Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.6 LAccepted-AOC PLOT NO 626 627 GIDC BEHIND GANGOTRI DIARY PORBANDAR 360 577 | PORBANDAR | GUJARAT | 360577 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹1.1 Cr+₹8.7 L (8.95%)Rejected-Finance 201 CHAURANG HEIGHTS CHS PLOT NO 117 SECTOR 13 KHARGHAR NAVI MUMBAI 410210 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410210 | L2 | Rejected-Finance NOT BEING L1 | |
| 3 | L3₹1.1 Cr+₹10.3 L (10.6%)Rejected-Finance 2ND FLOOR CHAWDA COMMERCIAL CENTRE LINK ROAD MALAD WEST MUMBAI MUMBAI MAHARASHTRA 400064 | MUMBAI SUBURBAN | MAHARASHTRA | 400064 | L3 | Rejected-Finance NOT BEING L1 | |
| 4 | L4₹1.2 Cr+₹19.0 L (19.5%)Rejected-Finance | L4 | Rejected-Finance NOT BEING L1 | |
| 5 | L5₹1.6 Cr+₹62.2 L (63.8%)Rejected-Finance | L5 | Rejected-Finance NOT BEING L1 |
Tender Value
₹1.3 Cr
EMD Value
₹2 L
Closing Date
27 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER CG GOA
CHIEF ENGINEER CG GOA 403806
REPAIRS REPLACEMENT TO HANGAR DOOR OF P532 AT CGAIS GOA
2023_MES_620138_1
82059/E8
Open Tender
Civil Works
Item Rate
180 days
GOA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹1,000
GE (I) CG GOA
₹2 L
Yes
1 Dec 2023
22 Sept 2023
30 Oct 2023
22 Sept 2023
27 Oct 2023
13 Oct 2023
Amount
Taking out and refixing of hanger door of size 40M X 12M (The door consists of 08 leaves of size 5m x 12m) dismantling of top tracks, dismantling of bottom rail, removal of top and bottom guide wheels and repairs works incl automation
(A) E/M WORKS:- M& L for Design, testing and commissioning for automation operation of hanger door with all safety measures incl all items/ materials required complete with comprising the following Note: Desighning of Automation of door duly vetted by IIT/ NIT shall be submitted to GE before execution of works. (i) OPERATING UNIT : A traction drive operating unit consisting of a special designed gear box along with integral double flanged MS drive wheel which acts a single unit for one of the bottom wheels. Incorporated with Consts. Duty 3 or 5 hp Electric Motor, IP-55 Protection to suit electric supply of 415 V, 3-phase AC & 50 Cys With energy efficient rating having PF more than 0.85, robust construction. In case of POWER FAILURE, change over from electrical to manual operation is to be achieved by declutching the idler gear into manual position using which two person are able to operate the drive manually with handle and doors shall be opened by disengaging the Gear Box (04 Nos). (ii) BOTTOM WHEELS: Each door leaf is to be supported at the bottom on minimum of 2 Nos. Heavy duty double flanged steel track wheels of required diameter as per design requirement. The wheel assemblies shall be vertically adjustable, wheel assemblies shall be so that it permits removal of the wheel without removing the door leaf from its position on the rails. The machine wheel treads concentric with bearing. The distance between flanges shall not exceed the width of the rail. Wheel bearing Tapered rollers or spherical bearings, either internal or cartridge type, arranged so that both horizontal and vertical loads shall be transferred to the rail only through the bearing Bearing shall be tightly sealed and equipped with high with high-pressure grease fittings(16 Nos) (iii) Top Rollers System: Each leaf is to be guided at top by min 2 Nos. telescopic Assembly specially designed to compensate the allowable structural deflection, reduce to overall weight of the structure and ensure the smooth running of leaf across the clear opening (16 Nos) (iv) Control Panel Systems:-Each Door Control Panel shall consist of DOL starters and VFD, drive contactors, motor protection, control fuse holder, fused and indication lamps interlock contactors, limit / proximity switches, warning lights/hooter, trailing/bunching cable/wiring on the door after the main incoming power junction box. The incoming and of each control panel will be of MCCB 415 Volts, 63 Amps, 10KA and Outgoing will be of MCCB 415 Volts,32 Amps, 10KA.(02 N0s)
(v) Door Operation Safety:-The following features shall be incorporated in the control system of the door. a) protective coating / painting:- All steel work within is fully-painted with one coats of epoxy primer & two coats of epoxy paint b) cladding system:-The hangar doors are designed to accept the following principal cladding materials, The entire surface area of the hangar doors is fitted full width x full height with a vertically-laid 0.5-0.6 mm thick Precoated Corrugated Galvalume Sheet c) door seals:-All seals are designed to resist draught and dust. All vertical joints between leaves on adjacent tracks and the two end jambs are fitted with single EPDM wiper seals set in aluminum extrusions d) Control Panel location: The Control Panel shall be located as directed by engineer in charge for easy operation and enable the operator to have a full view of the area during operation of the door. e) Buffers: Heavy duty energy absorbing buffer stops are to be designed and to be provided at the extremities of the bottom track to cushion and stop the doors coming off the end of their tracks in an emergency situation f) Operation: The OPEN & CLOSE Push Buttons are constant pressure (HOLD to RUN) and the EMERGENCY STOP Push Buttons is STAY PUT type and have to be twisted to release. g) Emergency switch: Emergency limit switch shall be provided at the extreme limits of travel just before the mechanical buffers. These emergency limit switches shalltotally cut-off the control/power supply to the system in case the doors over shoot their normal limits. h) Audio/Visual Alarm: Master door panel shall be provided with a Flash Light cum Hooter that shall start & continue to operate during the time door is in operation. i) Key operation: An operation key switch shall be provided on each control panelto prevent unauthorized operation of the doors
(B) CIVIL WORKS: B/R (a)Supply and fixing of Top tracks with ISMB 150 size, 150 x 75 mm shall be installed with in the door pocket frame to be designed and installed independent of the hanger buildings. Top tracks will be suitably integrated with the main building structure, Suitable arrangements will be made by the manufacturer to attach the top tracks and sealings with the top girder in order to hold the door in place. (b)The upper frame section of each leaf shall be equipped with a minimum of 2 horizontally arranged guide wheels . These wheels shall be fitted with low maintanace ball bearing made of steel which are mounted on a galvanised steel axis . This steel axis shall be fixed in the frame in a suitable manner that the door frame is held firmly and safely in event of thermal expansion and wind situations. (c )Supply and fixing vertical sealing between two the leaves is affected via special two pieces EPDM profiles running along the entire length of the door panels. The vertical sealings between the adjecent door leaves as wellas in between the building and the door leaves consist of a two piece EPDM rubber gasket with an efficient joint transmission coefficient value. (d )Supply and fixing Bottom tracks size ISCR 50, 50 X 90mm . Flange shall be made of suitably designed profiles that shall prevent excessive deflecion against the vertical loads of the door leaf panels and prevent the ingress of the adjoining concrete. The bottom tracks shall have inbuilt egress for storm water collection in the tracks. (e)Supply and fixing lower carrying guide rollers per leaf ,shall be made of high quality steel ST 52-3 incl two flanges. These running wheels shall be mounted in a solid galvanised wheel housing made of ST 52-3 Steel sections , This wheel housing shall be bolted in the corner area of the door leaf at the vertical and horizontal frame sections. (f) Water in the grooves to be drained through the galvanised drainage ducts mounted under the bottom guide rails in regular intervals via collecting pipe . Each collecting pipe is equipped with one cleaning opening (g) Collission buffer to be mounted in the area of each top track . Each shock absorber unit to consist of a solid accommodation console of galvanised steel. (h) Making good of disturbed floor to match with existing floor specification (i) Painting two coats of red oxide primer and one coat synthetic paint to all new and old steel structres (j) Supply and fixing of bird proof net at top of track in horizontal position. (k) Supply and fixing of jointing plate 8 mm thick leaf expansion as per requirement
Dismantling of plain or corrugated steel sheeting any gauge thickness including nainital or similar pattern roof coverings, cladiings , hanger door etc
Supply and fixing prepainted galvalume aluminium zinc coating GI bsed corrugated steel sheet 0.5mm thick of any colour having tensile strength of 550Mpa as in cladding , fixed with self tapping screws complete all as specified.
Modern Engineering Co
Gandhi Automations Pvt. Ltd.
KVL CONSTRUCTION
Nitesh Enterprise
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .