Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -58.11% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 L+₹36,495.64 (7.45%)Admitted-Finance | -54.99% | ₹5.3 L+₹36,495.64 (7.45%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹1.1 L (22.9%)Admitted-Finance | -48.51% | ₹6.0 L+₹1.1 L (22.9%) | L3 | Admitted-Finance |
| 4 | L4₹6.4 L+₹1.5 L (31.4%)Admitted-Finance | -44.95% | ₹6.4 L+₹1.5 L (31.4%) | L4 | Admitted-Finance |
| 5 | L5₹7.4 L+₹2.5 L (50.4%)Admitted-Finance | -37.00% | ₹7.4 L+₹2.5 L (50.4%) | L5 | Admitted-Finance |
Tender Value
₹11.7 L
EMD Value
₹23,400
Closing Date
7 Aug 2026, 4:00 pmClosed
ER Iqbal Ganie
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_316511_1
NIT 30 of 2026-27 Dated 17-07-2026
Open Tender
Civil Works
Percentage
60 days
Banihal
Refer to SBD
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RnB Division Banihal
₹23,400
Executive Engineer PWD RnB Division Banihal
17 Aug 2026
17 Jul 2026
8 Aug 2026
17 Jul 2026
7 Aug 2026
17 Jul 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All Kinds of Soil | 99.99 | cum | 256.85 | ₹25,682.43 |
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary Rock | 42.85 | cum | 493.5 | ₹21,146.48 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% boulders | 174.1 | cum | 4,774.46 | ₹8,31,233.49 |
| 0.0 | Centring and shuttering including strutting propping etc. and removal of form for :- Walls ( any thickness ) including attached pilasters , butteresses , plinth and string course . | 198.4 | sqm | 628.95 | ₹1,24,783.68 |
| 0.0 | Carriage of Material by Mechnical Transport including Loading, including stacking
1. Sand for an avg lead of 110 Km | 57.28 | cum | 1,403.54 | ₹80,394.77 |
| 0.9 | 2. Aggregate below 40 mm for an avg lead of 40 Km | 108.46 | cum | 630.74 | ₹68,410.06 |
| 0.0 | 3. Stone for an avg lead of 10 Km by MT | 34.82 | cum | 328.31 | ₹11,431.75 |
| 0.9 | 4. Cement for an avg lead of 10 Km by MT | 26.81 | Tonne | 248.03 | ₹6,649.68 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1032170.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .