Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC MODEL TOWN 30 D NEAR GOVT SR SEC SCHOOL KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹3.9 L | L1 | Accepted-AOC ok |
| 2 | L2₹4.0 LRejected-Finance 92D BAJAJ COLONY NEAR GRAIN MARKET GHARAUNDA DISTT KARNAL | GHARAUNDA | KARNAL | HARYANA | ₹4.0 L | L2 | Rejected-Finance L2 |
Tender Value
₹4.6 L
EMD Value
₹9,160
Closing Date
20 Mar 2026, 5:00 pmClosed
Pardeep Kalyan
Municipal Corporation Karnal
Repair and renovation work at Old M.C Store near Jundla Gate M.C. Karnal.(Only for L/C Societies)
2026_HRY_508242_1
20269D9DB9BC ED61 4FF8 8B18 55A6EA5AC6DA747ULB
Open Tender
Civil Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹9,160
Yes
3 Apr 2026
13 Mar 2026
21 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.57]Providing and laying average 6mm thick POP Coating on walls, Ceiling, beams and lintels etc. complete in all respects as approved by the Engineer-In-Charge. [Through Rate]
[11.59]Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. [Through Rate]
[11.69.2]Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 2. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre [Through Rate]
[11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate]
[11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[13.37.1]Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 1. 80x1.25 mm M.S. laths with 1.25 mm thick top cover [Through Rate]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [Beyond 5km up to 10km per KM]
[30.21]Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete [Through Rate]
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
[5.41]Removing rolling shutters including top cover, brackets and side guides etc.complete. [Through Rate]
[5.45]Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_587011.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid