Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | ₹1.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.8 LRejected-Finance | ₹1.8 L | L2 | Rejected-Finance OK |
| Sl No | Description | Qty | Unit | AYYAKANNU PANDIYAN L2 | KATHAN INFRA TECH L1 |
|---|---|---|---|---|---|
| 1.00Name of work : Renovation of SHG building @ Poyyamani in Poyyamani panchayat | |||||
| 2.00 | Dismantling the roof top portion including cost of conveyance of all materials to work site and all labour charges etc., complete | 51.29 | Sqm | 30 ₹1,538.70 | 25 ₹1,282.25 |
| 3.00 | Finishing with Top one layer of pressed tiles including cost and conveyance and all labour charges ete complete | 26.34 | Sqm | 1,420 ₹37,402.80 | 1,410 ₹37,139.40 |
| 4.00 | Plastering WITH CEMENT MORTER 1:3 MIX 10MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete | 3.57 | Sqm | 330 ₹1,178.10 | 328 ₹1,170.96 |
| 5.00 | Pointing with CEMENT MORTOR 1:3 MIX to RR pointing including all labour chrges etc., complete | 18.13 | Sqm | 370 ₹6,708.10 | 366 ₹6,635.58 |
| 6.00 | Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete. | 29.64 | Sqm | 1,530 ₹45,349.20 | 1,525 ₹45,201 |
| 7.00 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. | 23.3 | Sqm | 40 ₹932 | 39 ₹908.70 |
| 8.00 | Distembering two coats including cost of conveyance of all materials to work site and all labour charges etc. complete | 63.68 | Sqm | 155 ₹9,870.40 | 150 ₹9,552 |
| 9.00 | Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete | 100.97 | sq.m | 270 ₹27,261.90 | 267 ₹26,958.99 |
| 10.00 | Painting two coats old iron works including cost and conveyance of all materials to site and all labour charges etc., complete. | 22.82 | sq.m | 160 ₹3,651.20 | 158 ₹3,605.56 |
Tender Value
₹1,850
EMD Value
₹1,850
Closing Date
20 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(B.Pt)
PANCHAYAT UNION VIRALIMALAI
Renovation of SHG building at Poyyamani in Poyyamani panchayat
2026_RDTN_656599_1
VMLI_PACK_REPAIR_06
Open Tender
Civil Works
180 days
VIRALIMALAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,850
13 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Dismantling the roof top portion including cost of conveyance of all materials to work site and all labour charges etc., complete
Finishing with Top one layer of pressed tiles including cost and conveyance and all labour charges ete complete
Plastering WITH CEMENT MORTER 1:3 MIX 10MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete
Pointing with CEMENT MORTOR 1:3 MIX to RR pointing including all labour chrges etc., complete
Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete.
Distembering two coats including cost of conveyance of all materials to work site and all labour charges etc. complete
Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete
Painting two coats old iron works including cost and conveyance of all materials to site and all labour charges etc., complete.
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And
Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 63
Supply and fixing of single box tube ligtht
Provision for door and window repair
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 35 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_787392.xls
BOQ • 0.33 MB
POYYAMANI.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid