| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-Finance | ₹9.5 L | L1 | Accepted-Finance ok |
| 2 | L2₹10.5 L+₹98,883.78 (10.4%)Rejected-Finance CHENAB VALLEY DIVISION HPPWD UDAIPUR HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | ₹10.5 L+₹98,883.78 (10.4%) | L2 | Rejected-Finance Reject |
| 3 | L3₹10.6 L+₹1.1 L (11.3%)Rejected-Finance | ₹10.6 L+₹1.1 L (11.3%) | L3 | Rejected-Finance Reject |
| 4 | L4₹10.9 L+₹1.4 L (14.3%)Rejected-Finance VILL CHUNI P O BAGAHAR TEHSIL KOTKHAI SHIMLA | ₹10.9 L+₹1.4 L (14.3%) | L4 | Rejected-Finance Reject |
| 5 | L5₹12.6 L+₹3.1 L (32.2%)Rejected-Finance | ₹12.6 L+₹3.1 L (32.2%) | L5 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹24,270
Closing Date
14 Aug 2026, 6:55 pmClosed
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
SR to various various Block under IGMC Hospital. SH Providing steel frame work for Shed for shifting LPG Gas bank store for various 5 Nos canteens working under IGMC Shimla .
2026_PWD_140809_1
SD-III-2026-7786-99dt.6-8-26
Open Tender
Civil Works - Buildings
Percentage
30 days
IGMC
As Per SBD
9 documents required · 9 mandatory
₹500
₹24,270
26 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) manual means over areas (exceeding 30 cm in hepth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil including carriage of materials within all leads and lifts. | 32.64 | Per Cubic Metre | 297 | ₹9,694.08 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads and lifts as per direction of the Engineer- in- charge In Foundation and plinth. | 19.01 | Per Cubic Metre | 4,661 | ₹88,605.61 |
| 3 | Providing and fixing 0.60 mm thick prepainted steel sheet Tata Durashine or equivelant in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5microns over 5microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia meter with prepainted limpet and rubber washers complete with all accesoriees as required as per the direction of Engineer-in-charge including carriage of materials upto all leads and lifts. | 64.8 | Per Cubic Metre | 1,059 | ₹68,623.2 |
| 4 | Providing and fixing M.S. BP Sheet 2mm thick in eaves board/facia/soffits/ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instruction of Engineer-in charge (Base members of steel work shall be measured and paid separtely) including carriage of materials within all leads and lifts. | 21.6 | Per Cubic Metre | 1,483 | ₹32,032.8 |
| 5 | Structural steel work in tublar section riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including carriage of materials within all leads and lifts. | 6,602.2 | Per Metric Tonne | 97 | ₹6,40,413.4 |
| 6 | Providing and fixing 5.00mm thick Chequered plates including cutting, welding complete in flooring over steel frame work (frame work to be measured and paid for separately) including carriage of materials within all leads and lifts as per direction of the Engineer- in- charge. | 1,922.4 | Per Cubic Metre | 106 | ₹2,03,774.4 |
| 7 | Providing and fixing 0.40mm thick prepainted liner steel sheet in soffits including fixing with prepainted limpet and rubber washers complete with all accesoriees as required as per the direction of Engineer-in-charge including carriage of materials upto all leads and lifts. | 168 | Per Cubic Metre | 890 | ₹1,49,520 |
| 8 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture | 375.19 | Each | 55 | ₹20,635.45 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
SBD1213298.pdf
Tender Documents • 5.06 MB
BOQ_208896.xls
BOQ • 0.39 MB
Corrigendum1213.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .