| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.5 LAccepted-AOC | L1 | Accepted-AOC LOWEST AND REASONABLE | |
| 2 | L2₹80 L+₹2.5 L (3.16%)Rejected-Finance KRAL PORA BAGH I MEHTAB NEAR MANCHOWA PETROL PUMP DISTRICT BUDGAM 190019 J K | BUDGAM | BUDGAM | J K | 190019 | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹1.2 Cr+₹39.4 L (50.8%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹1.3 Cr+₹49.5 L (63.8%)Rejected-Finance BU 02 SFS FLATS OUTER RING ROAD PITAMPURA NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | Rejected-Technical | - | Rejected-Technical Due to category for maint only |
Tender Value
₹77.8 L
EMD Value
₹1.4 L
Closing Date
19 Jul 2022, 6:00 pmClosed
CWE AF SRINAGAR
CWE AF SRINAGAR
SPECIAL REPAIRS TO AIR CONDITIONING PLANT OF WSA AT 1 WING AF SRINAGAR
2022_MES_520125_1
CWE(AF)SGR/SGR-07/2022-23
Open Tender
Civil Works
Lump-sum
180 days
AF STATION SRINAGAR
AS PER NIT
8 documents required · 8 mandatory
₹1,000
GE AF SRINAGAR
₹1.4 L
Yes
11 Aug 2022
26 Apr 2022
21 Jul 2022
26 Apr 2022
19 Jul 2022
30 Jun 2022
Amount
Design, Supply, Installation, Testing and Commissioning of water cooled scroll chiller of capacity not less than 35 TR having eco friendly refrigerant R-410A with Inverter driver technology having COP 4.4 which are equipped with intermediate discharge valve and a variable frequency drive with microprocessor controller, with multiple scroll compressors, with suitable TEFC motor, water cooled condenser, evaporater, suction, discharge shut off valves, ressure switches, refrigerant piping, base frame, insulation, controls, vibration isolators, automatic capacity control systems if applicable, oil pump, drive package, strainers, and refrigerant throttling device to suit the chiller all as specified and/ or directed etc., complete. The capacity of water chilling package unit shall not be less than 35TR at the following specified conditions. Chilled water inlet temperature: 54 ° F, Chilled water outlet temperature 44 ° F, Condenser water inlet temperature: 85 ° F, Condenser water outlet temperature: 95 ° F, Evaporater fouling factor: 0.0001 Sq ft Hr F/ Btu in FPS units, Condenser fouling factor: 0.00025 Sq ft Hr ° F/ Btu in FPS units. (2 working and 1 standby)- 03 Nos RCC / Cement concrete foundation for the unit as per OEM recommendation. Chilling machines as described above Note : - The machine shall be taken inside in CKD condition so as to not to damage the existing building. Any temporary removal of any Door/Window/Tiles/Floor etc. item shall be made good in original condition by the contractor. (b) Supplying, installing, testing and commissioning of CENTRIFUGAL SPLIT CASING / END SUCTION PUMPS, factory mounted on a common base with electric motor for recirculation of water for the central air conditioning system. End suction, vertical split case design, in cast iron bronze fitted construction specifically designed for quiet operation for chilled water cooling systems as directed by Engineer-in-Charge. All pumps shall be provided with mechanical seal and aligned properly as required. The pump motor shall be suitable for 415 +1-10% volts, 50 cycles, 3 phase power supply. The quoted price shall include cost of thermal insulation and cladding of chilled water pumps. Secondary chilled water pumps shall be suitable for operation on Adjustable frequency drives. Pumps with performance characteristics as given below.
Notes - (a) Contractor / bidder should submit complete design for the Central AC plant comprising of heat load calculations, working drawings of complete AC plant supported with design/calculations duly vetted by IIT/NIT of each component within one month of the date of commencement of work through GE for the approval of Accepting Officer before execution of the work. (b) Contractor/bidder will be responsible for performance guarantee of complete AC plant to achieve the inside design conditions round the clock throughout the year with overall COP of the system not less than 4.7. (c) Lump sum quoted by the bidders shall be deemed to be inclusive of design charges of Air Conditioning Plant and vetting of the same by IIT/NIT. Nothing extra shall be payable on this account. (d) Rates quoted by the contractor shall be for complete finished work including cost of all labour material, scaffolding, finishing as required with tools, plants, cartage, lift, taxes, tollage, octroi, royalties etc. All works shall be executed as per BoQ, particular specification, drawings and instructions of engineer in-charge and shall include the supply and installation at site of all the equipment, ancillary materials as specified and all such items what- so-ever which may be required to fulfill the desired intent and purpose. All materials shall be as per ISI specification and with IS certification marked wherever applicable. The material shall be duly approved by engineer-in-charge before incorporation in the work. (e) Lump sum quoted by the bidders shall be deemed to be inclusive of Air Conditioning Plant and all other items as listed in this BoQ from ser No 1.00 to 1.17 including successful testing & commissioning. Bidders shall quote their rates accordingly.
(i) PRIMARY CHILLED WATER PUMP Monoblock type pump Suitable HP, TEFC squirrel cage induction motor with class 'F' insulation, 2900 rpm , operating on 415 +/- 10% volts, 3 phase, 50 Hz A.C. supply. Expended Polystyrene (TF quantity) insulation not less than 50mm thick duly cladded between aluminum sheets of 0.5mm thickness and properly clamped to pump in two semicircular sections as per specifications. 150 mm dia. dial type pressure & temperature gauges - 03 Each Mounting frame with Anti vibration pads. Operating parameters Water flow rate = 204 USGPM Head = 65ft ot 20 Mtr. Motor HP = 10.0 HP (Suggested) 2 WORKING and 1 STANDBY- 3 NOS Note : Mounting frame with anti vibration pad with RCC/cement concrete foundation for the pump unit included under respective items No (i).
(ii) SECONDRY CHILLED WATER PUMP Supply, installing, testing and commissioning of Secondary Variable Speed Pumping System consisting of adjustable frequency drive (AFD) for each pump. 1 No. microprocessor based pump controller per zone housed within the enclosure of one of the AFD with pumping software duly downloaded & single / multiple differential pressure sensor / transmitters as per the site requirement. The entire system along with secondary pumps must be sourced from pumping system supplier only, for unit responsibility. Secondary chilled water pumps comprising of the following :- The system shall be complete in all respects and suitable for following ratings. Split casing type pump -02 Each Suitable HP, TEFC squirrel cage induction motor with class 'F' insulation, 1450 rpm, operating on 415 +/ - 10% volts, 3 phase, 50 Hz A.C. supply - 02 Ecah Expended Polystyrene (TF quantity) insulation not less than 50mm thick duly cladded between aluminum sheets of 0.5mm thickness and properly clamped to pump in two semicircular sections as per specifications. 150 mm dia dial type pressure & temperature gauges -04 Each Microprocessor based BMS compatible, variable frequency speed controller complete with necessary fittings and wiring. Controllers suitable to control 2 nos. pumps separately. Sensor / Transformer Water flow rate for each pump : 204 USGPM Head : 65 feet /20 Mtr. Motor HP : 10 HP (Suggested) Qty ( 01 WORKING + 01 STANDBY including controller unit ) Note : All, pumps, Motors, VFD, controller and software etc are to be sourced from the same vendor. All VFD shall have separate controller. The cost of mounting frame with anti vibration pad with RCC/cement concrete foundation for the pump units shall be deemed to be included under the respective item.
(iii) CONDENDER WATER PUMP Split casing type pumpSuitable HP, squirrel cage induction motor with class 'F' insulation, 1450 rpm, operating on 415 +/- 10% volts, 3 phase, 50 Hz A.C. supply with following specification : - 150 mm dia. dial type pressure & temperature gauges -02 Each Operating parameters Water flow rate = 140 USGPM Head = 65 Ft. of water /20 mtr. Motor HP = 10 HP (Suggested) Quantity 2 WORKING and 1 STANDBY-3 NOS Note : The cost of mounting frame with anti vibration pad with RCC/cement concrete foundation for the pump unit shall be deemed to be included under the respective item. (c) AHU: Supply, Installation, Testing and Commissioning of factory built floor mounted double skin type air handling units made of 23+/-2 mm thick panels consisting of G.I. Casing of thickness 0.6 mm outside layer 0.6 mm thickness inside layer with polyurethane foam (PUF) insulation of density not less than 38 Kg/Cum factory injected between them by injection molding machine complete with 6 row deep cooling coil with aluminum finned copper tubes, filter sections with 50 mm thick metal washable synthetic type air pre-filters, belt drive package with TEFC drive motor suitable for 415+ 1-10% volts, 50 HZ, 3 Phase, A.C. supply, drain connections, stainless steel drain pan, necessary vibration isolation arrangement, foundations, etc. complete as per specifications and of following capacities. The AHU shall be capable of Delivering min 10000 CFM at 65 mm static,with Pre filters section, cooling coil, backward curved blower. The cost of distributers shall be part of the AHU. All coils for Air handling units shall be 120% capacity of the capacity indicated. Additional rows if required shall be provided at no extra cost. ( Note: Humidifier / strip heater should be inbuilt in AHU unit for maintaining the desired vapor content at a specific temperature and maintain also RH value. -02 Each.
(i) Supply, Installation, Testing and Commissioning of 3-way motorized valves suitable for Chilled water as well as hot water application complete with Electrical / Electronic actuator, necessary wiring and required accessories for proper operation and control of valves of 80mm diameter size including Modulating Thermostat with control wiring etc. as per specification.-02 nos (ii ) Supply of HVAC dedicated VFDs with IP 55 enclosures with Mains disconnect, complying with the tender specifications and having:-02 nos (iii) Built-in dual 5% impedance DC link reactor (harmonic filters) on the positive and negative rails of the DC bus of the VFD. (iv) Built-in EMC Filters (electromagnetic compatibility filters) for VFDs for restriction of conducted emissions to comply with IEC61800: 3 (unrestricted distribution):2004 Category C 3. (v) Three-feedback PID controller having capability to simultaneously accept 3 feedback signals from temperature sensors or pressure sensors for process optimization and accordingly regulate the speed of the AHUs. (vi) Additional 3 PID controllers to control external devices such as chilled water modulating valve, fresh air damper, etc. thus reducing the number of I/Os in DDC Controllers & improving system reliability. (vii) Automatic Energy Optimization / Load dependent flux optimization functionality for maximum energy savings. (viii) MODBUS RTU as the communication protocol between BMS & VFDs. (ix) VFDs not meeting above requirements shall provide external disconnect, external harmonic filters, additional external EMC Filters to comply with IEC61800: 3 (unrestricted distribution):2004 Category C 3, external PLCs / DDCs to achieve 3 Feedback PID Controller functionality and external devices controlling capabilities. (x) The VFD cost shall include suitable PID controller for regulating the flow of air by controlling the frequency of VFD. 10.0 HP
(f) WATER EXPANSION TANK: Supply, Installation,Testing and commissioning of 1000 Litre INSULATED PRESSURISED CLOSED WATER EXPANSION TANK suitable for total volume of water in chilled water circuit along with necessary accessories such as 2 Nos pumps (1working +1standby) with Pressure Transmitter and interconnecting Pipe & Isolating Valve. The tank shall be pre-charged.Expansion tank Shall be with replaceable heavy duty butyl rubber bladder. The tank shall have 50 MM system connection and 20 mm drain and charging valve connection to facilitate the on site charging of nitrogen in the tank. The tank shall be fitted with lifting rings and a floor mounting skirt for vertical installation. The tank must be constructed in accordance with IS-STANDARD 2825-1969 suitable for 125 PSI working pressure. The complete system shall be sourced from single manufacturer and supplied and installed with all accessories and safety fixtures required for proper functioning of the complete hydronic system. Chilled water closed vessel pressurized expansion tank as described above shall be duly insulated with 50 mm thick EPS insulating material and cladded with aluminum Sheet (20G) as specified.-01 Each
2. SUB HEAD: B - PIPING (a) Supply, laying , connecting , fixing and testing of MS ERW class C pipe complete with all fitting duly insulated as mentioned theirin for closed cell elostromeric insulation 30 to 40 kg /cum density & GI lagging laid underground / floor etc complete all as specified and directed for the following pipes : - (i) 150mm to 350mm dia "6.35mm. IS:3589.-30 RM (ii) 125 mm dia MS pipes- 110 RM (iii) 100 mm dia MS pipes- 120 RM (iv) 80 mm dia MS pipes- 350 RM (vi) 50 mm dia MS pipes- 25 RM (vii) 65 mm dia MS pipes- 55 RM (b) Supplying, fixing, testing and commissioning of Cast Iron butterfly Valves as per specification. (i) 150 mm dia valves.-02 Nos (ii) 125 mm dia valves.-06 Nos (iii) 100 mm dia valves.-16 Nos (c) Supplying, fixing, testing and commissioning of Cast copper alloy Butterfly Valves as per specification. (i) 80 mm dia Valves.-16 Nos (ii) 65 mm dia Valves.-02 Nos (iii) 50 mm dia Valves.-03 Nos (d ) Supplying, fixing, testing and commissioning of Balancing Valves as per specification. (i) 100 mm dia valves.- 05 Nos (ii) 80 mm dia Valves.-05 Nos
(e) Supplying, fixing, testing and commissioning of Check Valves as per specification. (i) 100 mm dia valves.-03 Nos (ii) 80 mm dia valves-03 Nos (f) Supplying, fixing, testing and commissioning of Y-Strainer as per specification. (i) 100 mm dia valves.-08 Nos (g) Providing and fixing in position following Y strainers valves duly insulated as per specifications. (i) 80 mm dia-05 Nos (h) Supplying, installation, testing and commissioning of Auto air vents.-04 Nos (j) Supply and fixing in position the industrial type pressure gauges with gun metal ball valves.-16 Nos (k) Supply and fixing in position the mercury-in- glass industrial type thermometers.-28 Nos (l) Supply and fixing in position the following CPVC heavy grade min 3 mm thick pipes cut to required lengths and installed with all screwed joints with the necessary elbows, tees and reducers etc as per specifications. (i) 32 mm dia pipes-40 RM
3. SUB HEAD: C - AIR DISTRIBUTION (a) Supply, Installation, Testing and Commissioning of site fabricated galvanised steel sheet (GSS) ducting as per the relevant IS / drawing of duct approved by accepting office of following thickness including necessary supports, adjustable dampers, vanes, etc complete as per specifications. (i) 24 gauge galvanised sheet steel-290 Sqmt (ii) 22 gauge galvanised sheet steel-175 Sqmt (iii) 20 gauge galvanised sheet steel-65 Sqmt (b) Supply, fabrication, installation and testing the flexible connections constructed of fire resistance flexible double canvas sleeve as per the approved drawingr - 04 Each (c ) Supply, installation and testing of GI construction Louver dampers within ducts to be provided with suitable ducts lever and quadrants for manual control of volume of air flow and for proper balancing of the air distribution system.-7.5 Sqm ( Including smoke detector / fire demper & volume control damper of appropriate size with control mechanism)
(d) Supplying, fixing, testing and commissioning of motor actuated Fire Dampers of at least 1.5 hour fire rating in supply air duct at wall crossing of AHU room/as and where required, of requires sizes including control wiring. The damper shall be motorized and spring return so as to close the damper in the event of a fire signal which shall be provided by smoke sensor/detector in AHU room as per specifications and as required. The spring return action shall be in-built mechanism and not externally mounted. The control wiring shall be interlocked ion such a way that along with actuation of damper-closing mechanism, the AHU fan motor gets automatically switched off. Fire damper as described above, as per specifications and complete in all respects.-06 Sqm (e) Electric actuator with necessary linkage to actuate fire dampers complete with required wiring and associated accessories.-02 Nos Note: Fire dampers shall be supplied with sensors/actuators/control etc duly factory fitted and tested at manufacturers works and certificate to this effect produced along with delivery of fire damper.- (f) Supply, Installation, Testing and Balancing of Powder coated extruded aluminum construction Linear Grilles with removable core as per approved drawings and specifications. Quoted price shall be without volume control damper at the location of supply air collar-30 Sqm (g) Supply, installation, testing and balancing of powder coated extruded aluminum square shape ceiling diffusers with removable core and anti smudge ring as per specifications. Quoted price shall be without volume control damper at the location of supply air collar-16 Sqm (h) Supplying & fixing of opposed blade aluminum construction volume control dampers in supply air duct collars as per approved drawings and specifications.-28 Sqm (j) Supply, installation, testing and balancing of inlet air louvers with bird screen and volume damper for fresh air in powder coated extruded aluminum construction as per specifications and approved shop drawings.-03 Sqm
M/S RATHER CONSTRUCTION CO
AIRFRAME
Pneumatic Engineers Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .