Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance | ₹4.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.5 LAccepted-Finance | ₹4.5 L | L2 | Accepted-Finance L2 |
| 3 | L3₹4.6 LAccepted-Finance | ₹4.6 L | L3 | Accepted-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MITTAL BROTHERS L1 | LEKHRAJ L2 | M/S YAMUNA EARTH MOVERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting Jhunds and Moonj With Disposal away From Site | 5,184 | sqm | 8 ₹41,472 | 21 ₹1.1 L | 22.75 ₹1.2 L |
| 2.00 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 2,118 | sqm | 60 ₹1.3 L | 28 ₹59,304 | 31.2 ₹66,081.60 |
| 3.00 | Silt Ciearance/trench Digging with Slush including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. A By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 4,566 | cum | 60 ₹2.7 L | 62 ₹2.8 L | 60.45 ₹2.8 L |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
11 May 2026, 5:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT07
2026_UPIDC_1145472_7
01/EE/2026-27
Open Tender
Civil Works
25 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹15,000
Yes
8 Jun 2026
6 May 2026
12 May 2026
6 May 2026
11 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Jhunds and Moonj With Disposal away From Site | 5,184 | sqm | - | - |
| 2 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 2,118 | sqm | - | - |
| 3 | Silt Ciearance/trench Digging with Slush including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. A By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 4,566 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_2141449.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid