| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-Finance | ₹34.0 L | L1 | Accepted-Finance Being L1. |
| 2 | L2₹37.2 L+₹3.2 L (9.53%)Rejected-Finance | ₹37.2 L+₹3.2 L (9.53%) | L2 | Rejected-Finance Being not L1. |
| 3 | L3₹38.9 L+₹4.9 L (14.5%)Rejected-Finance | ₹38.9 L+₹4.9 L (14.5%) | L3 | Rejected-Finance Being not L1. |
| 4 | L4₹40.7 L+₹6.7 L (19.6%)Rejected-Finance IKHRAJ PORA JAWAHAR NAGAR SRINAGAR KASHMIR | SRINAGAR | JAMMU AND KASHMIR | ₹40.7 L+₹6.7 L (19.6%) | L4 | Rejected-Finance Being not L1. |
| Sl No | Description | Qty | Unit | KAMAL AGGARWAL L1 | M/S SK ATLANTIC ENTERPRISES L4 | COSMO BUILDERS L3 | JOGRAJ CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n exc 30cm deep and averaging 15cm deep and getting out in soft/loose soil all as specified and directed by Engr-in-charge. | 194 | Sqm | 30 ₹5,820 | 30 ₹5,820 | 15 ₹2,910 Lowest | 20 ₹3,880 |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil all as specified and directed by Engr-in-charge. | 264.64 | Cum | 150 ₹39,696 | 100 ₹26,464 Lowest | 100 ₹26,464 Lowest | 120 ₹31,756.8 |
| 3.00 | Excavating over areas in soft/loose soil exc 1.5m deep and not exc 3.0 m deep and getting out complete all as specified. | 93.6 | Cum | 180 ₹16,848 | 150 ₹14,040 Lowest | 150 ₹14,040 Lowest | 150 ₹14,040 Lowest |
| 4.00 | M&L Plain cement concrete (1:3:6) type C-2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified. | 21.8 | Cum | 2,300 ₹50,140 | 100 ₹2,180 Lowest | 4,000 ₹87,200 | 3,500 ₹76,300 |
| 5.00 | M&L Plain cement concrete (1:2:4) type B-2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified. | 8.43 | Cum | 3,200 ₹26,976 Lowest | 4,200 ₹35,406 | 5,600 ₹47,208 | 5,500 ₹46,365 |
| 6.00 | M&L Cement concrete 1:4:8 type D-2 using 40mm graded stone aggregate as in foundation, filling and mass concrete all as specified and directed by Engineer - in - Charge | 6.25 | Cum | 2,100 ₹13,125 Lowest | 4,000 ₹25,000 | 3,000 ₹18,750 | 2,800 ₹17,500 |
| 7.00 | M&L for plain cement concrete (1:5:10) type D-2 using 40mm graded stone aggregate as in foundation filling and mass concrete and as in sub base of floors complete all as specified and directed by Engr-in-Charge. | 18 | Cum | 2,000 ₹36,000 Lowest | 3,800 ₹68,400 | 2,800 ₹50,400 | 2,750 ₹49,500 |
| 8.00 | Excavation in post holes (or similar holes) each n exc 0.5 cum, getting out , returning filling in layers not exceeding 25cm including watering and ramming and removing surplus earth to a distance not exceeding 50 metre complete all as specified. | 15 | Each | 200 ₹3,000 | 150 ₹2,250 | 100 ₹1,500 Lowest | 100 ₹1,500 Lowest |
| 9.00 | Use & waste fair finished flat surfaces Formwork to faces of walls, retaining walls, abutments, parapets and staircase railing and similar work including attached pillasters, buttresses, etc.; vertical or to better | 169 | Sqm | 350 ₹59,150 | 210 ₹35,490 Lowest | 545 ₹92,105 | 550 ₹92,950 |
| 10.00 | M&L for reinforced cement concrete Design mix M-25 (20mm graded aggregates) in Walls, retaining walls, basement walls and the like; any thickness; above top of footings; including attached pilasters and buttresses | 36.88 | Cum | 3,850 ₹1,41,988 Lowest | 7,100 ₹2,61,848 | 6,100 ₹2,24,968 | 6,000 ₹2,21,280 |
Tender Value
₹38.8 L
EMD Value
₹77,500
Closing Date
3 Dec 2025, 6:00 pmClosed
Maj Ashish Kanyan
GE Kapurthala
Certain provision works in the AoR of AGE B/R-ll under GE Kapurhtala.
2025_MES_733348_2
8090/E8
Open Tender
Civil Works
Item Rate
180 days
Area under GE Kapurthala
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Kapurthala
₹77,500
12 May 2026
19 Nov 2025
5 Dec 2025
19 Nov 2025
3 Dec 2025
26 Nov 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority : Garrison Engineer Kapurthala
Contract No : GE KPT- /2025-26
S.No Description of work Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder Rs. Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Surface excavation n exc 30cm deep and averaging 15cm deep and getting out in soft/loose soil all as specified and directed by Engr-in-charge. 1 194 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil all as specified and directed by Engr-in-charge. 2 264.64 Cum 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
Excavating over areas in soft/loose soil exc 1.5m deep and not exc 3.0 m deep and getting out complete all as specified. 3 93.6 Cum 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
M&L Plain cement concrete (1:3:6) type C-2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified. 4 21.8 Cum 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
M&L Plain cement concrete (1:2:4) type B-2 using 40mm graded stone aggregate as in foundation filling and mass concrete complete all as specified. 5 8.43 Cum 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
M&L Cement concrete 1:4:8 type D-2 using 40mm graded stone aggregate as in foundation, filling and mass concrete all as specified and directed by Engineer - in - Charge 6 6.25 Cum 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
M&L for plain cement concrete (1:5:10) type D-2 using 40mm graded stone aggregate as in foundation filling and mass concrete and as in sub base of floors complete all as specified and directed by Engr-in-Charge. 7 18 Cum 100 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Excavation in post holes (or similar holes) each n exc 0.5 cum, getting out , returning filling in layers not exceeding 25cm including watering and ramming and removing surplus earth to a distance not exceeding 50 metre complete all as specified. 8 15 Each 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Use & waste fair finished flat surfaces Formwork to faces of walls, retaining walls, abutments, parapets and staircase railing and similar work including attached pillasters, buttresses, etc.; vertical or to better 9 169 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
10 36.88 Cum 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Form work to sides of concrete fdn footing base of columns and raft beams sides and soffits (if any) of fdn and plinth beams and similar wk vertical or to batter for rough finished surfaces. 11 25 Sqm 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Form work to sides of pillars, posts, struts, pier, columns square, rectangular or polygonal rough finished surface of concrete. 12 30 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
Form work to sides and soffits of floor or roof beams, beam haunching, lintel etc rough finished surfaces of concrete flats. 13 50 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; exceeding 200mm thick (Horizontal or sloping) all as specified and directed by Engr-in-charge. 14 50 Sqm 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
RCC M-25 design mix as in fdn, including raft, fooling fdn beams, plinth beams bases for columns and mass concrete. 15 8 Cum 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
RCC M-25 design mix as in Plinth beams,Roof Beam, cantilivers, bressummers, lintel over 1.5m span all as specified and directed by Engr-in-charge.. 16 7 Cum 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
RCC M-25 design mix as in columns , pillars, piers, posts and struts etc. 17 3 Cum 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
18 7.5 Cum 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
19 6971.08 Kg 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
20 1395.74 Kg 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
M&L for framed mild steel work of grade E-165 (Fe-290) as in framed work such as doors, gates or Flat iron frame work for drain covers etc,complete all as specified. 21 1550 Kg 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
Rolled sections as in main and cross beams, hip and jack rafters; purlins where connected to common rafters and running rails and guides for sliding doors ; fixed with angle cleats or other connecting plates of Fe-290 grade E-250 complete all as specified. 22 837 Kg 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
23 2.4 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
24 35 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
25 10 Kg 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
26 84 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
M & L for Pre painted galvalume aluminium zinc coating GI based Plain steel sheet 0.50 mm thick of an colour having tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws all as specified and as directed by Engineer-in-Charge. 27 3.6 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
M&L for Old size Brickwork with subclass ‘B’ bricks, straight or curved on plan exc 6m mean radius built in CM 1:6 all as specified and directed by Engr-in-Charge. 28 42.83 Cum 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
M&L Brick work with sub class 'B' burnt clay bricks (old size bricks) straight or curved on plan to any radius in half brick thick walls built in cement mortar 1:4 complete all as specified and directed by Engr-in-charge . 29 229.4 Sqm 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
M&L for flush pointing to brick walls with CM 1:3 complete all as specified and directed by Engr-in-charge . 30 44.64 100 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
Providing cement concrete (1:2:4) type B-1 using 20mm graded stone aggregate as in copings, kneelers, apex stones, bed plates etc including necessary form work complete. 31 7.14 Cum 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Extra for forming fair finish to drain or channel of cement concrete, 30cm inner girth, using extra cement including forms moulds/mitered stopped ends etc. complete all as spd. 32 324 Rm 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
M&l for Pre-cast Reinforced cement concrete (1:2:4) type B-1 using 20mm graded stone aggregate as in manhole covers , Drain Covers and set in cement mortar (1:4) including form work complete all as specified. (Reinforcement measured separately). 33 18.22 Cum 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
M&L painting with synthetic enamel paint two coats over a coat of red oxide primer including preparing the new untreated steel surfaces of any description over 10cm in width or girth. 34 49 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
M&L for Boring 300mm Dia holes 10m deep in any type of soil for under-reamed piles and getting out and disposal of spoil to a distance of n exc. 50 m Complete all as specified and directed.. 35 2 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
36 22 Rm 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
37 3 Rm 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
M&L for filling 12.5mm Graded coarse aggregates in harvesting pit upto height 0.50m Complete all as specified and directed.. 38 8 Cum 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
M&L for filling 3mm to 5mm PEA Gravel in harvesting pit Complete all as specified and directed.. 39 8.76 Cum 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
M&L for filling Coarse Sand in harvesting pit upto height 0.50m Complete all as specified and directed.. 40 8 Cum 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
M&L for Rendering 15mm thick on fair faces brick surfaces in cement mortar 1 : 4 finished even and smooth without using extra cement including WPC @ 3% of wt of cement complete all as specified. 41 165.2 Sqm 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Ditto all as per item sl no 14 here-in-before but in cement mortar 1:6 complete all as specified and directed by Engr-in-charge. 42 78 Sqm 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
M&L for Rendering 10mm thick on fair faces of concrete surfaces surfaces in cement mortar 1 : 3 as in ceiling finished even and smooth without using extra cement complete all as specified. 43 50 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
M&L for preparation of new plastered surfaces of walls and applying 2mm thick of Birla white putty to obtain the true line to achieve smooth surface and applying two coats of oil bound distermper complete all as specified and directed by Engr-in-Charge 44 78 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
M&L applying two coats of exterior emulsion (Apex) paint on newly plastered or unplastered wall surface over a coat of cement primer including preparation of surfaces, complete all as specified and as directed. 45 78 Sqm 100 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
M&L for preparation of new plastered surfaces of ceiling and applying three coats of white wash on ceiling and wall complete all as specified and directed by Engr-in-Charge 46 80 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
47 7.35 Cum 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
48 35 Sqm 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
49 120 Sqm 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
50 20 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
51 9 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
52 36 Sqm 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
53 19 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
54 8 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
55 8 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
56 8 Sqm 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
57 15 Sqm 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
58 15 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
59 84 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
60 34 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
61 3 Sqm 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
62 15 Sqm 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
63 6.5 RM 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
64 3 Sqm 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
65 2 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
66 122.92999999999999 Cum 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
67 226.41000000000003 Cum 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
68 43 Sqm 100 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
69 43 Sqm 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
70 1 Cum 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
71 40 Sqm 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
72 6 Cum 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
73 2.7 Cum 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
74 20 RM 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
75.01 75.01 10 Per Point 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
75.02 75.02 51 Per Point 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
75.03 75.03 25 Per Point 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
75.04 75.04 2 Per Point 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
76 76 6 Per Point 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
88 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
4 Each 100 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
27 Each 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
4 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
61 Each 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Each 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
6 Each 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
2 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
4 Each 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
1 Each 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
2 Each 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
1 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
1 Each 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
90 90 12 Each 10 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
91 91 50 Each 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
92 92 50 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
93 93 20 Each 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
Total in Figures
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_829081.xls
BOQ • 2.32 MB
Tender.pdf
Tender Documents • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .