Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹136.8 CrAccepted-AOC A1 8TH FLOOR SAFAL PROFITAIRE CORPORATE ROAD PRAHLADNAGAR AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | ₹136.8 Cr Quoted ₹76.7 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not responsive |
| Sl No | Description | Qty | Unit | Advent Envirocare Private Limited L1 |
|---|---|---|---|---|
| 1.00Schedule 1- Design Services | ||||
| 1.01 | Collection & Conveyance of Seepage Contaminated Water | 1 | LS | 7,50,000 ₹7.5 L |
| 1.02 | Pretreatment system | 1 | LS | 15,00,000 ₹15 L |
| 1.03 | Sludge handling system | 1 | LS | 75,00,000 ₹75 L |
| 1.04 | DMF System | 1 | LS | 2,50,000 ₹2.5 L |
| 1.05 | UF System | 1 | LS | 15,00,000 ₹15 L |
| 1.06 | RO-I System | 1 | LS | 20,00,000 ₹20 L |
| 1.07 | RO-II System | 1 | LS | 15,00,000 ₹15 L |
| 1.08 | Evaporator system | 1 | LS | 20,00,000 ₹20 L |
| 1.09 | Boiler | 1 | LS | 7,50,000 ₹7.5 L |
Tender Value
₹46.9 Cr
EMD Value
₹24 L
Closing Date
8 Apr 2025, 3:30 pmClosed
MANAGING DIRECTOR
SIPCOT Head office Egmore Chennai
Design and Build 2000 KLD capacity Zero Liquid Discharge (ZLD) based Common Effluent Treatment Plant (CETP)with 5 Years of operation and maintenance on DBO basis at SIPCOT Industrial Park, Perundurai, Erode district, Tamil Nadu
2025_SIPCT_535131_1
NIT.No.44/CD/T.No.44/2024-25
Open Tender
Civil Works
SIPCOT Industrial Park, Perundurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24 L
SIPCOT Head office
4 Sept 2025
24 Mar 2025
9 Apr 2025
24 Mar 2025
8 Apr 2025
24 Mar 2025
1 Apr 2025
Amount
Schedule 1- Design Services
Collection & Conveyance of Seepage Contaminated Water
Pretreatment system
Sludge handling system
DMF System
UF System
RO-I System
RO-II System
Evaporator system
Boiler
Product water transmission main
common civil works
Common electrical items such as Transformer, DG set
Others - PLC/SCADA / OCEMS system (CCTV) and Lab instruments, Chemical & Glassware
Schedule 2 - Plant and Equipments Supplied
Collection & Conveyance of Seepage Contaminated Water
Electro Mechanical
Electrical
Instrumentation
Pretreatment system
Electro Mechanical
Electrical
Instrumentation
Sludge handling system
Elecro mechanical
DMF System
Electro Mechanical
Electrical
Instrumentation
UF System
Electro Mechanical
Electrical
Instrumentation
RO-I System
Electro Mechanical
Electrical
Instrumentation
RO-II System
Electro Mechanical
Electrical
Instrumentation
Evaporator system
Electro Mechanical
Boiler
Electro Mechanical
Product water transmission main
Electro Mechanical
Common electrical items such as Transformer, DG set
electrical works
Others - PLC/SCADA / OCEMS system (CCTV) and Lab instruments, Chemical & Glassware
Electro Mechanical
Instrumentation
Schedule 3- Build, installation and other services
Collection & Conveyance of Seepage Contaminated Water
civil and structural works
Electro Mechanical
Electrical
Instrumentation
Pretreatment system
civil and structural works
Electro Mechanical
electrical
Instrumentation
Sludge handling system
civil and structural works
Electro Mechanical
DMF System
civil and structural works
Electro Mechanical
Electrical
Instrumentation
UF System
civil and structural works
Electro Mechanical
electrical
Instrumentation
RO -I System
civil and structural works
Electro Mechanical
Electrical
Instrumentation
RO-II System
civil and structural works
Electro Mechanical
Electrical
Instrumentation
Evaporator system
civil and structural works
Electro Mechanical
Boiler
Electro Mechanical
Product water transmission main
Electro Mechanical
commom civil works
civil and structural works
Common electrical items such as Transformer, DG set
electrical works
Others - PLC/SCADA / OCEMS system (CCTV) and Lab instruments, Chemical & Glassware
Electro Mechanical
Instrumentation
Schedule 4- Annual fixed O & M Charge (for year 1 after COD)
Manpower
Admin & Insurance charges
Schedule 5 -Annual variable O & M charge (for year 1 after COD )
Chemical and consumables
Repair and rectification charges
Evaporator operating cost
Sludge and salt Disposal Cost
Schedule 6 - Assets replacement cost at present rate
Assets replacement cost for membrane at present rate (for 5 years O & M Period
Schedule 7 - Maximum Guaranteed Energy consumption Per annum - (for evaluation purpose)
Maximum Guaranteed Energy consumption for Annual Output of 100 % (i.e - 2000 KL x 365 Days x Energy tariff @Rs.7.00 Kw/hr)
Schedule 8 - Maximum Demand requirement Per annum (for evaluation purpose)
Maximum Demand requirement in KVA per annum (i.e - Rs.550 per KVA/Month x 12 Months )
Sub Total of Total Amount in Column BA (ie. Qty x Unit Rate)
Added GST of 18%
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid