Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAdmitted-Finance 656 VINOBA BASTI SRI GANGANAGAR 335001 RAJ | SRI GANGANAGAR | SRI GANGANAGAR | RAJASTHAN | 335001 | ₹33.1 L | L1 | Admitted-Finance |
| 2 | L2₹34.8 L+₹1.7 L (5.24%)Admitted-Finance 31 TILAK NAGAR SRI GANGANAGAR 335001 RAJ | GANGANAGAR | RAJASTHAN | 335001 | ₹34.8 L+₹1.7 L (5.24%) | L2 | Admitted-Finance |
| 3 | L3₹36.4 L+₹3.3 L (9.99%)Admitted-Finance | ₹36.4 L+₹3.3 L (9.99%) | L3 | Admitted-Finance |
| 4 | L4₹38.2 L+₹5.1 L (15.4%)Admitted-Finance C 1 G 1 138 SRI GANGANAGAR SRI GANGANAGAR SRI GANGANAGAR SRI GANGANAGAR RAJASTHAN 335001 | GANGANAGAR | RAJASTHAN | 335001 | ₹38.2 L+₹5.1 L (15.4%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Due to not enlisted in appropriate Category i.e c(i) |
| Sl No | Description | Qty | Unit | Singla Electricals L2 | P.K ENTERPRISES L3 | jassal engineering L1 | shree jagdamba industries L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking down, dismantling and opening of the compressor model SMC-4-65 (Make ACCEL) for servicing, cleaning, washing, machining and mechanical repair work etc. Checking of its all parts for serviceability/unserviceability and reassembling all serviceable parts all as per original, and replacement of defective parts as required for smooth functioning of the compressor and testing after erection in original position to the entire satisfaction of Engineer-in-charge complete all as specified and directed by Engineer-in-Charge.
Note :- (i) All defective/unserviceable spare parts/items required for over hauling shall be measured and paid for separately under appropriate items mentioned in BOQ here-in-after as supply and fixing.
(ii) Gas charging and compressor oil shall be measured and paid separately under appropriate items of BOQ here-in-after. | 12 | Each Job | 9,000 ₹1,08,000 Lowest | 10,000 ₹1,20,000 | 12,000 ₹1,44,000 | 9,500 ₹1,14,000 |
| 2.00 | Supply and fixing in replacement of connecting rod with bolts during reassembly of the compressor MODEL smc-4-65 Make-ACCEL after servicing complete all as specified and directed by Engineer-in-Charge. | 12 | Each | 1,500 ₹18,000 | 1,000 ₹12,000 | 900 ₹10,800 Lowest | 1,700 ₹20,400 |
| 3.00 | All as per Srl item 02 here-in-before but in replacement of Big end bearing complete all as specified and directed by Engineer-in-Charge. | 16 | Each | 850 ₹13,600 | 700 ₹11,200 Lowest | 800 ₹12,800 | 900 ₹14,400 |
| 4.00 | All as per Srl item 02 here-in-before but in replacement of Small end bearing complete all as specified and directed by Engineer-in-Charge. | 16 | Each | 500 ₹8,000 Lowest | 500 ₹8,000 Lowest | 500 ₹8,000 Lowest | 700 ₹11,200 |
| 5.00 | All as per Srl item 02 here-in-before but in replacement of Cylinder liner complete all as specified and directed by Engineer-in-Charge. | 16 | Each | 1,050 ₹16,800 | 1,500 ₹24,000 | 1,000 ₹16,000 Lowest | 1,100 ₹17,600 |
| 6.00 | All as per Srl item 02 here-in-before but in replacement of Compressor ring set complete all as specified and directed by Engineer-in-Charge. | 16 | Each | 900 ₹14,400 | 250 ₹4,000 Lowest | 800 ₹12,800 | 950 ₹15,200 |
| 7.00 | All as per Srl item 02 here-in-before but in replacement of Crank shaft main bearing complete all as specified and directed by Engineer-in-Charge. | 12 | Each | 800 ₹9,600 Lowest | 1,000 ₹12,000 | 1,000 ₹12,000 | 850 ₹10,200 |
| 8.00 | All as per Srl item 02 here-in-before but in replacement of Oil ring set complete all as specified and directed by Engineer-in-Charge. | 20 | Each | 190 ₹3,800 Lowest | 250 ₹5,000 | 250 ₹5,000 | 200 ₹4,000 |
| 9.00 | All as per Srl item 02 here-in-before but in replacement of Piston (Cat Part No E-14) complete all as specified and directed by Engineer-in-Charge. | 16 | Each | 1,700 ₹27,200 | 2,000 ₹32,000 | 1,000 ₹16,000 Lowest | 1,900 ₹30,400 |
| 10.00 | All as per Srl item 02 here-in-before but in replacement of Piston pin (Cat Part No E-13) complete all as specified and directed by Engineer-in-Charge. | 16 | Each | 500 ₹8,000 | 400 ₹6,400 Lowest | 500 ₹8,000 | 550 ₹8,800 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
27 Aug 2026, 6:00 pmClosed
HQ CWE SRI GANGANAGAR
HQ CWE POST BOX 48 SRI GANGANAGAR-335001 (Rajasthan)
REPAIR / MAINTENANCE OF CENTRAL AC PLANT AT LALGARH JATTAN MIL STN
2026_MES_781867_1
CA NO CWE SGNR/TOKEN-20 OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE LALGARH JATTAN
Class D and above and Category c(i)
8 documents required · 8 mandatory
₹500
GE LALGARH JATTAN
₹80,000
Yes
8 Sept 2026
30 Jul 2026
28 Aug 2026
30 Jul 2026
27 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down, dismantling and opening of the compressor model SMC-4-65 (Make ACCEL) for servicing, cleaning, washing, machining and mechanical repair work etc. Checking of its all parts for serviceability/unserviceability and reassembling all serviceable parts all as per original, and replacement of defective parts as required for smooth functioning of the compressor and testing after erection in original position to the entire satisfaction of Engineer-in-charge complete all as specified and directed by Engineer-in-charge.
Note :- (i) All defective/unserviceable spare parts/items required for over hauling shall be measured and paid for separately under appropriate items mentioned in BOQ here-in-after as supply and fixing.
(ii) Gas charging and compressor oil shall be measured and paid separately under appropriate items of BOQ here-in-after. | 12 | Each Job | - | - |
| 2 | Supply and fixing in replacement of connecting rod with bolts during reassembly of the compressor MODEL smc-4-65 Make-ACCEL after servicing complete all as specified and directed by Engineer-in-charge. | 12 | Each | - | - |
| 3 | All as per Srl item 02 here-in-before but in replacement of Big end bearing complete all as specified and directed by Engineer-in-charge. | 16 | Each | - | - |
| 4 | All as per Srl item 02 here-in-before but in replacement of Small end bearing complete all as specified and directed by Engineer-in-charge. | 16 | Each | - | - |
| 5 | All as per Srl item 02 here-in-before but in replacement of Cylinder liner complete all as specified and directed by Engineer-in-charge. | 16 | Each | - | - |
| 6 | All as per Srl item 02 here-in-before but in replacement of Compressor ring set complete all as specified and directed by Engineer-in-charge. | 16 | Each | - | - |
| 7 | All as per Srl item 02 here-in-before but in replacement of Crank shaft main bearing complete all as specified and directed by Engineer-in-charge. | 12 | Each | - | - |
| 8 | All as per Srl item 02 here-in-before but in replacement of Oil ring set complete all as specified and directed by Engineer-in-charge. | 20 | Each | - | - |
| 9 | All as per Srl item 02 here-in-before but in replacement of Piston (Cat Part No E-14) complete all as specified and directed by Engineer-in-charge. | 16 | Each | - | - |
| 10 | All as per Srl item 02 here-in-before but in replacement of Piston pin (Cat Part No E-13) complete all as specified and directed by Engineer-in-charge. | 16 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_875885.xls
BOQ • 0.31 MB
Tender_20.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .