Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹57.8 L+₹3.2 L (5.79%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹56.3 L
EMD Value
₹57,000
Closing Date
20 Jul 2023, 3:00 pmClosed
The Addl Collector / Project DirecDRDA, Dharmapuri
DRDA, Dharmapuri
Providing approach road 2 Nos in Package No.TN04 - 19 Tribal 2020-21, Pappireddipatti P19
2023_RDTN_343317_1
Roc.No.330/2021/R9 Tribal P19
Open Tender
Civil Works
Item Rate
180 days
DRDA
can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹57,000
11 Dec 2023
13 Jul 2023
20 Jul 2023
13 Jul 2023
20 Jul 2023
13 Jul 2023
Amount
Providing approach road WBM Double Layer from B.Pallipatti -Sethapalayam to Arupalli Land Forest Limit Km.0/0-1/0 H/o. B.Pallipatti
Clearing the Scurb jungle remove away from the site including all labour charges etc., complete
Earth work excavation and depositing on bank with initial lead and list in all clauses as soil as per SS 20 A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80 100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in place method),
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre- measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing, including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre- measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Culvert 1.5m span @ Ch.330 m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.
Cement concrete 1:3:6 mix using Aggregate 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Centring charges fo Steel centring for RCC work including cost and conveyance of all materials etc., complete.
Centring charges fo Steel centring for RCC work including cost and conveyance of all materials etc., complete.
Fabrication and places in positing mild steel on rubbed for steel and all ream forced cement concrete work as per type designed given including cost of steel binding wire in all floors etc., complete with standard specification.
Reinforcement Concrete 1: 1 1/ 2: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Wepholes
Provision for Expansion Joints (Bituman Pad)
Provision for Citizen Information Board
Provision for Sign Board
Provision for HM Stone
Provision for KM Stone
Providing approach road WBM Double Layer from B.Pallipatti -Sethapalayam to Arupalli Land Forest Limit Km.0/0-1/0 H/o. B.Pallipatti
Clearing the Scurb jungle remove away from the site including all labour charges etc., complete
Earth work excavation and depositing on bank with initial lead and list in all clauses as soil as per SS 20 A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80 100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in place method),
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre- measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing, including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre- measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Culvert 1.5m span @ Ch.330 m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.
Cement concrete 1:3:6 mix using Aggregate 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Centring charges fo Steel centring for RCC work including cost and conveyance of all materials etc., complete.
Centring charges fo Steel centring for RCC work including cost and conveyance of all materials etc., complete.
Fabrication and places in positing mild steel on rubbed for steel and all ream forced cement concrete work as per type designed given including cost of steel binding wire in all floors etc., complete with standard specification.
Reinforcement Concrete 1: 1 1/ 2: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Wepholes
Provision for Expansion Joints (Bituman Pad)
Provision for Citizen Information Board
Provision for Sign Board
Provision for HM Stone
Provision for KM Stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
THANGARASU
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .