 3: Periodic Renewal of the PMGSY road from Pungambady to Thangammapatty in R.Kombai panchayat Km 0/0 - 0/550 in Guziliamparai Block Estimate amount : Rs.9.93 Lakhs
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2 to 2.50 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous and PMB Cubes @ 5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Provision for HM stone
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Repainting and refixing the Name board including all materials and all labour chages etc complete
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction for road works & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
VIHAAN CONSTRUCTIONS (BID ID -618558)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid