Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.7 LAdmitted-Finance | -20.00% | ₹15.7 L | L1 | Admitted-Finance |
| 2 | L2₹17.2 L+₹1.5 L (9.31%)Admitted-Finance | -12.55% | ₹17.2 L+₹1.5 L (9.31%) | L2 | Admitted-Finance |
| 3 | L3₹17.5 L+₹1.7 L (11.1%)Admitted-Finance | -11.11% | ₹17.5 L+₹1.7 L (11.1%) | L3 | Admitted-Finance |
| 4 | L4₹19.3 L+₹3.5 L (22.5%)Admitted-Finance | -1.99% | ₹19.3 L+₹3.5 L (22.5%) | L4 | Admitted-Finance |
Tender Value
₹19.7 L
EMD Value
₹39,320
Closing Date
29 May 2026, 1:00 pmClosed
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
EXECUTIVE ENGINEER PHEDD DIVISION BEAWAR
(NIT NO. 10/26-27) REPAIR AND MAINTENANCE OF DAULATPURA AND TODGARH ROAD PUMPING STATIONS IN URBAN WATER SUPPLY SCHEME IN RnD SUB DN BEAWAR UNDER PHED DIVISION BEAWAR
2026_PHCJA_562667_3
EE_PHED_BEAWAR_NIT_08-10/26-27
Open Tender
Miscellaneous Works
Percentage
365 days
AS PER TENDER DOCUMENTS
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹1,000
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
₹39,320
Yes
3 Jun 2026
26 May 2026
29 May 2026
26 May 2026
29 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Running expenditure of pump house which includes complete operation of pump motor, maintenance of log-books as directed by Engineer-in-Charge, general up keeping of premises, security arrangements, regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the campus of pump houses and all other work as mentioned in scope of work in tender documen for per pump house per month. (power supply minimum 16 hrs.) | |||||
| 1.01 | Above 100 HP to 200 HP | - | EACH | 62,220 | - |
| 1.02 | Above 200 HP | - | EACH | 91,500 | - |
| 2Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire) 'E' class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making with pump sets and transportation to and from installation site complete as per direction of Engineer-in-Charge | |||||
| 2.01 | Above 30.00 HP but upto 35.00 HP | - | EACH | 12,903 | - |
| 2.02 | Above 35.00 HP but upto 40.00 HP | - | EACH | 14,218 | - |
| 2.03 | Above 50.00 HP but upto 60.00 HP | - | EACH | 17,776 | - |
| 2.04 | Above 75.00 HP | - | EACH | 22,319 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
merged.pdf
Tender Documents • 0.75 MB
BOQ_1001289.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .