| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.8 LAccepted-AOC NO 1 116 GANGAI AMMAN KOVIL STREET SORANJERY PATTABIRAM CHENNAI 600072 | CHENNAI | CHENNAI | TAMIL NADU | 600072 | ₹38.8 L Quoted ₹39.8 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹40.7 L+₹90,070 (2.26%)Rejected-Finance NO 3 PERIYAR STREET ANAIKATTUCHERI PATTABIRAM CHENNAI 600 072 | CHENNAI | THIRUVALLUR | TAMIL NADU | 600072 | ₹40.7 L+₹90,070 (2.26%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹43.2 L+₹3.4 L (8.47%)Rejected-Finance 203 1 THIRUMATHI SUNDARI ILLAM CHINNAMMEN KOIL STREET AVADI CHENNAI 600 054 | CHENNAI | THIRUVALLUR | TAMIL NADU | 600054 | ₹43.2 L+₹3.4 L (8.47%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹44.0 L+₹4.2 L (10.5%)Rejected-Finance 93 SRP KOVIL STREET PERAVALLUR CHENNAI 600 082 | CHENNAI | CHENNAI | TAMIL NADU | 600082 | ₹44.0 L+₹4.2 L (10.5%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹44.6 L+₹4.8 L (12.0%)Rejected-Finance NO 14 M C RAJA STREET MITTANAMALLI I A F AVADI CHENNAI 600 055 | CHENNAI | CHENNAI | TAMIL NADU | 600055 | ₹44.6 L+₹4.8 L (12.0%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Mariammal Constructions L1 | G HARI ELECTRICALS L8 | M/s Omm Muruga Enterprises L9 | SUBAMAGENCYANDCONSTRUCTION L7 | JANANIKARTHIK ENTERPRISES L4 | pmv.enterprises L3 | Shri Varaghaa L2 | SathguruSaiEnterprises L6 | SAMYDOSS CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. complete all as specified and directed. | 160 | Sqm | 100 ₹16,000 | 140 ₹22,400 | 79 ₹12,640 | 70 ₹11,200 | 75 ₹12,000 | 72 ₹11,520 | 50 ₹8,000 Lowest | 120 ₹19,200 | 85 ₹13,600 |
| 2.00 | Dismantling of Stone slab and tiles laid bedded and pointed in any mortar of any description or thickness in floors, apron etc complete all as specified and directed. | 8.2 | XSqm | 550 ₹4,510 | 700 ₹5,740 | 1,200 ₹9,840 | 90 ₹738 Lowest | 650 ₹5,330 | 360 ₹2,952 | 250 ₹2,050 | 500 ₹4,100 | 900 ₹7,380 |
| 3.00 | M&L for Demolition Cement concrete concrete (unreinforced concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) | 4.5 | Cum | 1,000 ₹4,500 | 900 ₹4,050 | 3,000 ₹13,500 | 500 ₹2,250 Lowest | 850 ₹3,825 | 900 ₹4,050 | 500 ₹2,250 Lowest | 800 ₹3,600 | 800 ₹3,600 |
| 4.00 | M&L for Demolition Reinforced Cement concrete of any description and
in any position not otherwise specifically provided for complete all as directed | 1 | Cum | 1,200 ₹1,200 | 1,000 ₹1,000 | 1,100 ₹1,100 | 499 ₹499 | 1,200 ₹1,200 | 980 ₹980 | 1,200 ₹1,200 | 300 ₹300 Lowest | 1,200 ₹1,200 |
| 5.00 | Taking down plastering on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc etc complete all as directed | 275 | Sqm | 90 ₹24,750 | 140 ₹38,500 | 99 ₹27,225 | 45 ₹12,375 Lowest | 65 ₹17,875 | 72 ₹19,800 | 50 ₹13,750 | 120 ₹33,000 | 60 ₹16,500 |
| 6.00 | Taking down chowkhats or frames with shutters and (without taking off shutters from frames) n.exc 1.5 sq. m each | 42 | Each | 250 ₹10,500 | 320 ₹13,440 | 350 ₹14,700 | 99 ₹4,158 Lowest | 200 ₹8,400 | 180 ₹7,560 | 100 ₹4,200 | 300 ₹12,600 | 300 ₹12,600 |
| 7.00 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) exc 1.5 sq. m but n exc 4 sq. m each | 10 | Each | 320 ₹3,200 | 360 ₹3,600 | 450 ₹4,500 | 99 ₹990 Lowest | 250 ₹2,500 | 180 ₹1,800 | 100 ₹1,000 | 340 ₹3,400 | 500 ₹5,000 |
| 8.00 | Taking up or down steel tubing and connections, including removal to store etc all as directed for 15mm bore | 50 | RM | 50 ₹2,500 | 70 ₹3,500 | 65 ₹3,250 | 87 ₹4,350 | 10 ₹500 Lowest | 36 ₹1,800 | 10 ₹500 Lowest | 60 ₹3,000 | 20 ₹1,000 |
| 9.00 | ditto all as item 08 above but for 20mm bore | 600 | RM | 40 ₹24,000 | 80 ₹48,000 | 75 ₹45,000 | 55 ₹33,000 | 15 ₹9,000 | 36 ₹21,600 | 10 ₹6,000 Lowest | 45 ₹27,000 | 25 ₹15,000 |
| 10.00 | dittio all as item 08 above but for 25mm bore | 400 | RM | 51 ₹20,400 | 85 ₹34,000 | 95 ₹38,000 | 65 ₹26,000 | 20 ₹8,000 | 36 ₹14,400 | 10 ₹4,000 Lowest | 44 ₹17,600 | 30 ₹12,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
13 Apr 2026, 6:00 pmClosed
Garrison Engineer, Avadi
GE Avadi
REPAIRS TO SANITARY FITTINGS, PLUMBING WORK, CLEANING/REPLACEMENT OF OVERHEAD TANKS AND ALLIED WORK IN DOMESTIC AND TECHNICAL AREA AT AF STN AVADI
2026_MES_758390_1
8384/E8
Open Tender
Civil Works
Item Rate
270 days
GE Avadi
As per Tender Documents
7 documents required · 7 mandatory
₹500
GE Avadi
₹80,000
Yes
27 May 2026
28 Mar 2026
15 Apr 2026
28 Mar 2026
13 Apr 2026
6 Apr 2026
28 Mar 2026 - 2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. complete all as specified and directed. | - | Sqm | - | - |
| - | Dismantling of Stone slab and tiles laid bedded and pointed in any mortar of any description or thickness in floors, apron etc complete all as specified and directed. | - | XSqm | - | - |
| - | M&L for Demolition Cement concrete concrete (unreinforced concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) | - | Cum | - | - |
| - | M&L for Demolition Reinforced Cement concrete of any description and
in any position not otherwise specifically provided for complete all as directed | - | Cum | - | - |
| - | Taking down plastering on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc etc complete all as directed | - | Sqm | - | - |
| - | Taking down chowkhats or frames with shutters and (without taking off shutters from frames) n.exc 1.5 sq. m each | - | Each | - | - |
| - | Taking down chowkats or frames with shutters (without taking off shutters from the frame) exc 1.5 sq. m but n exc 4 sq. m each | - | Each | - | - |
| - | Taking up or down steel tubing and connections, including removal to store etc all as directed for 15mm bore | - | RM | - | - |
| - | ditto all as item 08 above but for 20mm bore | - | RM | - | - |
| - | dittio all as item 08 above but for 25mm bore | - | RM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
8384tenderdocu.pdf
Tender Documents • 1.06 MB
BOQ_849460.xls
BOQ • 4.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .