| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ACCEPTED |
| 2 | Accepted-Technical | Accepted-Technical ACCEPTED |
| 3 | Accepted-Technical | Accepted-Technical ACCEPTED |
| 4 | Rejected-Technical | Rejected-Technical Rejected due to Bank solvency and experience Certificate i.e. Building work are not uploaded as per requirement of NIT |
| 5 | Rejected-Technical | Rejected-Technical Rejected due to Experience Certificate i.e. Building work is not uploaded as per requirement of NIT |
Tender Value
₹19.3 L
EMD Value
₹38,674
Closing Date
15 Jan 2026, 6:00 pmClosed
Deputy Commandant (Engineer)
FHQ SSB, Block-V, Sec-1, R K Puram, New Delhi-66
Construction of 20Battle Assault Obstacle Course (BAOC) at SSB Academy Bhopal (MP)
2026_SSB_892578_1
98/SSB/Academy/2025-26
Open Tender
Civil Works
Percentage
90 days
SSB Academy Bhopal, Chandukheri, Bhopal (MP)
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹38,674
FHQ SSB R K Puram, New Delhi
2 Feb 2026
5 Jan 2026
16 Jan 2026
5 Jan 2026
15 Jan 2026
5 Jan 2026
7 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth leadupto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All Kind of Soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) cum
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over Thermo-Mechanically Treated bars of grade Fe-500D or more. and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
19.35 Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 600 mm dia RCC pipes.
GST correction factor on DSR 23 on account of GST @(1-0.973=0.027)
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.10 MB
BOQ_938183.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .