Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹13.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹13.7 LRejected-AOC | ₹13.7 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | MOHAMED SHAZAHAN B L2 | R. Rajesh L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation | 120.54 | Cum | 269 ₹32,425.26 | 264 ₹31,822.56 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 17.22 | Cum | 5,718 ₹98,463.96 | 5,707 ₹98,274.54 |
| 3.00 | Centering and shuttering charges for side wall side works including cost and coveyance of all labour charges | 337.36 | Sqm | 395 ₹1.3 L | 390 ₹1.3 L |
| 4.00 | Cement concrete 1:3:6 mix using 40 mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 150.02 | Cum | 5,991 ₹9.0 L | 5,980 ₹9.0 L |
| 5.00 | GST at 18% | 1 | nos | 2,09,324.92 ₹2.1 L | 2,08,581.68 ₹2.1 L |
Tender Value
₹13.8 L
EMD Value
₹13,850
Closing Date
17 Feb 2026, 3:45 pmClosed
Block Development Officer VP
Varusanadu Road,K.Myladumparai
Construction of Protection wall in Thalaiyuthu Tribal People street at muthalamparai panchayat
2026_RDTN_655957_1
2507/2025/T3
Open Tender
Civil Works - Buildings
90 days
Muthalamparai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹13,850
14 May 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for side wall side works including cost and coveyance of all labour charges
Cement concrete 1:3:6 mix using 40 mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
GST at 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
technical.pdf
Tender Documents • 0.47 MB
price.pdf
Tender Documents • 0.36 MB
BOQ_786579.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid