| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-Finance SIDDHARTH NAGAR | L1 | Accepted-Finance LOWEST RATES | |
| 2 | L2₹14.9 L+₹1.1 L (8.09%)Rejected-Finance | L2 | Rejected-Finance HIGHER RATES | |
| 3 | L3₹16.0 L+₹2.2 L (15.8%)Rejected-Finance | L3 | Rejected-Finance HIGHER RATES | |
| 4 | L4₹16.8 L+₹3.0 L (22.0%)Rejected-Finance | L4 | Rejected-Finance HIGHER RATES | |
| 5 | L5₹17.0 L+₹3.2 L (22.9%)Rejected-Finance | L5 | Rejected-Finance HIGHER RATES |
Tender Value
₹18.8 L
EMD Value
₹38,000
Closing Date
12 Jun 2020, 2:00 pmClosed
Executive Engineer Saryu Drainage Khand-3 Gonda
Executive Engineer Saryu Drainage Khand-3 Gonda
Construction of V.R.B. at Km. 0.650 of Bankatwa Dy.
2020_UPIDC_479310_1
01/EE/2020-21
Open Tender
Civil Works
Item Rate
60 days
gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
Executive Engineer Saryu Drainage Khand-3 Gonda
₹38,000
Yes
3 Dec 2021
5 Jun 2020
12 Jun 2020
5 Jun 2020
12 Jun 2020
5 Jun 2020
Amount
Earth work in filing embankment; including all leads & lifts, all costof labours, T&P etc. with manual compaction and dressing to profile complete work.
Dry brick on edge soling with First-Class brick and preparation of sub grade and filling joints filled with local sand; including all cost of material, labour, T&P etc. complete work
Earth work in digging foundation in all type of soil including all leads and lifts, its disposal as per direction of Engineer incharge with cost of all materials, labours, T&P etc. required for proper completion of work
Centering and shuttering for C.C/R.C.C Work in different part of structure with all lead and lift required for proper completion of work including cost of all materials, labour T & P etc. complete.
Laying P.C.C. M-10 (1:3:6) in foundation with 43 grade O.P.C. cement, 20 to 40mm. Hard stone ballast and Hamirpur corse sand F.M not less then 2.0; including all lead and lift, with mechanical mixing, requaired for proper completion of work.
Brick work in 1:4 Cement mortar with frist class bricks and Hamirpur coarse sand; including cost of all materials,labour T&P etc required for proper completion of work.
Supply and laying two layers of tar paper, including all cost of material, labour, T&P etc. complete work.
Cutting, bending, binding and placing TMT steel reinforcement bar; including all cost of all material, binding wire, labours, T&P etc. but excluding cost of scafolding, required for proper compltion of work.
L/F joint filler board 20mm thck at specified locations in different structures of required for proper completion of work including cost of all materials, labour, T&P etc.
Laying R.C.C. A-20,(1:1.5:3) M-20 in with cement (O.P.C-43 Grade) coarse sand of F.M not less then 2.0 and Kabrai hard crushed stone grit of size 4.75 to 20mm; including cost of all materials, labours, T&P etc. with all lead & Lift; mechanical mixing & vibration but excluding cost of centering and shuttering required for proper completion of work.
Deep struck pointing in 1:2 C:M with Hamirpur coarse sand FM not less than 2.0, including all cost of material, labour,T&P etc. required for proper completion of work.
Earth work in back filling of foundation up to level as direction of engineer in charge, in all type of soil, including all lead & lift, all cost of material, labour, T&P etc. with manual compaction, complete work.
Dismantling of old & damaged brick on edge soling and stacking of brick as per direction of engineer-in-charge;including all cost of labours, T & P etc. complete.
Relaying of dry brick on edge soling with preparation ofsub grade, joints filled with local sand; excluding cost ofbricks but, including all cost of local sand, labour, T & P etc. complete work.
Earth work in removing of diversion road and disposal ofits as per direction of Engineer in charge, including cost of all lead ad lift,, excluding mechanical compac-tion but manual compaction and dressing toprofile complete work.
Supply & fixing wheel guard of R.C.C. post or hard stone 200 x 200 x 750 mm size; including all cost of material, labour, T&P etc. completion work.
M/S PRAVEEN KUMAR SINGH AND GENRAL ORDER SUPPLIERS
M/S virat constrution
SKYHOMES INFRACON
M/S OM PRAKASH SINGH CONTRACTOR
VIRENDRA KUMAR SRIVASTAVA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .