| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.9 LAccepted-AOC | ₹44.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.6 LRejected-Finance MOHANLALGANJ LUCKNOW UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | ₹45.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹46.3 LRejected-Finance M 254 AASHIYANA COLONY LDA COLONY KANPUR ROAD LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹46.3 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | - | - | Rejected-Technical Found Ineligible |
| 5 | Not Admitted-Fee/PreQual/Technical EWS 2123 0 AVAS VIKAS NO 01 KALYANPUR KANPUR NAGAR UTTAR PRADESH 208017 | KANPUR NAGAR | UTTAR PRADESH | 208017 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Raj Boux Yadav L1 | m/s mohd. zamil L2 | J P ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dimolishling of old & damaged VRB including Dimolishling of RCC slab brick work of abatment PCC of foundation with its. proper disposal all complete the work as per direction Engineer-in-charge.
(A) Dimolishling of brick work | 9.62 | M3 | 600 ₹5,772 | 561.94 ₹5,405.86 Lowest | 570 ₹5,483.4 |
| 2.00 | (B) Breaking brick ballast (25mm to 40mm size) 40mm gauge excluding cost of Bricks | 6.61 | M3 | 295 ₹1,949.95 | 280.5 ₹1,854.11 Lowest | 285 ₹1,883.85 |
| 3.00 | Earth work in excavation of foundation in all type of soil with lead up to 30 M lift up to 1.50 M with back filling i/c cost of all meterial Labour T & P etc. required. For proper completion of work. | 134.64 | M3 | 110 ₹14,810.4 | 107.53 ₹14,477.84 Lowest | 109.25 ₹14,709.42 |
| 4.00 | P/L Cement Concrete 1:3:6 in Foundation with (1 Cement, 3 Coarse sand & 6 Stone aggregate 20mm to 40mm size) including cost of all meterial Labour, T & P etc. required for proper completion of the work. | 26.66 | M3 | 6,800 ₹1,81,288 | 6,404.75 ₹1,70,750.64 Lowest | 6,507 ₹1,73,476.62 |
| 5.00 | Centering and Shuttering for R C C work including rent of shuttering material labour and T & P required for proper completion of work for slab and wall | 662.45 | M² | 700 ₹4,63,715 Lowest | 840.57 ₹5,56,835.6 | 854 ₹5,65,732.3 |
| 6.00 | Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. | 10.71 | MT | 74,975 ₹8,02,982.25 | 70,643.27 ₹7,56,589.42 Lowest | 71,780 ₹7,68,763.8 |
| 7.00 | P/L R.C.C. with cement coarse sand and 20 mm gauage approved stone aggregate in the proportion of 1:1.5:3 (1 Cement, 1.5 Coarse sand & 3 Stone aggregate 20mm size) in footings of foundations vertical member and slab etc. excluding supply of reinforcement and its fixing and binding the same but including supply of all materials, labour and tools and plants etc. required for proper completion of the works. As per direction of E/I. Cost of binding wire shall also be included in this Item. | 108.54 | M3 | 8,500 ₹9,22,590 | 8,087.75 ₹8,77,844.39 Lowest | 8,218 ₹8,91,981.72 |
| 8.00 | Providing and Laying 150 mm thick brick ballast 25 to 40 mm gauge as filter i/c cost of material labour, T&P etc. all complete the work.
(i) Excluding Cost of material | 6.61 | M3 | 130 ₹859.3 | 128.1 ₹846.74 Lowest | 130 ₹859.3 |
| 9.00 | (ii) With material | 22.3 | M3 | 2,400 ₹53,520 | 2,255.22 ₹50,291.41 | 2,251 ₹50,197.3 Lowest |
| 10.00 | Brick Work in 1:4 cement and c. sand morter with M-150 Bricks including cost of all material, labour and T&P etc. all Complete the work as per direction of Engineer-in-charge. | 173.8 | M3 | 8,000 ₹13,90,400 | 7,821.95 ₹13,59,454.91 Lowest | 7,946.7 ₹13,81,136.46 |
Tender Value
Refer Docs
EMD Value
₹97,600
Closing Date
23 May 2026, 10:00 amClosed
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-02 LOT-01
2026_UPIDC_1149249_1
02/SE-VII/2026-27
Open Tender
Civil Works
Item Rate
180 days
Haidergarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹488
₹97,600
Lucknow
13 Jul 2026
18 May 2026
23 May 2026
18 May 2026
23 May 2026
18 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dimolishling of old & damaged VRB including Dimolishling of RCC slab brick work of abatment PCC of foundation with its. proper disposal all complete the work as per direction Engineer-in-charge.
(A) Dimolishling of brick work | 9.62 | M3 | - | - |
| 2 | (B) Breaking brick ballast (25mm to 40mm size) 40mm gauge excluding cost of Bricks | 6.61 | M3 | - | - |
| 3 | Earth work in excavation of foundation in all type of soil with lead up to 30 M lift up to 1.50 M with back filling i/c cost of all meterial Labour T & P etc. required. For proper completion of work. | 134.64 | M3 | - | - |
| 4 | P/L Cement Concrete 1:3:6 in Foundation with (1 Cement, 3 Coarse sand & 6 Stone aggregate 20mm to 40mm size) including cost of all meterial Labour, T & P etc. required for proper completion of the work. | 26.66 | M3 | - | - |
| 5 | Centering and Shuttering for R C C work including rent of shuttering material labour and T & P required for proper completion of work for slab and wall | 662.45 | M² | - | - |
| 6 | Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. | 10.71 | MT | - | - |
| 7 | P/L R.C.C. with cement coarse sand and 20 mm gauage approved stone aggregate in the proportion of 1:1.5:3 (1 Cement, 1.5 Coarse sand & 3 Stone aggregate 20mm size) in footings of foundations vertical member and slab etc. excluding supply of reinforcement and its fixing and binding the same but including supply of all materials, labour and tools and plants etc. required for proper completion of the works. As per direction of E/I. Cost of binding wire shall also be included in this Item. | 108.54 | M3 | - | - |
| 8 | Providing and Laying 150 mm thick brick ballast 25 to 40 mm gauge as filter i/c cost of material labour, T&P etc. all complete the work.
(i) Excluding Cost of material | 6.61 | M3 | - | - |
| 9 | (ii) With material | 22.3 | M3 | - | - |
| 10 | Brick Work in 1:4 cement and c. sand morter with M-150 Bricks including cost of all material, labour and T&P etc. all Complete the work as per direction of Engineer-in-charge. | 173.8 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2151497.xls
BOQ • 0.34 MB
BID02LOT01.pdf
Tender Documents • 2.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].