| 1 | L1₹3.4 CrAccepted-AOC T R P ROAD HAIBARGAON NAGAON ASSAM PIN 782002 | NAGAON | ASSAM | 782002 | ₹3.4 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.4 Cr+₹15,000 (0.04%)Rejected-Finance HAIBARGAON NAGAON ASSAM | NAGAON | ASSAM | 782001 | ₹3.4 Cr+₹15,000 (0.04%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Premdhan Construction Co L1 | SANWARMAL KHETAWAT L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. i) By Manual Means, A.In area of non thorny jungle: | 5 | Hect | 1,00,000 ₹5,00,000 Lowest | 1,00,000 ₹5,00,000 Lowest |
| 2.00 | Compacting Original Ground
(i) Compacting original ground supporting subgrade
Loosening, Levelling and Compacting original ground supporting embankment to
facilitate placement of first layer of embankment, scarified to a depth of 150 mm,
mixed with water at OMC and then compacted by rolling so as to achieve
minimum dry density as given in Tables 300.1 and 300.2 for embankment
construction as per Technical Specification Clause 303.5.2 | 15,000 | Cum | 44 ₹6,60,000 Lowest | 45 ₹6,75,000 |
| 3.00 | Removal of Unsuitable Soil with Disposal upto 1000 m
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause
303.5.2 as per Technical Specification Clause 302.3.11 | 3,795 | Cum | 70 ₹2,65,650 Lowest | 70 ₹2,65,650 Lowest |
| 4.00 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 3,795 | Cum | 1,000 ₹37,95,000 Lowest | 1,000 ₹37,95,000 Lowest |
| 5.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(i) Private Land | 1,526.03 | Cum | 250 ₹3,81,507.5 Lowest | 250 ₹3,81,507.5 Lowest |
| 6.00 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (I) Private Land | 3,160.31 | Cum | 250 ₹7,90,077.5 Lowest | 250 ₹7,90,077.5 Lowest |
| 7.00 | Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method : Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material | 1,866.01 | Cum | 3,400 ₹63,44,434 Lowest | 3,400 ₹63,44,434 Lowest |
| 8.00 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | 1,866.01 | cum | 4,500 ₹83,97,045 Lowest | 4,500 ₹83,97,045 Lowest |
| 9.00 | Prime coat i) Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 7,014.02 | cum | 50 ₹3,50,701 Lowest | 50 ₹3,50,701 Lowest |
| 10.00 | Tack Coat. ii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 13,615.23 | cum | 40 ₹5,44,609.2 Lowest | 40 ₹5,44,609.2 Lowest |
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
12 Mar 2026, 2:00 pmClosed
CE, PWRD
CE, PWRD
SOPD_G_25_26_66 Construction of 3 Nos. of Helipads along with Double layer barricading including link roads of Helipads and Parking for fire tender and Ambulance at Mouchanda Pather, Kaliabor for the visit of Honble Prime Minister of India for founda
2026_PWD_51683_1
CE/DEV/TB/295/2025-26/02 Dtd- 02.03.2026
Open Tender
Civil Works – Roads
Item Rate
30 days
Nagaon
Please refer Tender Documents
5 documents required · 5 mandatory
₹6,760
₹6.8 L
Yes
CE, PWRD
27 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
12 Mar 2026
6 Mar 2026
5 Mar 2026 - 6 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. i) By Manual Means, A.In area of non thorny jungle: | 5 | Hect | 52,995.01 | ₹2,64,975.05 |
| 2 | Compacting Original Ground
(i) Compacting original ground supporting subgrade
Loosening, Levelling and Compacting original ground supporting embankment to
facilitate placement of first layer of embankment, scarified to a depth of 150 mm,
mixed with water at OMC and then compacted by rolling so as to achieve
minimum dry density as given in Tables 300.1 and 300.2 for embankment
construction as per Technical Specification Clause 303.5.2 | 15,000 | Cum | 36.16 | ₹5,42,400 |
| 3 | Removal of Unsuitable Soil with Disposal upto 1000 m
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause
303.5.2 as per Technical Specification Clause 302.3.11 | 3,795 | Cum | 67.8 | ₹2,57,301 |
| 4 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 3,795 | Cum | 1,644.26 | ₹62,39,966.7 |
| 5 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(i) Private Land | 1,526.03 | Cum | 258.21 | ₹3,94,036.21 |
| 6 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (I) Private Land | 3,160.31 | Cum | 339.68 | ₹10,73,494.1 |
| 7 | Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method : Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material | 1,866.01 | Cum | 2,843.6 | ₹53,06,186.04 |
| 8 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | 1,866.01 | cum | 4,200.26 | ₹78,37,727.16 |
| 9 | Prime coat i) Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 7,014.02 | cum | 39.78 | ₹2,79,017.72 |
| 10 | Tack Coat. ii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 13,615.23 | cum | 13.33 | ₹1,81,491.02 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
Tendernotice_2.pdf
PDF • 8.31 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_81997.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .