Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Rejected-Technical | - | Rejected-Technical Evaluation Completed Bidder is not Qualified |
Tender Value
₹5.0 L
EMD Value
₹14,873
Closing Date
4 Aug 2026, 3:00 pmClosed
Udhayan Prabhari Ghaziabad Nagar Nigam
IV floor Udhaayn Vibhag Ghaziabad Nagar Nigam
Work-02 Construction of a 2 Seat urinal along with the repair of footpaths and walls at Chandrashekhar Park in Ward-73 of the Mohan Nagar Zone.
2026_DOLBU_1172110_2
138/UDHYAAN/2026-27 GNN DT 21-07-2026
Open Tender
Miscellaneous Works
Percentage
30 days
Ghaziabad Nagar Nigam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹14,873
17 Oct 2026
24 Jul 2026
4 Aug 2026
24 Jul 2026
4 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 30m as per S.L.NO.2.6.1/D.S.R-2023 | 6.06 | m3 | 131.68 | ₹797.98 |
| 2 | Cement concrete with 4cm approved brick ballast fine sand 1.25 F.M. and cement in proportion of 8:4:1 in foundation and plinth ½ completion of the work SI No. | 1.41 | m3 | 5,053.61 | ₹7,142.27 |
| 3 | M-150 class B/W in 1:6 one cement and six fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour& tools and plants etc. required for proper completion of the work S.I. No. 6.2.2/D.S.R-2023 | 3.08 | m3 | 4,670.17 | ₹14,396.27 |
| 4 | 4cm thick Damp proof course with cement concrete consisting of 1 part cement 2 parts approved coarse sand and 4 parts approved 10mm graded stone grit etc, 5 completion of work S. I. No. 4.10/D.SR-2023 | 2.58 | m2 | 304.79 | ₹787.27 |
| 5 | Providing and applying a coat of residual petrolium bitmun of grade of B.G-10 of approved qualtiy using 1.7kg/sqm on D.P.C including cost of fuel, wood, other materials, labour T & P etc. required for proper completion of the work. S.I. No. 4.13/D.S.R-2023 | 2.58 | m2 | 108.42 | ₹279.72 |
| 6 | Brick work In cement mortar (1:6) with clay fly ash F.P.S non modular brick of class designation 7.5in super structure. S.I. No. 6.32.2/D.S.R-2023 | 7.84 | m3 | 6,747.33 | ₹52,921.4 |
| 7 | R.C.C. work with cement app. course sand & 2cm gauge approved stone grit in proportion of 1:1.5:3 in lintels of door and windows including centering and shuttering etc. and supply of all materials labour T & P etc. required for proper completion of the work.S.I. No. 5.3/D.S.R-2023 | 0.23 | m3 | 8,535.57 | ₹1,992.2 |
| 8 | R.C.C. work with cement app. course sand & 2cm gauge approved stone grit in proportion of 1:1.5:3. S.I. No. 5.3./D.S.R-2023 | 1.67 | m3 | 8,535.57 | ₹14,214.28 |
| 9 | Mild steel reinforcement in (Tor steel or plain) work for R.C.C. including bending of its supply completion of the 9 work. (10 mm - 12 mm) S.I.NO-5.22.1/D.S.R-2023 | 1.85 | Qlts | 7,945 | ₹14,718.11 |
| 10 | 12mm thick plaster with cement and fine sand of 1:25 F.M. on ceiling in 1:6 cement and find sand mortar in walls completion of the work.S.I. No. 13.1.2/D.S.R-2023 | 21.89 | m2 | 247.3 | ₹5,413.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
BOQ_2201130.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .