| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | +5.00% | ₹4.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.8 L+₹11,101.66 (2.38%)Admitted-Fee/PreQual/Technical/Finance | +7.50% | ₹4.8 L+₹11,101.66 (2.38%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.8 L+₹15,542.33 (3.33%)Admitted-Fee/PreQual/Technical/Finance | +8.50% | ₹4.8 L+₹15,542.33 (3.33%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
19 Aug 2026, 5:00 pmClosed
GM CV AREA
OFFICE OF GENERAL MANAGER CV AREA-XII
DISMANTLING OF OFFICE BUILDING OF V.WEST COLLIERY UNDER C.V.AREA
2026_BCCL_363294_1
BCCL/XII/ACE/ e-Tender-40/2026-27/40 Dated 07.08.2026
Open Tender
Civil Works - Buildings
Percentage
15 days
CV Area
Please refer to the tender document.
3 documents required · 3 mandatory
₹5,600
21 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
19 Aug 2026
9 Aug 2026
8 Aug 2026 - 12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING AND DEMOLISHING Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: Asbestos Cement sheet | 124.7 | SQM | 49.15 | ₹6,129.01 |
| 2 | DISMANTLING AND DEMOLISHING Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.94 | CUM | 1,457.35 | ₹2,833.09 |
| 3 | DISMANTLING AND DEMOLISHING Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: R.S. Joists | 518.4 | KG | 2.1 | ₹1,088.64 |
| 4 | DISMANTLING AND DEMOLISHING Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 42.17 | CUM | 2,126.1 | ₹89,657.64 |
| 5 | DISMANTLING AND DEMOLISHING Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 18 | EACH | 240.4 | ₹4,327.2 |
| 6 | DISMANTLING AND DEMOLISHING Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 115 | CUM | 1,232.8 | ₹1,41,772 |
| 7 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor two level in Cement mortar 1:6 (1 cement : 6 coarse sand) | 16.73 | Cum | 6,038.5 | ₹1,00,993.91 |
| 8 | FINISHING 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | 133 | SQM | 222 | ₹29,526 |
| 9 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_376211.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .