SE EDC-II GORA BAZAR RAEBARELI
SE EDC-II GORA BAZAR RAEBARELI
INCREASING CAPACITY OF DIFFERENT CATEGORIES T/F UNDER EDD SALON
2024_MVVNL_923781_1
TENDER NO 224/EDCR-II/2023-24
Open Tender
Electrical Works
Item Wise
30 days
EE EDD SALON
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
ICICI BANK A/C NO 081205500344/IFSCODE ICIC0000812
₹25,000
Yes
29 May 2024
1 May 2024
22 May 2024
3 May 2024
21 May 2024
3 May 2024
Amount
CORTAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONGWITH LOADING UNLOADING AND PROPER STACKING:-
25 KVA T/F
63 KVA T/F
100 KVA T/F
250 KVA T/F
8.5 Mtr long PCC Pole.
CABLE ABC (3x50 + 1x35+ 1x16) SQMM.
CABLE ABC (3x95+1x70+ 1x16) SQMM.
LT Cable PVC (3.5X35 sqmm)
LT Cable PVC (1X400 sqmm)
LT Cable PVC (3.5X120 sqmm)
LT Cable PVC (3.5X70 sqmm)
LT XLPE Cable for connecting D.B ( 1X35 sqmm)
ACSR Weasel Conductior
Stay Set Complete (16X1800) mm. Stay Rod
Stay wire (7/10 SWG)
G.I wire 6 SWG & M.S Rod (20X2500) mm
Earthing Complete( 20X2500mm) M.S. Rod & 6 SWG G.I. Wire
Earthing Complete
S.S. Base Angle
11 KV Composit Pin Insulators With Pins
11 KV Composit Disc Insulators 45 KN T&C with Fitting
MS ANGLE CROSS BRASING (65X65X6 MM 2700 MM LONG)
11 KV "V" Type X-Arms (65x65x6)
"T" OFF Channel (125X65X2240 MM)
Top Channel (125X65X2240 MM)
Dropper Channel
Piercing Connector
L.T.D.B. Three Phase
ERRECTION & LABOUR CHARGES:-
Errection of PCC Pole including dragging with Fitting of all accessories as per RESPO Norms.
Grouting of PCC Pole with grouting materials including digging of Pole to pit side as per RESPO Norms.
Digging of Pits, fixing nozzling & grouting of Stay Rod inclucing fitting of all accessories with grouting materials as per RESSPO Norms
Laying , stringing & sagging of ABC (3x50 + 1x35+ 1x16) SQMM.Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of LT Cable PVC (3.5X35 sqmm) Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of ABC (3x95 + 1x70+ 1x16) SQMM. Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of LT Cable PVC (3.5X120 sqmm) Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of LT Cable LT Cable PVC (3.5X70 sqmm) Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of ACSR Weasel Conductor, Including all associated work and making clearance of Road with joint/jumpers and binding on insulator as per RESSPO Norms.
Laying , stringing & sagging of LT XLPE Cable for connecting L.T.D.B ( 1X35 sqmm) 03 Nos, Including all associated work, as per RESSPO Norms.
Digging of Pits of PCC Pole 8.5 Mtr Long then making/grouting of double pole structure by pcc pole with grouting materals and fitting of all required accesories for mounting of T/F on D/pole as per resspo norms. As per Estimate.
Work for Mounting of 25 KVA/63 KVA/100 KVA T/F on existing D/pole along with fitting of all accesories as per resspo norms. As per Estimate.
Earthing of 25 KVA/63 KVA/100 KVA T/F body and Neutral of T/F Complete work as per resspo norms.
Earthing of Pole as per RESPO norms.
Work for Installation/fixing of G.I. Wire 6 Swg & M.S Rod (20X2500) mm
Work for Installation/fixing of MS ANGLE CROSS BRASING (65X65X6 MM 2700 MM LONG)
Work for Installation/fixing of Stay Set 16X1800mm.
Work for Installation/fixing of SS Base Angle
Work for Installation/fixing of Disc Fitting 45 KN (T&C) with Disc Insulator
Work for Installation/fixing of 11 KV Composit Pin Insulators
Work for Installation/fixing of "V" Type X-Arms
Work for Installation/fixing of "T" OFF Channel.
Work for Installation/fixing of LT D.B Three Fase
Work for Installation/fixing of Top Channel.
Work for Installation/fixing of Dropper Channel.
The work for Earthing, Fensing and excavation of new Plinth size 2.00X2.00X1.50 for making outer wall of Plinth by 1st class brick work in Cement mortar of ratio1:6 of filling earth in Plinth and providing Ston ballast and fixing 02 No.90 Iballs Rail pieces (6.9 Mtr) of proper distance and then plastering the top and all side of plinth wall with cement Corse and sand in ratio 1:4 and then proper spraying of water alongwith All materials & Labour for Mounting of 250 KVA T/Fs on Plinth alongwith fitting of all accessories,under BUSINESS PLAN 2023-24, as per RESPO Norms.
Labour Charges for earthing of 250 KVA 11/0.4 KV Power Transformers completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing. All rewuired material will be provided by contractor.
Making/Errection/Installation/painting/gouting/welding/febrication/earthig work of Wirmesh Fancing of Jali alongwith Angle isn size of 35X35X5X2500 mm with Nut & Bolts, Washer, Earthing Rod & G.I. wire. Making of 01 No. Gate by M.S. Angle in size of 35X35X5X1000 mm with Nut & Bolts Washer, Earthing Rod & G.I. wire. One No. Gate of M/S Angle in size of 25X5 mm with wiremesh and each of the same. Grouting of M.S. Angle and other required Angles with Grouting materials as per RESPO Norms, under BUSINESS PLAN 2023-24, under EDD Salon, Raebareli. All rewuired material will be provided by contractor.
Work for Installation/fixing of Stone Pad 300X300X75 mm, Material Provided by Contractor
Work for Installation/fixing of Stay Clamp 5/1/2" , Material Provided by Contractor
Work for Installation/fixing of Eye Hook , Ded End Clamp, Material Provided by Contractor
Work for Installation/fixing of Ded end Eye Hook 3 Phse. Material Provided by Contractor
Work for Installation/fixing of Clmap with nut and bolts for TOP Channel/Dropper Channel/Cross Arm/ "T" Off Channel/Gaurding Angel/D.Box/Stay Pole, Material Provided By the Contractor.
Work forMaking/Tightening of Barbed Wire Material Provided By the Contractor.
Work for Installation/fixing/Tightening of All lug 35 sqmm/10 sqmm/120 sqmm/70sqmm, Material Provided By the Contractor.
All lug 400 sqmm, Material Provided By the Contractor.
11 KV F Bracket with Nut and bolts, Material Provided By the Contractor.
Siddhi Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .