Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹16.4 L+₹42,979.18 (2.69%)Rejected-Finance | L2 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 3 | L3₹16.5 L+₹45,110.07 (2.82%)Rejected-Finance 301 CHAMUNDA ENCLAVE PLOT NO 89 AIROLI SECTOR 8A NAVI MUMBAI 400 708 | THANE | MAHARASHTRA | 400708 | L3 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 4 | L4₹16.5 L+₹51,370.24 (3.21%)Rejected-Finance | L4 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 5 | L5₹16.5 L+₹53,717.98 (3.36%)Rejected-Finance | L5 | Rejected-Finance HIGHER THEN L1 BIDDER |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
16 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE
HQ 136 WORKS ENGINEERS PIN - 914136 C/O 99 APO
REPAIR/ REPLACEMENT/ MAINT OF 11 KV HT OVERHEAD AND UNDER GROUND ELECTRIC SUPPLY NETWORK AND CONNECTED ITEMS AT KALIMPONG UNDER GE 867 EWS
2022_MES_508281_1
CWE/136-WE/50 OF 2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Kalimpong
Class E, Category b(ii)
8 documents required · 8 mandatory
₹500
GE 867 EWS
₹30,000
Yes
5 May 2022
15 Feb 2022
17 Mar 2022
15 Feb 2022
16 Mar 2022
3 Mar 2022
15 Feb 2022 - 22 Feb 2022
60 days
Amount
Excavation in trenches/ foundation in soft/ loose soil not exc. 1.5 metre wide and n exc. 1.50m depth for stay assembly /pole foundation or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out including forming bottom surface to required level or slope, complete all as specified and directed.
Excavation in trenches/ foundation in soft/ loose soil not exc. 1.5 metre wide and exc 1.5m depth and n exc. 3.0m depth for stay assembly /pole foundation or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and getting out including forming bottom surface to required level or slope, complete all as specified and directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm each layer of any kind of soil as all specified and directed.
Removing excavated material (soils) n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed.
Material & labour for Trimming of tree branches which touches the HT OH lines and 2.5 m away from centre line of HT OH lines, span not exceeding 60 m distance between poles by using neccessory T&P items and depositing the tree branches/leaves at 30 m away from the site complete all as specified and directed. Note:- Any number of tree branches cut in one span will be measured as one lenght of payment.
Dismantling / Taking down of cross-arms of M.S. channel or angle sections etc. complete and setting aside for re-use with in 50 m, all as directed and specified.
Material & labour in replacement of cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 50 sqmm to 95 sqmm, all as specified and directed. Note:- Earth work will be measured and paid separately against relevant item.
Material & labour in replacement of cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 50 sqmm to 95 sqmm, all as specified and directed. Note:- Earth work will be measured and paid separately against relevant item.
Material & labour for painting of four pole structure by one coat of aluminium paint including steel structure of 4 pole structure (above planting depth ) 11.0 m long steel tubular pole and mild steel work i.e. cross arms, bracing , clamps,with painting Yellow and black strip 30 cm wide up to 1.5 m height from the copping level etc complete all as specified and directed. Note:- Contractor or his authorised representative should take necessary shutdown before painting work and should be present at sited during the work.
Material & labour for painting of two pole structure by one coat of aluminium paint including steel structure of 2 pole structure (above planting depth) 11.0 m long steel tubular pole and mild steel work i.e. cross arms, bracing , clamps,with painting Yellow and black strip 30 cm wide up to 1.5 m height from the copping level etc complete all as specified and directed. Note:- Contractor or his authorised representative should take necessary shutdown before painting work and should be present at sited during the work.
Material & labour for painting of steel tubular 11.0 m long HT pole , 410-SP-31, vertical complete with cross arms with one coat of aluminium paint after cleaning and preparation of surfaces of poles, cross arms,with painting 30 cm wide yellow and black strip on poles up to 1.5 m high above coping level and numbering with writing letters or figures (Block), height n'exc 10 cm high & letters or figures n'exc 10 Nos for electric HT straight pole , strut pole, 2 pole / 4 pole structure complete all as specified and directed. Note:- Contractor or his authorised representative should take necessary shutdown before painting work and should be present at sited during the work.
Supply only of new transformer oil for topping up all as specified and directed. Make -Power Oil / Castrol / HP.
Filtration and dehydration of transformer oil to achieve test result as per IE rules with filtration plant. Notes:- (i) The filtration of transformer oil of various transformers is to be carried out at different sub stations of Kalimpong mil area and Contractor should check the feasibility how to filter the oil of transformer before coating rate and if any additional pipe or material is required to reach the transformer, cost for the same is deemed to be included. (ii) The report before filtration and after filtration to be submitted by contractor in the approved format. (iii) The filtration is to be carried out on line ie without switching off supply. (iv) Oil for topping up will be measured and paid seperately under respective items of Sch 'A'.
Material & labour for General Servicing and Testing of 11 KV Indoor Vacuum Circuit Breaker (Cleaning, oiling, greasing, IR Value check, Electrical and mechanical operation check & adjustment, primary injection of CTs to check the TMS of relay and time coordination) including checking auxiliary supply and control voltage, physical checking of breakers, epoxy housing, carryout physical verification of any wear and tear in breaker and rectified it, checking fixed and moving contracts, spring charging motor, control circuit & tighten the connections and close or trip coil, clean the breaker compartment through lubricate the breaker, apply grease/ petroleum jelly on required part complete all as specified and directed.
Material and labour for fault finding and repair/ replacement of defective control wiring of tripping circuit, closing circuit, potential transformers, ampere meter, voltmeter,current transformers, thermostate and heating element circuits of indoor type 11 KV VCB using with 2.5 sqmm copper flexible PVC insulated wire and suitable size of copper lugs and thimbles and connector, complete all as specified and directed.
Material and labour for painting of 11 KV VCB with super enameled paint after scapping the existing paint, complete all as specified and directed.
Material and labour for earhing complete with galvanized steel earth plate electrode 600X600X6mm buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5m below ground level, connected to galvanized earth wire 4 mm dia, by means of galvanized iron or steel bolts, nuts, check nuts and washers, and conneced to equipments as directed, including funnel with GI light grade watering pipe 20 mm bore, wire mesh charcoal and common salt in alternate layers, of 15 cm compacted thickness all around the earth electrode, with concrete pit in PCC 1:3:6 type C-1 , 50 mm thick pre cast RCC 1:2:4 type B1 cover slab reinforced with 8 mm dia reinforced bar 15 cm C/C and earth lead handle protection including necessary excavation earth work in soft/loose soil and disposal of spoil to a distance n.exc.50m and necessary testing complete all as shown on electrical plate No.5 of MES SSR Part-I and all as specified and directed.
Supply and fix of limit switch suitable for 11 KV VCB of existing make (Schnieder) complete all as specified and directed.
Cleaning of area of 11 KV yards, Transformer yard, 4 pole / 2 pole structures including cutting of shrubs and bushes all as specified and directed at site whenever required at site.
Material and labour for cross arms, bracings, supports clamps, stay clamps etc fabricated from structural steel sections including nuts, bolts, washers welding bending cold or hot drilling holes for bolts any size of shape and including hooks and clamps for aerial bunch cable as indicated and directed and inclusive of two coats of aluminium painting over a coat of red oxide primer, complete all as specified and directed.
Material and labour for plain cement concrete(1:3:6), type C-2 (using 40 mm graded stone aggregate) in foundations of pole, stay, plinth of transformer, mass concrete etc, all as specified and directed.
Material and labour for plain cement concrete(1:3:6), type C-1 (using 20 mm raded stone aggregate) for padestal copings including weathering, slightly rounded or chamfered angles and throating including necessory form work, all as specified and directed.
Shifting of steel tubular swaged pole (11.0 metres long) from one location to other location up to 2 km distance at station complete all directed inluding cros arms all as spcified an directed. Note:- Necessary Excavation, returning filling, PCC will be measured under respective items.
Material and labour for cleaning of old painting surfaces by cleaning agents including removing dirt, dust, oil, grease etc of transformer capacity 75 KVA to 400 KVA at different sub station and providing two coats of synthetic enameled spray paint including writing SM/MES/Machine Numbers and date of painting, complete all as specified and directed.
Material and labour for painting of chain link fencing and cover fencing of transformer (where required) any mesh, size and type by means of two coat of aluminium paint including line wires, MS flat angle and barbed wire by means of two coat of bituminous paint of sub stn, complete all as specified and directed. Note for item 24.00 & 25.00:- Contractor or his authorised representative should take necessary shutdown before painting work and should be present at site during the work.
Supply and laying. jointing, testing and commissioning HT XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy duty) with aluminium conductor, 11000 volts Earthed, grade cross sectional area 95 sq. mm, 3 core, all as specified and directed.
Material and labour for repairing of damaged / unserviceable gang operate devices(GOD) of 11 KV such as male and female contacts, flexible jumpers, MS jumper carrier and back connector plate includind cleaning and greasing of complete contacts of GOD unit, DO fuse unit and reluging of aluminium conductors connected to top and bottom contacts of GOD and DO units including welding and threading of operating rod mechanism complete making serviceable all as specified and directed. Note:- (i) Necessary parts like knife, male / female contacts and aluminium conductor for jumpering will be measured and paid separately against respective item. (ii) Rates for welding machine, threading arrangements, grease, jumper, nut bolts tightening and binding wire, aluminium conductor wire deemed to be included in quoted rates.
Material and labour for disconnecting the electric connection from over head line with care and removing the faulty step down transformer from two / four pole structure / platform and opening for inspection of Engr-in-Charge, fault finding and minor repairing / servicing of transformer and repair / replacement of worn out spares as directed at site and cleaning the transformer body thoroughly with cotton and sand paper and reassembling, refilling of transformer oil, installation the same on its existing position connecting and testing complete 11/0.433 KV transformer of 25 to 400 KVA capacity, all as specified and directed. Notes:- (i) The material required for replacement of faulty parts will be measured and paid separately under relevant item. (ii) The cost for fault checking / fault finding, servicing and minor repairing including minor parts is deemed to be included in quoted rate. (iii) New transformer oil topping up after repair will be measured and paid separately against relevant item. (iv) New items such as HT/LT bush insulators, HT/LT bush rod of brass, rubber gasket will be measured under respective items.
Supply only for replacement of HT 11 KV bush insulator suitable for distribution transformer of any type and of following size, all as specified and directed:
Upto 200 KVA,
250 KVA to 630 KVA
Supply only for replacement of LT bush insulator suitable for distribution transformer of any type and of following size, all as specified and directed:
Upto 200 KVA,
250 KVA to 630 KVA
Supply only for HT bush rod made out of brass with nut bolt and washer suitable for distribution transformer any type of following capacity, all as specified and directed:
Upto 200 KVA,
250 KVA to 630 KVA
Supply only for LT bush rod made out of brass with nut bolt, rubber packing and washer suitable for distribution transformer any type of following capacity, all as specified and directed:
Upto 200 KVA,
250 KVA to 630 KVA
Supply only for replacement of rubber/ cork sheet gasket set complete suitable for transformer of any type of following size, all as specified and directed:
Upto 200 KVA,
250 KVA to 630 KVA
Supplying and laying reinforced precast concrete cable cover, class HV, Type 1, flat, size 300mmx l80mm x 40mm, all as specified and directed.
Material and labour for sand for cushioning to underground cable screened un-washed river sand and punning for cushioning to cable all as specified and directed.
Material and labour for replacement of indoor type Potential transformer of 11 KV, 3 Phase, input voltage 11 KV, out put voltage 110 volts complete all as per existing specification complete as specified and directed.
Material and labour in replacement for tubular battery 12 volts, 180 AH with connected accessories suitable for 24 volts inverter complete complete as per existing specification, complete all as specified and directed. Make: EXIDE (Model - FXP0-XP1300) or equvilent model of AMCO, NICCO, AMARON.
Supply and fix in replacement of unserviceable Hybrid HB inverter UPS suitable for input voltage 100 -300 VAC, out put 210 V, Capacity 1650 VA suitable for 02 battery system, charging current 14 Amps, smart overload and short circuit sense, display indications (status & fault), PWM controlled multistage ATM (Automatic Trickle Mode) charging, Digital signal controller (DSC) based Intelligent Control Hybird Design, Pure and stable Sinewave output with very low THD, under all battery and load conditions, Unique USS (Ultra Sonic switching) technology ensures absolute Silent operation, IBGM technology including trolley for batteries, complete all as specified and directed. Make of Inverter:- Microtek, Luminus, Exide, M/S Live Line Electronics. Make of Trolley:- Microtek, Luminus, Exide
Material and labour in replacement of HT insulationg mat as per IS- 15562: 2006 comprising of Class C, 3mm thick , di-electric strenght, 65 KV, dimension (1m X 2 m) blue in colour, complete all as specified and directed. Make:- Vardhman, Aicon or equivalent make conforming to IS.
Material & labour for distilled water for batteries of DG set, all as specified and directed.
Material & labour for one coat of synthetic enamel paint over one coat of red oxide primer on existing steel surfaces of any description over 10cm in width or girth includind preparation of surfaces complete all as specified and directed
Material and labour for dismantling of the transformer after opening the external metal cover and lifting the core and winding assembly complete survey and preparation of survey report, complete all as specified and directed.
Material and labour for new copper wire for HV (11 KV) coils complete all as specified and directed.
Material and labour for rewinding charges of the above HV (11 KV) copper coils including coil forma charges complete all as specified and directed.
Material and labour for re-insulation charges of the existing LV (433) volt copper strip wire with supply of high quality insulation paper after through cleaning of existing insulation and washing it through CTC, complete all as specified and directed.
Material and labour for rewinding charges of the above LV (433 volts) copper coils including coil forma charges complete all as specified and directed.
Replacement of old unserviceable insulating material like; Glass tube, Bakelite Tube, Glass tape, Pre-Compress Board, crape paper, press phan paper cotton tape, varnish etc, all as specified and directed.
Material and labour for re-assembling of both HV & LV coils after core binding and reconnection of coils and drying the assembly through heating and testing, complete all as specified and directed.
Material and labour for box up the above transformer after cleaning of tank and refitting of bushing and testing, complete all as specified and directed.
Material and labour for gasket washer for radiator, consrvator tank , vent pipe etc, complete all as specified and directed.
Material and labour for new seal for bushing, all as specified and directed.
Material and labour for transportation, loading and unloading of transformer from MES power house to factory and returning back serviceable transformer to MES power house, complete all as specified and directed.
Note 1:- (Applicable for all parts/items) : The biidders/contractors are advised to read tender document, all drawings & all corrigendum/amendments and general condition of contracts before entry/quoting the rates. Note 2:-The contract sum shall be arrived at after deducting amount of schedule of credit from the total quoted amount.
MS MAYA PRAKASH GOEL AND SONS
S K ENTERPRISES
SANJAY SAW MILL
KAMLESH ENTERPRISE
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .